Goal 1: Improve Programs and Service Delivery. |
|
|
|
|
|
Objective 1.1: |
|
|
|
|
|
|
|
|
Increase programming using plublic input and recreational trends |
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
1.1.a |
|
|
|
|
|
Pursue
more active opportunities for Baby Boomers who may not attend traditional
senior center activities. |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.b |
|
|
|
|
|
Initiate
programming sessions to enhance youth non-sports activities where possible |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.c |
|
|
|
|
|
Work
with Boys & Girls Club to allow teens and tweens to assist in creating
programs and activities they will attend |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.d |
|
|
|
|
|
When
tournament quality facilities are available, create outdoor economic impact
sports events |
N/A |
TBD |
Short
Term |
|
|
1.1.e |
|
|
|
|
|
Offer
more fitness & wellness classes |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.f |
|
|
|
|
|
Offer
more hobby interest programs |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.g |
|
|
|
|
|
Offer
more outdoor recreation and nature programs |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.h |
|
|
|
|
|
Initiate
programming sessions weekday evenings and weekends |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.i |
|
|
|
|
|
Offer
more adult sports programs |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.j |
|
|
|
|
|
Research
and implement programs in partnership with local outreach; adopt inclusion
policy; ADA language |
N/A |
TBD |
Short
Term |
|
|
1.1.k |
|
|
|
|
|
Develop
Bike & Pedestrian safety programs with local partners |
N/A |
TBD |
Short
Term |
Ongoing |
|
1.1.l |
|
|
|
|
|
Create
additional community events |
N/A |
TBD |
Short
Term |
Ongoing |
|
Goal 2: Provide New or
Improved Facilities and Amenities. |
|
|
Objective 2.1: |
|
|
|
|
|
Maintain
and/or upgrade existing facilities and build new amenities and facilities |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
2.1.a Holcom Park Center |
|
TBD |
|
|
|
Replace
HVAC units in gym. |
$250,000 |
|
Short Term |
Completed 2017 |
|
|
|
|
|
|
|
Resurface
North Parking Lot. |
$104,000 |
|
Short Term |
Completed 2018 |
|
|
|
|
|
|
|
Interior
remodel, floor, gym floor, restrooms. |
$75,000 |
|
Short Term |
Completed 2017 - Gym Floor |
|
|
|
|
|
|
|
Replace
Ball Diamond Light on Complex. |
$500,000 |
|
Short Term |
Completed 2017 |
|
|
|
|
|
|
|
Major
enhancements to Holcom Recreation Center workout/weight rooms and additional
program space. (2,500 – 3,000 sf addition). |
$800,000 |
|
Long Term |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.1.b East Lawrence Center |
|
TBD |
|
|
|
Add
Parking Lot. |
$83,000 |
Short Term |
Completed 2018 |
|
|
|
|
|
|
Interior
remodel, floor, gym floor, restrooms. |
$75,000 |
Short Term |
Completed 2017 - Gym Floor,
Lobby Floor and Meeting Room |
|
|
|
|
|
|
Major
enhancements to the East Lawrence Center workout/weight rooms and additional
program space. (2,000 – 2,500 sf addition). |
$600,000 |
Long Term |
|
|
|
|
|
|
|
2.1.c Community Building |
|
TBD |
|
|
|
HVAC
Replacements. |
$200,000 |
Short Term |
Completed 2017 |
|
|
|
|
|
|
Interior
meeting room renovations. |
$100,000 |
Short Term |
Completed 2018 |
|
|
|
|
|
|
Major
enhancements to the Community Building workout/weight rooms and additional
