CITY COMMISSION AGENDA ITEM |
Department: |
Municipal Services & Operations |
Commission Meeting Date: February 5, 2019 |
|
Staff Contact: |
Nick Hoyt, Project Engineer |
||
Recommendations/Options/Action Requested: |
|||
Authorize the City Manager to execute an Engineering Services Agreement, in the amount of $246,547 with George Butler Associates, Inc. (GBA), for the City of Lawrence 2019 Flow Monitoring Program which is part of the Rapid I/I Reduction Program (UT9909CIP). |
|||
Executive Summary: |
The 2019 project includes the ongoing effort to determine the effectiveness of the Rapid I/I Reduction Program. In addition, monitoring sites have been added throughout the City to perform sewer system capacity assessment for specific areas with growth potential, calibrate/verify the sanitary sewer model, and provide year-round data in real time decision support system (RT-DSS) in order to optimize flow distribution through the current wastewater collection system.
Utilities staff has negotiated an appropriate scope and fee for the project. The scope includes: 1) Flow monitoring equipment rental, maintenance, and data analysis for 29 sanitary sewer flow monitors; 2) Maintenance for five (5) rainfall monitoring sites. The number and purpose of the sites is the following:
KDHE Bypass Reporting at PS16 – 1 Permanent Site I/I Reduction Tracking – 11 Temporary Sites Model Calibration/System Capacity Assessment – 10 Temporary Sites RT-DSS (Associated with UT1605) – 7 Permanent Sites Rainfall Monitoring – 5 Permanent Sites H2S Monitoring – 2 Temporary Sites |
||
Strategic Plan Critical Success Factor |
Innovative Infrastructure and Asset Management Core Services Collaborative Solutions Economic Growth and Security |
||
Fiscal Impact (Amount/Source): |
The fiscal impact is $246,547. Funding for this project is included in the 2019 Capital Improvement Plan (CIP), Project #UT9909 ($2.94 million). $96,547.00 is funded with bonded wastewater funds and $150,000 is funded from non-bonded wastewater funds. |
||
Attachments: |
|||
Previous Agenda Report: |
March 25, 2014, Consent Agenda #5
Authorize the City Manager to execute an Engineering Services Agreement, in the amount of $179,595 with George Butler Associates, Inc., for Project UT1402 City of Lawrence Flow Monitoring Program. Staff Memo & Attachments |
(for CMO use only) |
☐TM ☐DS ☐CT ☒BM |