Projects completed in 1996 |
|
|
|
|
Eagle Bend
Golf Course |
Construction of golf
facility |
$3,200,000 |
|
Lawrence
Municipal Pool |
Transformed into the
Lawrence Aquatic Center |
$2,828,308 |
|
YSI |
Restroom / concession
building, parking lot, ball diamonds & utilities |
$1,021,806 |
|
Prairie Park
Development |
Developed the east
side of the park (shelter, playground, restroom, courts) |
$622,347 |
|
Dad Perry
Park Development |
Developed the west
side of the park (shelter, playground, restroom, courts) |
$284,876 |
|
|
Sales Tax Total 1996 |
$7,957,337 |
|
|
Projects completed in
1997 |
|
|
|
|
Clinton Lake
Softball Complex |
Developed new adult
softball facility |
$2,005,698 |
|
East Lawrence
Center |
Added large gym,
meeting room and lobby |
$1,838,720 |
|
Centennial
Park Rec Center |
Plans to build
recreation center (facility was not constructed) |
$772,925 |
|
|
Welcome to
Lawrence Signs |
Install new signs at
entrances to City (2) |
$27,000 |
|
|
Sales Tax Total 1997 |
$4,644,343 |
|
|
Projects completed in
1998 |
|
|
|
|
Holcom Sports
Complex |
Restroom / concession
building , new entrance, sidewalks |
$546,884 |
|
SLT Bike
Trail |
New Bike trail
(matching fund for grant) |
$208,346 |
|
All Parks |
Playground upgrades
(ADA & Playground Safety) |
$148,620 |
|
Centennial
Park |
Develop Skate Park
facility |
$145,531 |
|
|
Naismith
Valley Park |
New bike trail |
$101,391 |
|
Lyons Park |
Resurface tennis
& basketball courts & south parking lot |
$86,895 |
|
Haskell
Indian Nations University |
Resurface tennis
& basketball courts |
$38,724 |
|
Veterans Park |
Resurface tennis
& basketball courts |
$32,899 |
|
Clinton Lake
Softball Complex |
Wiring of scoreboards |
$5,500 |
|
|
Sales Tax Total 1998 |
$1,314,790 |
|
|
Projects completed in
1999 |
|
|
|
|
Prairie Park
Nature Center |
Opened in September of 1999 |
$954,993 |
|
|
Clinton Lake
City Park- Ponds |
Build new shop, parking lot and
trail |
$417,717 |
|
|
Centennial
Park |
Restroom &
Shelter replacement SE side of park |
$184,180 |
|
|
YSI |
Install new lights on
soccer fields 14 &15 |
$178,302 |
|
|
Hand
Park |
Developed new park |
$50,183 |
|
|
Prairie Park
Nature Center |
Displays and Exhibits |
$45,000 |
|
|
Eagle Bend
Golf Course |
Restroom |
$38,590 |
|
|
Eagle Bend
Golf Course |
Shelter |
$37,854 |
|
|
Community
Building |
Tuck-pointing brick
on building |
$36,000 |
|
|
Lawrence
Aquatic Center |
Paint entire
pool |
$36,000 |
|
|
Parks and
Recreation Dept. |
Update Comprehensive
Master Plan |
$35,240 |
|
|
YSI |
Install new water
service and meter for irrigation |
$23,690 |
|
|
Holcom Sports
Complex |
Replace bleachers -
Ice fields |
$16,239 |
|
|
East Lawrence
Center |
Install new divider
curtain in Gym |
$9,945 |
|
|
Lawrence
Tennis Center |
Installed new
lights |
$9,600 |
|
|
Eagle Bend
Golf Course |
Chemical Building |
$9,500 |
|
|
Centennial
Park |
Installed lights on
Skate Park |
$9,300 |
|
|
Broken Arrow
Park |
Parking lot patch
holes in roadway and parking lot |
$9,085 |
|
|
Green Meadows
Sub Division |
Park Master Plan |
$7,500 |
|
|
Hallmark Park |
Park Master Plan |
$7,500 |
|
|
Carl Knox
Natatorium |
Replace ADA ramp in
to pool |
$4,245 |
|
|
East Lawrence
Center |
Evaluate electrical
supply problem to building |