program space. (3,000 – 3,500 sf renovation). |
$600,000 |
Long Term |
|
|
|
|
|
|
|
2.1.d
Lawrence Loop Trail |
|
TBD |
|
|
|
Install
new section on 29 the street to Haskell. |
$300,000 |
Short Term |
|
|
|
(south) |
|
|
|
|
|
|
|
|
Develop
trail from hospital to Peterson Road. |
$300,000 |
Short Term |
|
|
|
(west) |
|
|
|
|
|
|
|
|
|
Finish
the Lawrence trail “loop.” and include new restroom facilities and drinking
fountains. |
$300,000 (southeast) |
Long Term |
Restroom added
at Burroughs Creek 2018, Arboretum Restroom 2019, Downtown section design
2019 (11th street to -8th street) |
|
|
|
|
|
|
2.1.e
Land Acquisition |
|
N/A |
|
|
|
Dedicate
significant dollars to future land acquisition of no less than 3 areas. These
areas to include the west, south, and southeast edges of Lawrence. |
$300,000 |
Short Term |
|
|
|
(south) |
|
|
|
|
|
|
|
|
|
$300,000 |
Short Term |
|
|
|
(west) |
|
|
|
|
|
|
|
|
|
$300,000 (southeast) |
Long Term |
|
|
2.1.f Eagle Bend Golf Course |
|
TBD |
|
|
|
Upgrades
to Eagle Bend Golf Course including the expansion of the clubhouse and
additional parking. |
$500,000 |
Short Term |
Completed 2017 |
|
|
|
|
|
|
Upgrades
to Eagle Bend Golf Course including additional maintenance facilities, add 9
or 18 holes to the course, and an additional pump station. |
|
Long Term |
|
|
|
$1,200,000 |
|
|
|
|
|
|
|
|
2.1.g Historic Structures |
|
N/A |
|
|
|
Carnegie
Building – Clean and tuck point oldest part of building. |
$150,000 |
Short Term |
|
|
|
|
|
|
|
Union
Pacific Depot interior and exterior renovation. |
$75,000 |
Short Term |
2019 CIP |
|
|
|
|
|
|
Preservation
of Historic Structures. |
$700,000 |
Long Term |
|
|
|
|
|
|
|
|
|
|
|
|
2.1.h Downtown |
|
TBD |
|
|
|
Replace
brick pavers in sidewalk |
$375,000 |
Short Term |
Completed 2017 and 2018, added
phases scheduled for 2019 |
|
|
($75,000 for 5 years) |
|
|
|
|
|
|
|
|
Downtown
planter/streetscape improvements |
$500,000 |
Long Term |
|
|
|
|
|
|
|
Locate
and Provide a new downtown event space to include large paved area, water,
power, designated restrooms, and adequate lighting. One potential area for
the new Downtown Event Space is Vermont St. between 7th & 8th St. |
$750,000 |
Long Term |
2018/ 2019 Downtown Master
Planning |
|
|
|
|
|
|
2.1.i Spray Parks |
$450,000 |
TBD |
Short Term |
|
|
Provide
2 new spray parks at John Taylor Park and Burroughs Creek Park. |
($225,000 per park) |
|
|
2.1.j
Spray Parks |
$450,000 |
TBD |
Mid Term |
|
|
Provide
2 new Spray Parks at South Park and Dad Perry Park. |
($225,000per park) |
|
|
2.1.k
Spray Parks |
$450,000 |
TBD |
Long Term |
|
|
Provide
2 new Spray Parks at Holcom Park and Broken Arrow Park. |
($225,000per park) |
|
|
2.1.l Outdoor Aquatic Center |
|
N/A |
|
|
|
Paint
Pool. |
$75,000 |
Short Term |
Completed 2017 |
|
|
|
|
|
|
Replace
Old Slide. |
$95,000 |
Short Term |
|
|
|
|
|
|
|
Remove
and replace bad section of concrete. |
$75,000 |
Short Term |
Ongoing |
|
|
|
|
|
|
Renovate
the Outdoor Aquatics Facility. |
$2,000,000 |
Mid Term |
|
|
2.1.m |
|
TBD |
Mid Term |
|
|
Commit
to an updated (or additional) park space in North Lawrence. Updates to
include a renovated shelter at Lyon Street Park. |
$120,000 |
|
|
|
|
|
|
2.1.n
Amphitheater |
$1,300,000 |
TBD |
Long Term |
|
|
Provide
a new community outdoor amphitheater. |
|
|
2.1.o |
TBD |
TBD |
Long Term |
|
|
Work on
