Memorandum

City of Lawrence

Municipal Services & Operations

 

TO:

Tom Markus, City Manager

CC:

David P. Cronin, P.E., City Engineer

FROM:

Steven M. Lashley, P.E., Project Engineer

DATE:

February 6, 2019

RE:

2019 Comprehensive Street Maintenance Program – City Manager’s Report

 

Project Background/ Program Map

In August 2018, the City commission approved approximately $3.69 million to be utilized for the overall 2019 Contracted Street Maintenance Program which includes $400,000 from the Curb and Gutter Rehabilitation Program and $100,000 from the Contract Milling for In House Pavement Rehab.  Contracted milling, patching, asphalt overlay, and curb and gutter rehabilitation are planned for 2019 as reflected on the attached “Comprehensive Program” map.

 

The map also shows streets identified for maintenance work such as crack sealing areas and internal street maintenance project locations that include concrete and asphalt rehabilitation work.  Significant project locations such as Capital Improvement Plan (CIP) projects are also shown on the map.

 

Staff recommendations as presented at Transportation Commission

Annually, staff reviews the potential impact of the planned contracted street maintenance work with existing and planned bikeway facilities.  Other CIP projects shown on the program map have gone through the design process for inclusion of appropriate bikeway facilities.

 

The program map was presented to the Transportation Commission at the February 4, 2019 meeting.

 

Staff reviewed the existing bike plan and recommended installing shared lane markings (sharrows) on the planned bikeway network.  These are the following streets with 2019 contracted maintenance and the staff recommended bikeway improvement to be included:

 

Street Location

Recommendation

E 19th St, Massachusetts St to East of Haskell Ave

Reestablish bike lanes

Lawrence Ave, Clinton Pkwy to W 31st St

Install sharrows

Harvard Rd, Wakarusa Dr to Stonecreek Dr

Install sharrows

Congressional Dr, W 6th St to Harvard Rd

Install sharrows

W 7th St, Kentucky St to Indiana St

Install sharrows

Schwarz Rd, Lawrence Ave to W 6th St

Install sharrows

Ridge Ct, W 24th St to W 27th St

Install sharrows

 

These improvements are consistent with the draft bikeway network for the Bikeway Plan update, currently underway.

 

Attachment

2019 Program Map