2014 Sidewalk Inventory Defect Report |
4/24/2014 |
|
|
|
|
|
|
|
|
|
Overall |
Defect LF |
x 5 feet wide |
x $6 sqft |
|
|
Overall Total |
203,658 |
1018290 |
$ 6,109,740 |
|
|
|
|
|
|
Arterial |
28,045 |
|
|
Collector |
45,559 |
|
|
Residential |
130,054 |
|
|
|
|
|
|
Vertical Deflection less than or equal
to 1" |
70,590 |
|
|
Vertical Deflection more than 1" |
84,076 |
|
|
Horizontal Gap |
1,516 |
|
|
Tree Roots |
10,346 |
|
|
Cross Slope |
9,250 |
|
|
Brick Reset |
20,398 |
* construction costs would be
calculated differently |
|
|
Manhole |
4,126 |
|
|
Missing Sidewalk |
3,356 |
should be thought of as length of
missing panels in a continuous sidewalk |
|
|
|
|
Arterial Defect Breakdown |
Defect LF |
x 6 feet wide |
x $7 sq ft |
|
|
Arterial Overall |
28,045 |
168,270 |
$ 1,177,890 |
|
|
|
|
|
|
Vertical Deflection less than or equal
to 1" |
10,555 |
|
|
Vertical Deflection more than 1" |
10,801 |
|
|
Horizontal Gap |
80 |
|
|
Tree Roots |
655 |
|
|
Cross Slope |
2,370 |
|
|
Brick Reset |
1,706 |
* construction costs would be
calculated differently |
|
|
Manhole |
1,522 |
|
|
Missing Sidewalk |
356 |
should be thought of as length of
missing panels in a continuous sidewalk |
|
|
|
|
Collector Defect Breakdown |
Defect LF |
x 5 feet wide |
x $6.5 sq ft |
|
|
Collector Overall |
45,552 |
227,760 |
$ 1,480,440 |
|
|
|
|
|
|
Vertical Deflection less than or equal
to 1" |
16,582 |
|
|
Vertical Deflection more than 1" |
18,666 |
|
|
Horizontal Gap |
421 |
|
|
Tree Roots |
2,012 |
|
|
Cross Slope |
1,685 |
|
|
Brick Reset |
4,845 |
* construction costs would be
calculated differently |
|
|
Manhole |
888 |
|
|
Missing Sidewalk |
460 |
should be thought of as length of
missing panels in a continuous sidewalk |
|
|
|
|
Residential Defect Breakdown |
Defect LF |
x 5 ft wide |
x $6 sqft |
|
|
Residential Overall |
130,054 |
650,270 |
$ 3,901,620 |
|
|
|
|
|
|
Vertical Deflection less than or equal
to 1" |
43,453 |
|
|
Vertical Deflection more than 1" |
54,609 |
|
|
Horizontal Gap |
1,015 |
|
|
Tree Roots |
7,679 |
|
|
Cross Slope |
5,195 |
|
|
Brick Reset |
13,847 |
* construction costs would be
calculated differently |
|
|
Manhole |
1,716 |
|
|
Missing Sidewalk |
2,540 |
should be thought of as length of
missing panels in a continuous sidewalk |
|
|
|
|
|
|
|
|
|
|