$1,925 |
|
|
|
Sales Tax Total 1999 |
$2,122,588 |
|
|
Projects completed in
2000 |
|
|
|
|
Kasold Bike /
Ped Path |
Clinton Parkway to
SLT trail on Kasold |
$660,000 |
|
|
Lyons Park |
Replace ball diamond lights &
install new service for entire park |
$242,499 |
|
|
Langston
Hughes School |
Enlarge Gym for
Recreational Use (City - School District agreement) |
$200,000 |
|
|
Lyons Park |
Install Restroom Building for Lyons
Park Project |
$87,498 |
|
|
Prairie Park
Nature Center |
Bird Cages,
landscaping, curtain, displays, trail markers ect. |
$52,000 |
|
|
Centennial Park |
Purchase Restroom Building for
Centennial Phase II |
$37,500 |
|
|
Centennial
Park |
Reconstruction of SE
parking Lot - Centennial Phase II |
$34,997 |
|
|
Green Meadows Park |
Install section of trail to hook
neighborhood to SLT trail |
$27,630 |
|
|
South Park |
Purchase Supersecure
restroom kit for wading pool restroom |
$26,700 |
|
|
Centennial Park |
Engineering fees for phase II of park
development |
$20,016 |
|
|
Centennial
Park |
Park lighting &
building lights |
$8,789 |
|
|
Community
Building |
Install ceramic tile
over epoxy floor-Men's locker room |
$7,974 |
|
|
Holcom Park Center |
Install ceramic tile over epoxy
floor-Men's locker room |
$7,584 |
|
|
East Lawrence
Center |
Upgrade on AC units
to correct compressor burn out problem |
$7,113 |
|
|
Burcham |
Patch road and parking, then overlay
with asphalt |
$6,910 |
|
|
Holcom Park
Center |
Resurface Kalwall
Windows in Gym |
$6,256 |
|
|
Clinton Lake City Park-
Outlet |
Patch bad spot in road |
$5,660 |
|
|
South Park
Center |
Install ADA door
openers |
$4,600 |
|
|
Centennial Park |
Parking lot lights |
$1,910 |
|
|
YSI |
Chip& seal
entrance road |
$1,257 |
|
|
|
Sales Tax Total 2000 |
$1,446,893 |
|
|
|
Projects completed in
2001 |
|
|
|
|
Indoor
Aquatic Center |
New Facility |
$9,068,906 |
|
|
Centennial
Park - Phase III |
Gazebo, restroom,
parking lot, sidewalks on west side of park |
$356,560 |
|
|
South Park |
Wading Pool &
Restroom |
$231,147 |
|
|
Prairie Park Trail |
Build Trails -(additional $156,000
came from KDWP grant money) |
$146,577 |
|
|
South Park |
Rehab Roosevelt
Fountain |
$71,319 |
|
|
YSI |
Replace electrical
control boxes on Ball diamonds |
$28,629 |
|
|
Holcom Center
& Community Bldg |
Install new tile
floor in women's locker room & tile all showers both buildings |
$22,000 |
|
|
Holcom Park
Sports Complex |
Replace backstop & side fences on
- Ice Field |
$20,885 |
|
|
McGrew Nature
Trail |
Engineering fee to
design trail and repair drainage problems |
$20,300 |
|
|
Green Meadows
Park - Phase I |
Engineering for phase
I |
$17,000 |
|
|
Forestry
Shop |
Repair roof and new
furnace |
$14,218 |
|
|
East Lawrence Center |
Replace Transformer |
$14,000 |
|
|
Lawrence
Aquatic Center |
Resurface Pool Slide
- Light Blue One |
$11,395 |
|
|
Holcom Sports
Complex |
Upgrade irrigation
pump system |
$11,014 |
|
|
South Park |
Repair brick on beds
around fountain |
$10,839 |
|
|
Outlet Park |
Patch Pot Holes in
road |
$6,500 |
|
|
Holcom Park |
New security lighting
for parking lot east of center (lights) |
$6,250 |
|
|
Forestry Shop |
Forestry Shop Upgrades |
$5,950 |
|
|
Prairie Park
Trail |
Install trees along