providing a new connection to the Kansas and Wakarusa Rivers with future
riverfront development. Lawrence Parks & Rec has the opportunity to take
on a lead role in this effort. |
|
|
2.1.p Youth Sport Complex |
|
TBD |
|
|
|
Install
ADA compliant restrooms. |
$120,000 |
Short Term |
Completed 2017 |
|
|
|
|
|
|
Install
restroom at west end of complex. |
$125,000 |
Short Term |
Completed 2018 |
|
|
|
|
|
|
Resurface
Speicher Road. |
$100,000 |
Mid Term |
|
|
|
|
|
|
|
Extend
27th Street to Dam
road for second exit. |
$400,000 |
Mid Term |
|
|
|
|
|
|
|
Improve
access from Hwy 10. |
TBD |
Long Term |
|
|
|
|
|
|
|
Develop
paved walking trail. |
$900,000 |
Long Term |
|
|
|
|
|
|
|
Develop
an outdoor “destination complex” for tournaments in Lawrence. Destination
complex to include major enhancements to YSC (additional soccer fields,
football fields, and better site access along with additional parking) and
building a new baseball and softball complex. |
$2,300,000 |
Long Term |
|
|
|
|
|
|
|
2.1.q
Adventure Park |
$750,000 |
TBD |
Long Term |
|
|
Develop
a new Adventure Park that provides activities such as Zip lines. One possible
location could be the Prairie Nature Center. |
|
2.1.r
Develop Parks |
|
TBD |
|
|
|
Green
Meadows Park – Pond trail |
$150,000 |
Short Term |
|
|
Peterson
Park – restroom, parking, dog park |
$200,000 |
Short Term |
|
|
Broken
Arrow Park – Parking Lot |
$100,000 |
Short Term |
|
|
Broken
Arrow Park – Replace Shelter and Restroom |
$350,000 |
Mid Term |
|
|
Burcham
Park – shelter and playground |
$75,000 |
Mid Term |
2019 CIP |
|
Veterans
Park – Upgrade courts |
$115,000 |
Mid Term |
|
|
Deerfield
Park – shelter and restroom |
$120,000 |
Mid Term |
|
|
Overland
Drive Park – playground, shelter, trail |
$200,000 |
Long Term |
|
|
Edgewood
Park – courts and ball diamond |
$75,000 |
Long Term |
|
|
Centennial
Park – Upgrade Skate Park |
$125,000 |
Long Term |
|
|
2.1.s
Dog Park |
$150,000 |
TBD |
Long Term |
|
|
Provide
a new fenced in dog park for east/southeast Lawrence. |
|
|
2.1.t South Park Playground |
$500,000 |
TBD |
Mid Term |
|
|
Provide
“destination” style of playground equipment at South Park. Remove existing
playground equipment and provide ADA approved play surface. |
Playground
replaced in 2018 - not destination |
|
2.1.u |
|
TBD |
Long Term |
|
|
Provide
a new large picnic shelter (200-250 people) including ac/heated gathering
space. |
$800,000 |
|
|
|
|
|
|
2.1.v
Indoor Aquatic Center |
|
N/A |
Short Term |
|
|
HVAC
unit Replacements in Leisure Pool. |
$330,000 |
|
Completed 2017 |
|
|
|
|
|
|
Upgrades
and Improvements to the Indoor Aquatic Center. |
$900,000 |
Short Term |
|
|
|
|
|
|
|
Paint
Pool. |
$100,000 |
Short Term |
Completed 2018 |
|
|
|
|
|
|
Lighting
upgrades. |
$75,000 |
Long Term |
Completed 2017 |
|
|
|
|
|
|
2.1.w |
See Staff Document |
N/A |
On Going |
|
|
Replace
and/or refurbish low scoring park amenities in poor condition. (Amenities
with a score of 1). |
Completed 2017 and 2018
scheduled in 2019 |
|
2.1.x |
TBD |
N/A |
On Going |
|
|
Preserve
natural areas and pocket parks. |
|
|
2.1.y |
TBD |
N/A |
Short Term |
|
|
Upgrade
parking and restroom throughout the system. |
Scheduled for 2019 |
|
2.1.z |
N/A |
Staff Time |
Short Term |
|
|
Create
an ADA Transition Plan. |
Scheduled for
2019 |
|
Goal 3: Organizational Efficiency |
|
|
Objective 3.1: |
|
|
|
|
|
Aspire
