CONTRACT PRICING WORKSHEET For Standard Equipment Purchases |
Contract No.: |
SW04-18 | Date Prepared: |
12/30/2018 | |||||
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly. | ||||||||||
Buying Agency: |
City of Lawrence | Contractor: | Johnston North America | |||||||
Contact Person: |
Robert Aaron | Prepared By: |
Jason Coover | |||||||
Phone: | 785-832-3020 | Phone: | 682-321-8035 | |||||||
Fax: | 785-832-3075 | Fax: | ||||||||
Email: | raaron@lawrenceks.org | Email: | jason.coover@johnstonnorthamerica.com | |||||||
Product Code: |
B21 | Description: | VT651: vacuum sweeper; dual engine design; auxiliary engine; hopper: 8.5 cu yds; water tank: 415 gallons; dual steering; standard sweep path, max: 144" | |||||||
A. Product Item Base Unit Price Per Contractor's H-GAC Contract: | 154,000 | |||||||||
B. Published Options - Itemize below - Attach
additional sheet if necessary - Include Option Code in description if
applicable (Note: Published Options are options which were submitted and priced in Contractor's bid.) |
||||||||||
Description | Cost | Description | Cost | |||||||
VT651-24 JCB 125 HP Tier 4 Aux Engine | 15,800 | K30153 Rear Work Lights | 775 | |||||||
FL M2-VT651 Freightliner Chassis | 95,000 | VT651-32 In Cab GB Down Pressure Controls | 2,200 | |||||||
VT651-75 Dual Mounted Vision Camera | 2,600 | VT651-52 Hopper Flush | 1,500 | |||||||
VT651-40 GB Lateral Control Dual | 2,100 | |||||||||
VT651-18 High Pressure Power Scrub w/Spray Bars | 9,800 | |||||||||
VT651-20 Catwalk | 725 | |||||||||
VT651-36 GB Tilt Control Dual | 4,100 | |||||||||
VT651-42 Simultainous Sweep | 1,400 | |||||||||
VT651-50 Screen Vibrators | 2,000 | |||||||||
Subtotal From Additional Sheet(s): | ||||||||||
Subtotal B: | 138000 | |||||||||
C. Unpublished Options - Itemize below - Attach
additional sheet if necessary (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.) |
||||||||||
Description | Cost | Description | Cost | |||||||
Stainless Engine Cowl | 3,700 | |||||||||
LED Arrow Stick | 1,800 | |||||||||
Sweeper Body Autolube System | 5,200 | |||||||||
Subtotal From Additional Sheet(s): | ||||||||||
Subtotal C: | 10700 | |||||||||
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit Price plus Published Options (A+B). | For this transaction the percentage is: | 4% | ||||||||
D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C) | ||||||||||
Quantity Ordered: | 1 | X Subtotal of A + B + C: | 302700 | = | Subtotal D: | 302700 | ||||
E. Other Charges, Trade-Ins, Allowances, Discounts, Etc. | ||||||||||
Description | Cost | Description | Cost | |||||||
PDI | 1,500 | Johnston 650 Trade In | -30,000 | |||||||
Freight | 3,500 | |||||||||
Subtotal E: | -25000 | |||||||||
Delivery Date: | 90-120 Days ARO | F. Total Purchase Price (D+E): | 277700 | |||||||