east property line & rip rap west pond |
$3,000 |
|
|
Lawrence
Aquatic Center |
Replace island in
drop off area |
$2,370 |
|
|
|
|
|
|
Landscape
Maint Shop |
Replace roof |
$2,000 |
|
|
|
|
|
|
Community Building |
Install janitors closet & sink on
main floor |
$1,916 |
|
|
Clinton Park |
Replace roof on
picnic shelter |
$1,500 |
|
|
Centennial
Park |
Landscape,
irrigation, reseeding turf, finish up |
$1,500 |
|
|
|
Sales Tax Total 2001 |
$10,075,775 |
|
|
|
Projects completed in
2002 |
|
|
|
|
McGrew Nature
Trail |
Replace bridges and
install new concrete trail |
$162,500 |
|
|
Hobbs Park |
Upgrade wiring on Ball diamond lights
- Trenching & Labor |
$22,000 |
|
|
Broken Arrow
Park |
Upgrade wiring Ball
diamond lights & shelter Trenching & Labor |
$18,000 |
|
|
Pat Dawson
Billings Nature Area |
Move road to property
due to construction of 27th & Crossgate |
$14,650 |
|
|
Broken Arrow
Park |
Upgrade playground
and shelters on County side of park |
$14,164 |
|
|
Holcom Park
Sports Complex |
Replace backstop
& side fences on - Gold Field |
$14,157 |
|
|
Indoor Aquatic Center |
Repair play feature problem |
$13,077 |
|
|
Indoor Aquatic Center |
Plumbing to add new sink in meeting
room |
$11,316 |
|
|
Lawrence High ball diamond |
Upgrade wiring on Ball diamond lights |
$9,950 |
|
|
Community
Building |
Upgrade elevator |
$9,879 |
|
|
Downtown |
Replace rail road tie retaining wall
with block wall - Watson Park ( N. of Pool) |
$7,595 |
|
|
SLT trail |
Replace & raise 100 ft section of
concrete that has water running over it |
$7,500 |
|
|
Prairie Park Nature Center |
Eagle Pen addition |
$6,184 |
|
|
Indoor Aquatic Center |
Replace stall enclosures in restrooms |
$5,955 |
|
|
South Park |
Install new ADA sidewalk around
playground |
$4,769 |
|
|
Edgewood Park |
Upgrade south end of park -
sidewalks, b-ball court, drinking fountain |
$3,950 |
|
|
Downtown |
Replace rail road tie retaining wall
with block wall - Constant park |
$3,825 |
|
|
Downtown |
Replace rail road tie retaining wall
with block wall - 6th & New Hampshire |
$3,235 |
|
|
Community Building |
Repair roof on overhang on the front
of the building |
$3,175 |
|
|
Community Building |
Repair overhang on the front of the
building |
$3,040 |
|
|
Watson Park |
Resurface basketball court |
$2,800 |
|
|
Indoor Aquatic Center |
Install a fence around AC units to
prevent damage to feed lines |
$942 |
|
|
|
Sales Tax Total 2002 |
$342,663 |
|
|
Projects completed in
2003 |
|
|
|
|
Holcom Park |
Replace Park
Restroom |
$84,835 |
|
|
Outdoor Pool |
Repaint Outdoor Pool |
$45,778 |
|
|
Holcom Park
Center |
Replace Fence &
Concrete around Outdoor AC units |
$36,000 |
|
|
Clinton Lake
City Park |
Master Plan as a
Regional Park |
$25,500 |
|
|
Clinton
Parkway |
Replace sections of
trail along Parkway ( West of Crossgate-south side) |
$25,000 |
|
|
BNSF railroad
track acquisition |
Pay for appraisal and
closing cost to acquire abandoned railroad property |
$15,000 |
|
|
Indoor
Aquatic Center |
Replace remaining
doors in pool area - rusting |
$14,672 |
|
|
East Lawrence
Center |
Replace floor in game
room and entrance that is peeling up |
$14,664 |
|
|
Holcom Park
Sports Complex |
Replace backstop
& side fences on - Blue Field |
$14,557 |
|
|