to the new recommended organizational chart |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.1.a |
|
|
|
|
|
As
attrition occurs, hire the right people that fit the positions on the new
org. chart |
N/A |
Staff Time |
Short Term |
Ongoing |
|
3.1.b |
|
|
|
|
|
Create
a Succession Plan to address pending retirements |
N/A |
Staff Time |
Short Term |
Ongoing |
|
Objective
3.2: |
|
|
|
|
|
Employ
full time and part time/seasonal positions to the City's advantage |
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.2.a |
|
|
|
|
|
Convert part time to full time positions where it is the most
effective |
N/A |
Added
cost of benefits |
Short Term |
|
|
3.2.b |
|
|
|
|
|
Increase
wages for part-time and seasonal employees to a minimum of $10.50 per hour |
N/A |
$666,720
per year |
Short Term |
maintenance
positions scheduled for 2019 |
|
Objective
3.3: |
|
|
|
|
|
Create a Support Services section of LPRD per
the new recommended organizational chart |
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.3.a |
|
|
|
|
|
Add one Assistant Director
for LPRD |
N/A |
$68,500
per year + Benefits |
Short Term |
Completed 2017 |
|
3.3.b |
|
|
|
|
|
Add one
Support Services Manager to supervise the Support Services section of LPRD |
N/A |
$50,000
per year + Benefits |
Long Term |
Completed 2018 |
|
3.3.c |
|
|
|
|
|
Add one Human Resources
Specialist for LPRD |
N/A |
$50,000
per year + Benefits |
Long Term |
Completed 2018 |
|
3.3.d |
|
|
|
|
|
Add one Finance Manager for
LPRD |
N/A |
$50,000
per year + Benefits |
Long Term |
|
|
3.3.e |
|
|
|
|
|
Add
one Grants, Alliances, Partnerships, and Sponsorships (GAPS) Specialist for
LPRD |
N/A |
$40,000
per year + Benefits (Can bring in more than Paid) |
Long Term |
|
|
3.3.f |
|
|
|
|
|
Add one Customer Services
Registration Specialist for LPRD |
N/A |
$35,000
per year + Benefits |
Long Term |
|
|
Objective
3.4: |
|
|
|
|
|
Define Customers, Target
Markets/Audiences |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.4.a |
|
|
|
|
|
Review preliminary list of
strategies provided and refine |
N/A |
Staff Time |
Short Term |
|
|
3.4.b |
|
|
|
|
|
Assess
existing messages and materials for targeting to identified audiences |
N/A |
Staff Time |
Short Term |
|
|
3.4.c |
|
|
|
|
|
Evaluate
potential for creating specific Marketing Plans and Budgets for Eagle Bend
Golf Course and Sports Pavilion Lawrence and implement as appropriate |
N/A |
Staff Time |
Short Term |
|
|
Objective
3.5: |
|
|
|
|
|
Enhance Partnerships |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.5.a |
|
|
|
|
|
Assess
existing partnerships specifically related to marketing; identify those to
strengthen |
N/A |
Staff Time |
Short Term |
|
|
3.5.b |
|
|
|
|
|
Work
with Explore Lawrence and City Administration to review guest tax proceeds
distribution |
N/A |
Staff Time |
Short Term |
Ongoing |
|
Objective
3.6: |
|
|
|
|
|
Refine Marketing and
Promotion Strategies |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.6.a.(1) |
|
|
|
|
|
Review
Activity Guide for opportunities to make the document more user friendly --
perhaps reorganize; use the guide to move people to the website. Begin to move away from paper to electronic
guide |
N/A |
Staff Time |
Short Term |
Ongoing |
|
3.6.a.(2) |
|
|
|
|
|
Enlist
the help of a volunteer committee to review the website for ease of use |
N/A |
Staff Time |
Short Term |
|
