COMPLETED PROJECTS

Location  & Description

Year

Linear Feet Installed

Cost

 

 

 

 

2009

 

 

 

Clinton Parkway Recreation Path (ARRA)

2009

11,970

$868,184

 

 

 

 

2010

 

 

 

Burroughs Creek Trail (TE Project)

2010

8,514

$591,633

Kasold Street – Bob Billings to 23rd

Multiuse Path

2010

5,163

$126,457

 

 

 

 

 

2011

 

 

 

Kasold Street – 23rd to 31st 

Sidewalk/ Multiuse Path

2011

5,030

$139,279

19 ADA Ramps

 

662

 

2011 Sidewalk Gap Program (PW1113)

 

1,705

$65,642.50

($141,378.50 Total Project)

 

 

 

 

2012

 

 

 

Oread Neighborhood lighted pathway - Begins at 12th Street and Louisiana and slopes eastward to South Park, then to downtown Lawrence. The entire pathway is lighted with period lighting and is ADA-compliant.

2012

447

The project was paid for using KU Student Safety funds and Community Development Block Grant funds of $148,309 from the City of Lawrence.

Delaware Street – 8th to 9th

2012

1,129

$43,237

6th and Iowa Street – Sidewalk

2012

2,344

$141,378

6th- Monterey – Iowa – Multiuse

2012

530

$47,088

31 ADA Ramps

 

1,575

 

Senior Center Sidewalk Repairs (CDBG) (in-house) (PW1307)

 

 

 

10th & Connecticut Hybrid Beacon (CDBG) (PW1308)

 

 

$40,000

 

 

 

 

2013

 

 

 

VenturePark Recreation Path, Sidewalks, and Bike Lane

2013

10,760

$198,723

Bob Billings – Multi-use path on south side from Iowa to Kasold

2013

5,180

$83,853

6th Street – Multi-use path from Folks to Monterrey

 

2,330

$120,470

Iowa at 6th Street (south side)

2013

1,245

$50,000 estimate

Pennsylvania – 8th to 9th Street

2013

655

$6,247

31st Street – Haskell to O’Connell as part of SLT construction

2014

5,272

$200,000 estimate

33 ADA Ramps

 

1,765

 

2013 14th & Tennessee Sidewalk Improvements (CDBG) (PW1133) – 2 ADA Ramps

 

 

$14,935.51

 

 

 

 

2014

 

 

 

2014 CDBG Sidewalk Gap Program (PW1412)

 

 

$125,000

Wakarusa, Inverness to BBP – Bike Lanes, Sidewalks, Round-a-bout (PW1341) (Nick)

 

4,600

 

BBP, Wakarusa to Legends – Bike Lanes (PW1345) (Zach)

 

4,056

 

9th Street, Emery to Mississippi – Bike Lanes (Zach)

 

2,300

 

Princeton Blvd. – Bike Lanes (Steve L.)

 

6,500

 

Rock Chalk Park – 5K Trail, Extension of Sidewalk & Multiuse Path on GWW & Rock Chalk Dr.

 

 

$400,000