Holcom Park
Sports Complex |
Replace backstop & side fences on - Red Field |
$14,557 |
|
|
Outlet Park |
Patch bad spots in road |
$14,525 |
|
|
Indoor
Aquatic Center |
Replace doors that
are rusting in leisure pool |
$13,938 |
|
|
Indoor Aquatic Center |
Convert Leisure Pool
To UV sanitizer system |
$12,000 |
|
|
Indoor
Aquatic Center |
Apply concrete sealer
to floors |
$8,335 |
|
|
Indoor
Aquatic Center |
Repair Pool
Heater-replace damaged parts inside heater |
$7,174 |
|
|
Community
Building |
Replace HVAC unit |
$6,836 |
|
|
Indoor
Aquatic Center |
Sign for front drive |
$6,453 |
|
|
Outdoor Pool |
Replace play feature
pumps in west pit |
$6,063 |
|
|
Indoor Pool |
Replace bad
compressors on HVAC unit |
$5,983 |
|
|
Broken Arrow
Park |
Upgrade park restroom
partition & fixture |
$4,800 |
|
|
Outdoor Pool |
Repair main
recirculation pump |
$3,664 |
|
|
Indoor
Aquatic Center |
Repair light fixtures
that are overheating |
$3,631 |
|
|
Indoor
Aquatic Center |
Electrical upgrades
associated with pool heater, lights, pumps |
$3,450 |
|
|
Lawrence Art
Center |
Landscape / sidewalk
improvement |
$3,000 |
|
|
|
Sales Tax Total 2003 |
$390,415 |
|
|
Projects completed in
2004 |
|
|
|
|
Holcom Park |
Repair bad spots and
2"overlay on west half of lot |
$50,475 |
|
|
South Park
Center |
Replace HVAC system /
ducts / vents |
$39,797 |
|
|
Arboretum
/ Outlet Park |
Repair bad spot in
parking lot & roads (approved at $25,000) |
$25,000 |
|
|
Depot |
Carpentry for gutter
replacement |
$18,000 |
|
|
East Lawrence
Center |
Replace floor in game
room and entrance that is peeling up |
$14,664 |
|
|
Misc Park
& Cemetery Roads |
Continue annual chip
& seal maintenance program on the park roads |
$11,300 |
|
|
East Lawrence
Center |
Replace floor machine
(used for daily cleaning of facility floors) |
$9,900 |
|
|
Downtown |
Replace 4 more
drinking fountains |
$6,920 |
|
|
Indoor
Aquatic Center |
Replace light bulbs
& ballasts |
$6,000 |
|
|
Downtown |
Install additional
water hydrants with water line replacement |
$6,000 |
|
|
Holcom Park |
Sidewalks to new
restroom |
$5,793 |
|
|
Community
Building |
Replace Treadmill in
weight room |
$5,195 |
|
|
Community
Building |
Upgrade kitchen area |
$4,950 |
|
|
Broken Arrow Park |
Install sidewalk from parking to
horse shoe court |
$4,835 |
|
|
Dog Park |
Run city water from YSI to Dog Park
area |
$4,520 |
|
|
Veterans Park |
Replace fence around
basketball court |
$4,390 |
|
|
Outdoor Pool |
Replace fence around
slide |
$4,249 |
|
|
Eagle Bend
Golf Course |
New PA system from
Pro Shop to Driving Range |
$3,865 |
|
|
Outdoor
Aquatic Center |
Begin replacing
lounge chairs used on the pool deck |
$3,435 |
|
|
Forestry Shop |
Purchase rock to fill
soft areas in lot |
$3,000 |
|
|
East Lawrence
Center |
Replace lockers in
locker room |
$2,873 |
|
|
Billings
Nature Area |
Overseed entire
property to better establish native grass |
$2,582 |
|
|
Admin Office |
New computer &
printer for GIS work station |
$2,500 |
|
|
CLSC |
Replace roll-up door
that was vandalized |
$2,300 |
|
|
South Park |
Complete planting of
beds and seeding of turf areas on east side of park |
$2,000 |
|
|
Outdoor Pool |
Install new brace
under first section of enclosed slide |
$1,500 |
|
|
