COMPLETED PROJECTS
Location & Description |
Year |
Linear Feet Installed |
Cost |
|
|
|
|
2009 |
|
|
|
Clinton Parkway Recreation Path (ARRA) |
2009 |
11,970 |
$868,184 |
|
|
|
|
2010 |
|
|
|
Burroughs Creek Trail (TE Project) |
2010 |
8,514 |
$591,633 |
Kasold Street Bob Billings to 23rd Multiuse Path |
2010 |
5,163 |
$126,457
|
|
|
|
|
2011 |
|
|
|
Kasold Street 23rd to 31st Sidewalk/ Multiuse Path |
2011 |
5,030 |
$139,279 |
19 ADA Ramps |
|
662 |
|
2011 Sidewalk Gap Program (PW1113) |
|
1,705 |
$65,642.50 ($141,378.50 Total Project) |
|
|
|
|
2012 |
|
|
|
Oread Neighborhood lighted pathway - Begins at 12th Street and Louisiana and slopes eastward to South Park, then to downtown Lawrence. The entire pathway is lighted with period lighting and is ADA-compliant. |
2012 |
447 |
The project was paid for using KU Student Safety funds and Community Development Block Grant funds of $148,309 from the City of Lawrence. |
Delaware Street 8th to 9th |
2012 |
1,129 |
$43,237 |
6th and Iowa Street Sidewalk |
2012 |
2,344 |
$141,378 |
6th- Monterey Iowa Multiuse |
2012 |
530 |
$47,088 |
31 ADA Ramps |
|
1,575 |
|
Senior Center Sidewalk Repairs (CDBG) (in-house) (PW1307) |
|
|
|
10th & Connecticut Hybrid Beacon (CDBG) (PW1308) |
|
|
$40,000 |
|
|
|
|
2013 |
|
|
|
VenturePark Recreation Path, Sidewalks, and Bike Lane |
2013 |
10,760 |
$198,723 |
Bob Billings Multi-use path on south side from Iowa to Kasold |
2013 |
5,180 |
$83,853 |
6th Street Multi-use path from Folks to Monterrey |
|
2,330 |
$120,470 |
Iowa at 6th Street (south side) |
2013 |
1,245 |
$50,000 estimate |
Pennsylvania 8th to 9th Street |
2013 |
655 |
$6,247 |
31st Street Haskell to OConnell as part of SLT construction |
2014 |
5,272 |
$200,000 estimate |
33 ADA Ramps |
|
1,765 |
|
2013 14th & Tennessee Sidewalk Improvements (CDBG) (PW1133) 2 ADA Ramps |
|
|
$14,935.51 |
|
|
|
|
2014 |
|
|
|
2014 CDBG Sidewalk Gap Program (PW1412) |
|
|
$125,000 |
Wakarusa, Inverness to BBP Bike Lanes, Sidewalks, Round-a-bout (PW1341) (Nick) |
|
4,600 |
|
BBP, Wakarusa to Legends Bike Lanes (PW1345) (Zach) |
|
4,056 |
|
9th Street, Emery to Mississippi Bike Lanes (Zach) |
|
2,300 |
|
Princeton Blvd. Bike Lanes (Steve L.) |
|
6,500 |
|
Rock Chalk Park 5K Trail, Extension of Sidewalk & Multiuse Path on GWW & Rock Chalk Dr. |
|
|
$400,000 |