Memorandum
City of
Utilities Department
TO: |
David L. Corliss –
City Manager Cynthia Wagner - Assistant City Manager |
FROM: |
Melinda Harger – Utilities
Engineer |
CC: |
Dave Wagner –
Director of Utilities Mike Lawless – Deputy
Director of Utilities Philip Ciesielski –
Assistant Director of Utilities Beth Krishtalka – Assistant to Director Dave King –
Utilities Maintenance Superintendent Bob Brower –
Utilities Field Services Superintendent Leah Morris –
Project Engineer |
Date: |
March 5, 2014 |
RE: |
Agenda Item – Set a Bid Date for Bid Number B1419, Project UT1304 Contract 1 Wakarusa Conveyance,
Haskell Avenue Casing Pipe |
Please include the
following item on the City Commission Agenda for consideration at the March 11,
2014 meeting:
Set a bid date of April 1, 2014 for Bid
Number B1419, Project UT1304 Contract 1 Wakarusa Conveyance, Haskell Avenue
Casing Pipe.
Project
Description
The 2012 Wastewater Utilities Master Plan and Capital Improvements Program recommend the construction of the Wakarusa Wastewater Treatment Plant (WWTP) and Conveyance Corridor facilities to be online in 2018. These improvements are required to mitigate wet weather surcharging of sanitary sewers along the 31st Street Corridor, provide for relief of wet weather overloading at the existing WWTP, and provide additional organic treatment capacity to provide for future growth of the community.
The Conveyance Corridor improvements include a pump station facility in the area of 31st and Louisiana and required forcemains and gravity sewers to convey sewerage to and from this point to the Wakarusa WWTP.
Project Status
March 12, 2013 - City Commission authorized staff to advertise a
Request for Proposals for Engineering Services for the Wakarusa Wastewater
Treatment Plant and Conveyance Corridor Facilities.
June 18, 2013 - City
Commission authorized staff to negotiate an engineering services agreement with
Black & Veatch Corporation.
July 23, 2013 –
City Commission authorized an engineering services agreement with Black &
Veatch for initial design services.
October 22, 2013 – City Commission authorized execution of Supplement
Agreement No. 1 with Black & Veatch for preliminary design for the WWTP and
pump station as well as final design of the force mains, roads adjacent to the
WWTP, and WWTP site fill.
Project Status
Project UT1304 will consist of various separate design and construction contracts.
UT1304 Contract 1 will install casing pipe across Haskell Avenue ahead of the SLT construction in that area and allow the future installation of force mains between Pump Station 10 and the Wakarusa WWTP. (See attached map.)
Project Schedule
KDOT has reviewed the plans for UT1304 Contract 1 and has issued a
permit for the installation of casing pipe across Haskell Avenue. UT1304 Contract 1 is ready to bid.
Advertise for Bid March
11, 2014
Bid Opening April
1, 2014
Award Bid April
8, 2014
Notice to Proceed April
9, 2014
Project Completion May
30, 2014
Force Main Construction Beginning
Late Summer 2014
Project Funding
The
project is included in the Department of Utilities 2013 Rate Plan and Capital
Improvement Program.
Action Request
Set a bid date of April 1, 2014 for Bid
Number B1419, Project UT1304 Contract 1 Wakarusa Conveyance, Haskell Avenue
Casing Pipe.
Thank you for your assistance. Please advise
if you have any questions.