Eagle Bend
Golf Course |
Install fans and
lights in shelter |
$1,500 |
|
|
Prairie Park |
Purchase benches for
along trail near Mary's lake |
$1,250 |
|
|
Downtown |
Purchase flowers for
spring (this was cut out of 2004 downtown budget) |
$1,150 |
|
|
SLT Bike
Trail |
Install granite mile
markers on trail |
$1,122 |
|
|
All Parks |
Purchase additional
picnic table frames and park grills |
$980 |
|
|
Holcom Park
Center |
Repair roof, caps
& gutters |
$950 |
|
|
South Park
Center |
Repair roof , caps
& gutters |
$950 |
|
|
Holcom Park
Center |
Replace furniture in
lobby |
$950 |
|
|
Community
Building |
Replace refrigerator
in community room kitchen |
$650 |
|
|
Community
Building |
Repair roof
seals |
$650 |
|
|
Community
Building |
Purchase additional
weights for leg press machine |
$600 |
|
|
Clinton
Parkway |
Overseed all native
grass areas with wildflowers & native grass seed |
$320 |
|
|
|
|
|
Sales Tax Total 2004 |
$257,115 |
|
|
Projects completed in
2005 |
|
|
|
Outdoor Pool |
Replace open flume
slide bed with plunge slide near diving boards |
$43,858 |
|
|
|
|
Indoor Pool |
Replace heat
exchangers in HVAC units |
$19,000 |
|
|
|
|
Community
Building |
Replace heat
exchangers in HVAC units |
$17,500 |
|
|
|
|
Indoor Pool |
Replace up-lights in
1/2 of lap pool (Light fixtures) |
$14,950 |
|
|
|
|
Holcom Park
Center |
Construct new
entrance drive & sidewalk to main entrance |
$14,000 |
|
|
|
|
Indoor Pool |
Replace up-lights in
1/2 of lap pool (Installation) |
$13,500 |
|
|
|
|
Clinton Lake
Softball Complex |
Upgrade Infield
material (fields #1, #2, #3 & #4 ) |
$12,400 |
|
|
|
|
Dad Perry
Park (North) |
Overlay north parking
lot |
$12,040 |
|
|
|
|
CB & ELC |
Replace treadmills
and other weight equipment |
$11,000 |
|
|
|
|
Outdoor Pool |
Electric for new
slide |
$9,935 |
|
|
|
|
Memorial Park
Cemetery |
Replace furnace and
AC in building |
$7,565 |
|
|
|
|
East Lawrence
Center |
Replace skylights in
Gym |
$6,786 |
|
|
|
|
East Lawrence
Center |
Upgrade lights in
North Gym |
$6,000 |
|
|
|
|
Clinton Lake
Softball Complex |
Laser level infield
material (fields #1, #2, #3 & #4 ) |
$6,000 |
|
|
|
|
Murphy
Brombelsick House |
Electric work already
completed |
$5,600 |
|
|
|
|
Community
Building |
Replace HVAC
unit (Emergency Purchase) |
$5,000 |
|
|
|
|
Holcom Park
Center |
Demolishion of old
entrance drive & sidewalk to main entrance |
$4,980 |
|
|
|
|
East Lawrence
Center |
Refurbish sky lights
in locker rooms |
$4,929 |
|
|
|
|
Holcom Park
Center |
Install lights along new entrance |
$4,615 |
|
|
|
|
Community Building |
Waterproof SE corner of building to
prevent basement leaks |
$4,500 |
|
|
|
|
Nature Center |
Air quality control
system for HVAC |
$4,228 |
|
|
|
|
Community
Building |
Repair leaks in roof |
$3,950 |
|
|
|
|
Landscape
Shop |
Replace AC / Furnace |
$3,600 |
|
|
|
|
South Park |
Update electric panel
on north end of park |
$3,200 |
|
|
|
|
Outdoor Pool |
Basketball goal |
$2,807 |
|
|
|
|
Memorial Park
Cemetery |
Replace overhead doors on shop |
$2,750 |
|
|
|
|
Eagle Bend Golf Course |
Grading to correct drainage problem
in #1 fairway |
$2,750 |
|
|
|
|
Outdoor Pool |
Concrete under new
slide |
$2,670 |
|
|
|
|
Holcom Sports
Complex |
Replace roof on
concessions |