|
3.6.a.(3) |
|
|
|
|
|
Review
the possibilities for redesign of the website to be more friendly, inviting,
and fun within constratins of the overall City system. |
N/A |
Staff Time |
Short Term |
|
|
3.6.b |
|
|
|
|
|
Social
Media review -- present pilot program for increasing immediacy of information
sharing |
N/A |
Staff Time |
Short Term |
Ongoing |
|
3.6.c |
|
|
|
|
|
Simplify online registration |
N/A |
Staff Time |
Short Term |
|
|
Objective
3.7: |
|
|
|
|
|
Public Relations Strategies |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.7.a |
|
|
|
|
|
Design and implement a
one-year program of initial promotions |
N/A |
Staff Time |
Short Term |
|
|
3.7.b |
|
|
|
|
|
Evaluate effectiveness and
revise as appropriate |
N/A |
Staff Time |
Short Term |
|
|
Objective
3.8: |
|
|
|
|
|
Performance Monitoring |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
3.8.a |
|
|
|
|
|
Design
and implement routine surveys relative to effectiveness of marketing and
promotions. Specifically include a
question of where people get their information regarding programs and
activities on all materials |
N/A |
Staff Time |
On Going |
|
|
3.8.b |
|
|
|
|
|
Continue
to track, monitor, and report facility use to support economic impact
measures |
Increase
in CIP |
N/A |
On Going |
|
|
Goal 4: Improve Financial Position of LPRD |
|
|
Objective 4.1: |
|
|
|
|
|
Increase Funding
Opportunities |
|
|
|
|
Actions |
Capital Cost Estimate |
Operational Budget Impact |
Timeframe to Complete |
Year to be Completed |
|
4.1.a |
|
|
|
|
|
Implement
a Cost Recovery Philosophy and Policy to track cost center expenses and
provide consistent, equitable, and fair user fees |
N/A |
$50,000 |
Short Term |
Planned 2019 |
|
4.1.b |
|
|
|
|
|
Implement
Land Dedication (or Fee-In-Lieu) and Developer Impact Fee Policy for all new
residental developments to build trails, parks, and open space approved by
the City |
N/A |
Staff Time |
Short Term |
|
|
4.1.c |
|
|
|
|
|
Pursue
dedicated, ongoing funding source through sales or special Parks and
Recreation district tax |
N/A |
Staff Time |
Mid Term |
|
|
4.1.d |
|
|
|
|
|
Create
and fund a five-year CIP budget for LPRD to plan on deferred maintenance |
TBD |
Staff Time |
Short Term |
Completed annually |
|
4.1.e |
|
|
|
|
|
Investigate
the creation of a LPRD Foundation to solicit tax-deductible donations for
LPRD as well as the Scholarship Fund |
N/A |
Staff Time |
Short Term |
|
|
4.1.f |
|
|
|
|
|
Pursue
new, and continue ongoing, opportunities with universities, schools,
wellness, state, and other public or private opportunities |
N/A |
Staff Time |
On Going |
|
|
4.1.g |
|
|
|
|
|
Maintain
portion of the sales tax so it is distributed equitably as intended when it
passed |
N/A |
Staff Time |
Short Term |
|
|
4.1.h |
|
|
|
|
|
Pursue
sponsorships with appropriate entities |
N/A |
Staff Time |
On Going |
|
|
4.1.i |
|
|
|
|
|
Develop
and adopt a formal Partnership Policy |
N/A |
Staff Time |
Short Term |
|
|
4.1.j |
|
|
|
|
|
Investigate
passing a bond referendum for major facility upgrades |
N/A |
Staff Time |
Long Term |
|
|
4.1.k |
|
|
|
|
|
Develop
and adopt a formal Sponsorship Policy |
N/A |
Staff Time |
Short Term |
Completed 2018 |
|
4.1.l |
|
|
|
|
|
Pursue
partnerships with organizations that can assist with joint programming
opportunities |
N/A |
Staff Time |
On Going |
|
|
|
|
|
|
|
|
|
|
|