CITY COMMISSION AGENDA ITEM

vertical_CityOfLawrence-7

 

Department:

Municipal Services & Operations

Commission Meeting Date:  October 2, 2018

Staff Contact:

Amanda Sahin, P.E., Transportation Engineer

Recommendations/Options/Action Requested:

 

Award Bid No. B1846, Massachusetts Street, 14th Street to 11th Street, Lane Reconfiguration (PW18E10), to C-Hawkk Construction, Inc. in the amount of $95,828.50.

 

Executive Summary:

On June 5, 2018, the City Commission authorized the Mayor to sign an agreement with the Kansas Department of Transportation for a two-way left turn lane on Massachusetts Street at 13th Street, and bike lanes from 11th Street to 14th Street (CIP# PW18E10).  The agreement was for $100,000 of Highway Safety Improvement Program (HSIP) funds with a city match of at least ten percent (10%).  Infrastructure Sales Tax funds were budgeted for the project in an amount of $50,000. 

 

The project will eliminate one (1) northbound travel lane, add a left turn lane at 13th Street and add buffered bike lanes in each direction. The bike lanes will be a minimum of five (5) feet (varies throughout the corridor) with an additional two (2) foot painted buffer.  The bike lanes will include green pavement markings at street crossings to draw attention to the presence of a bike lane.  A bike box will be provided in the southbound direction at 14th Street.  The street maintenance contract with Sunflower Paving completed the mill and overlay and centerline striping in advance of this project.

 

Construction plans were developed by Bartlett & West, Inc. at a cost of $26,725.   The project was bid August 21, 2018.  The low bidder was C-Hawkk Construction, Inc., in the amount of $95,828.50.

Strategic Plan Critical Success Factor

Effective Governance/Professional Administration

Safe, Healthy, and Welcoming Neighborhoods

Innovative Infrastructure and Asset Management

Sound Fiscal Stewardship

Fiscal Impact (Amount/Source):

The fiscal impact to the City includes:

Design

$26,725.00

10% Match

   $9883.00

Total

$36,608.00

This project was included in the 2018 CIP budget for $50,000 (PW18E10). 

Attachments:

Bid Tab

Project Schematic

Previous Agenda Reports:

 

June 5, 2018, Consent #15

Authorize the Mayor to execute Kansas Department of Transportation/City agreement No. 89-18 for a two-way left turn lane on Massachusetts Street at 13th Street and bike lanes from 11thStreet to 14th Street and adopt on first reading, Ordinance No. 9476, prohibiting parking on the east side of Massachusetts Street from North Park Street to 14th Street, and the west side of Massachusetts Street from South Park Street to a point 250 feet south of 13th Street.  Staff Memo & Attachments

 

August 19, 2016, Consent #9

Authorize staff to submit FY 2018/2019 Federal-Aid Safety Program application for improvements on 23rd Street, Ohio Street to Vermont Street, and at 13th Street & Massachusetts Street.  Staff Memo & Attachments

 

 

 