Pump Station 04 Redundant Force Main – UT1302CS

Figure 1 - Exposed 8" Force Main on River Bank

Figure 2 - Exposed 8" Force Main on River Bank

Pump Station 04 Redundant Force Main – UT1302CS

 

Figures 3 & 4 - Force Main Being Installed by Directional Drilling

Figure 5 - Construction Site at Kansas River WWTP