$2,050 |
|
|
|
|
Holcom Park
Center |
Repair leaks in
gutter |
$2,000 |
|
|
|
|
Nature Center |
Install switching and
plugs for emergency generator |
$1,750 |
|
|
|
|
Indoor
Aquatic Center |
Repair up-light in
Leisure pool |
$1,571 |
|
|
|
|
Holcom Park
Center |
Repair roof leak
under sky lights |
$1,500 |
|
|
|
|
Murphy
Brombelsick House |
Electric switching
for interior |
$1,090 |
|
|
|
|
Outdoor Pool |
Install basketball
goal in pool |
$475 |
|
|
|
|
|
Sales Tax Total 2005 |
$260,549 |
|
|
|
|
|
Projects completed in
2006 |
|
|
|
Indoor
Aquatic Center |
Paint Pools |
$59,895 |
|
|
|
|
Community
Building |
Roof
repair/replacement over gym |
$40,940 |
|
|
|
|
Community
Building |
Elevator - replace
obsolete controls and car |
$38,944 |
|
|
|
|
Outdoor Pool |
Replace roof on
building |
$26,860 |
|
|
|
|
PLAY proposal |
Feasibility Study for
Athletic facilities (Total $63,000,
City portion $25,000) |
$25,000 |
|
|
|
|
Holcom Park
Center |
Basketball Goal
replacement |
$22,590 |
|
|
|
|
Nature Center |
New storage
building |
$20,800 |
|
|
|
|
Indoor
Aquatic Center |
Install new up lights
in leisure pool |
$14,875 |
|
|
|
|
Holcom Park
Center |
Roof repair - all
lower roofs |
$14,761 |
|
|
|
|
Downtown |
Holiday Lights |
$14,331 |
|
|
|
|
Indoor
Aquatic Center |
Up-lights
Fixtures in leisure pool |
$14,304 |
|
|
|
|
Eagle Bend
Golf Course |
Cart path additions
& replacement |
$13,920 |
|
|
|
|
Community
Building |
Glass wall to convert
racquetball court to cardio room |
$13,780 |
|
|
|
|
Holcom Park
Center |
Resurafce Kallwall
sky light in gym |
$13,586 |
|
|
|
|
Eagle Bend
Golf Course |
Replace roof on
Pro-shop & Cart Barn |
$10,910 |
|
|
|
Hobbs &
Veterans |
Resurface Courts |
$9,854 |
|
|
|
Holcom Park
Center |
Remove vent panels in
gym and replace with glass block |
$9,760 |
|
|
|
Clinton Park |
Site plan, storm
water drainage study, HRC review (prep for 2006 project) |
$9,500 |
|
|
|
Tennis Center |
Repair cracks on
courts |
$9,470 |
|
|
|
Community
Building |
Tuck-point brick
walls |
$9,000 |
|
|
|
Indoor
Aquatic Center |
Replace compressors
on HVAC unit Leisure Pool |
$8,815 |
|
|
|
University
Place Neighborhood |
Repair sidewalk
damaged by street trees |
$8,550 |
|
|
|
Indoor
Aquatic Center |
Repair Whale Wall |
$8,000 |
|
|
|
YSI Baseball |
Irrigation diamonds
#1 & #2 |
$7,200 |
|
|
|
Indoor
Aquatic Center |
HVAC repair on
Leisure Pool |
$6,548 |
|
|
|
Community
Building |
Electrician -convert
racquetball court to cardio room |
$5,850 |
|
|
|
Eagle Bend
Golf Course |
Grading to correct
drainage problem in #15 fairway |
$4,600 |
|
|
|
South Park |
Design of new steps
for band stand |
$4,250 |
|
|
|
Clinton Lake
Softball Complex |
Mudjack concrete
around concession building - to level bad spots |
$2,400 |
|
|
|
Community
Building |
Light Fixtures
-convert racquetball court to cardio room |
$2,213 |
|
|
|
Memorial Park
Cemetery |
Replace windows in
office |
$2,200 |
|
|
|
Holcom Sports
Complex |
Upgrade sand
volleyball courts and poles |
$1,200 |
|
|
|
Downtown |
Sidewalk repair at
6th & New Hampshire |
$1,090 |
|
|
|
YSI &
CLSC |
Replace mirrors in
and stall locks in restrooms |
$900 |
|
|
|
|
|
Sales Tax Total 2006 |
$456,896 |
|
|
Projects completed in
2007 |
|
|
|
