City of Lawrence

Planning & Development Services

 

MEMORANDUM

 

DATE: May 29, 2013

 

TO:     David L. Corliss, City Manager       

 

FROM: Jessica Roberts, Projects Specialist and Tony Hoch, Projects Specialist 

 

On May 28, 2013 the City of Lawrence opened proposals for the following:   

 

Bid #B1328 – 1607 Wedgewood Dr. – Community Development Division

 

 

       B1328

 

Base Bid                                                                               

Alternate #1

Alternate #2

Alternate #3

Schmidt Contracting, Inc.

$16,190.00

$1,400.00

$1,000.00

$3,400.00

T & J Holdings, Inc.

$17,150.00

$1,400.00

$1,200.00

$2,600.00

Paul Davis Restoration

$23,363.52

$894.53

$1,055.86

$2,118.37

Staff Estimate

$20,420.05

$1,500.00

$1,410.00

$4,000.00

 

The exterior work includes a driveway, approach and city sidewalk replacement, a storm door replacement, an entry door replacement, installing an exterior drain clean-out, GFCI protect exterior outlets and misc. gutter repairs.  Interior work includes replacing the furnace and a/c, replacing the water heater, reconfiguring an interior plumbing drain, replacing a window and misc. trim and drywall work. This project also includes the following alternates: Alternate #1 – Overhead Garage Door Replacement, Alternate #2 – Kitchen Counter-top and Sink Replacement and Alternate #3 – Upgrade to a 95% Efficiency Furnace. House was built in 2000 so Lead Safe Work Practices and Clearance will not be required.

 

Bid #B1328 – 2728 Fenwick Rd. – Community Development Division

 

       B1328

 

Base Bid                                                                                

Alternate #1

Alternate #2

Schmidt Contracting, Inc.

$15,800.00

$6,000.00

$8,600.00

T & J Holdings, Inc.

$17,025.00

$5,500.00

$13,350.00

Paul Davis Restoration

$21,507.37

$3,841.92

$13,902.25

Staff Estimate

$19,557.00

$6,500.00

$8,730.00

 

The exterior work includes driveway & approach replacement and weatherproof GFCI’s.  Interior work includes floor coverings in kitchen & bath, furnace & AC replacement, metal dryer vent install, two interior door replacements, minor drywall repair, bath fixture caulking and prep and painting of a bathroom.  Alternate #1 – Siding Repair & Painting. Alternate #2 - Vinyl siding instead of painting.

 

 

 

Recommendation Action:

 

Approve the bid from Schmidt Contracting, Inc. for the Comprehensive Rehabilitation Project located at 1607 Wedgewood Dr. in the amount of $16,190.00 for the Base Bid, $1,400.00 for Alternate #1, $1,000.00 for Alternate #2 and $3,400.00 for Alternate #3. Total contract price of $21,990.00.

 

Approve the bid from Schmidt Contracting, Inc. for the Comprehensive Rehabilitation Project located at 2728 Fenwick Rd. in the amount of $15,800.00 for the Base Bid and $8,600.00 for Alternate #2. Total contract price of $24,400.00.

 

 

cc:      David L. Corliss                                    

          Bobbie Walthall                          

          Jonathan Douglass

          Alan Landis

          Scott McCullough

          Danelle Dresslar