Clinton Park |
Replace shelter
& restroom - (Resolution $250,000 - bonded at $239,942) |
$239,942 |
Bonded |
|
|
DeVictor
Park |
Phase I
development ( Resolution for
$200,000)(Bonded at $170,000??) |
$168,414 |
Bonded |
|
|
Sesquicentennial
Point |
Road to Plaza -
Spring 2007 (Resolution for $100,000) |
$100,862 |
Bonded |
|
|
Burroughs
Creek Trail |
Design &
Engineering (Resolution for $300,000) |
$50,000 |
Bonded |
|
|
Outdoor
Aquatic Center |
Paint Pool |
$69,865 |
|
|
|
Community
Building |
New equipment for
cardio room |
$24,495 |
|
|
|
Downtown |
Custom designed tree
grates (odd size) |
$14,999 |
|
|
|
Holcom Park
Center |
Roof repair -
gym |
$14,995 |
|
|
|
South Park |
Build new steps for
band stand |
$14,944 |
|
|
|
South Park
Center |
Replace roof on
center (leaking) |
$14,900 |
|
|
|
Downtown |
Holiday Lights |
$14,331 |
|
|
|
Indoor
Aquatic Center |
Seal interior of roof
edge |
$13,530 |
|
|
|
Outlet Park |
Replace east park
restroom |
$13,485 |
|
|
|
Prairie
Park |
Fence along west
property line - 4ft |
$13,247 |
|
|
|
Outlet Park |
Repair Road ( Public Works) |
$12,889 |
|
|
|
Prairie Park
Nature Center |
Replace lights over
main display area |
$12,701 |
|
|
|
Community
Building |
Replace sliding wall
partitions in basement |
$10,884 |
|
|
|
27th Street |
Repair Road near YSI
entrance ( Public Works) |
$10,656 |
|
|
|
Downtown |
Concrete repairs
needed as a result of tree grate electric repairs |
$8,680 |
|
|
|
Indoor
Aquatic Center |
Replace broken glass
section of Whale Wall |
$8,200 |
|
|
|
Downtown |
GFI cords for hoiday
lights |
$7,000 |
|
|
|
Holcom Park
Center |
Replace scoreboards
in Gym |
$6,970 |
|
|
|
EagleBend
Golf Course |
Repair sewer pumps at
maintenance shop |
$6,109 |
|
|
|
Downtown |
Electrical repair
needed as a result of tree grate installation |
$6,039 |
|
|
|
Prairie Park
Nature Center |
Install light in main
display areas |
$5,500 |
|
|
|
East Lawrence
Center |
Upgrade security
camera & recording devices |
$5,475 |
|
|
|
Clinton Lake
Softball Complex |
Warning tracks - ag
lime for resurfacing |
$4,688 |
|
|
|
Holcom Park
Center |
Replace toilet
partitions in womens restroom |
$4,400 |
|
|
|
South Park |
Installation of new
electrical service to center |
$4,182 |
|
|
|
Clinton Lake
Softball Complex |
Warning tracks -
regrade (laser leveling) |
$3,200 |
|
|
|
Community
Building |
New doors to shower
area of locker room |
$2,530 |
|
|
|
East Lawrence
Center |
Engineering work to
replace HVAC unit |
$2,500 |
|
|
|
Community
Building |
Replace toilet
partitions in lockerroom |
$2,350 |
|
|
|
|
|
$892,962 |
|
|
Projects completed in
2008 |
|
|
|
East Lawrence
Center |
Replace HVAC unit on
Gym & upgrade electric |
$117,515 |
|
Hobbs Park |
Replace Park Restroom |
$45,105 |
|
City |
Additional mowing of
parks & right-of-way - Per City Mgr |
$20,533 |
|
Holcom Park
Center |
Seal & Paint
exterior block walls on building |
$16,500 |
|
CLSC |
Patch asphalt and
apply sealer to parking lot |
$14,740 |
|
Downtown |
Purchase next set of
tree grates |
$14,241 |
|
Downtown |
Purchase 12 tree grates for downtown |
$14,138 |
|
DeVictor Park |
Install additional concrete trail at
north end of park |
$13,988 |
|
City |
Additional mowing of
parks &right-of-way - Per City Mgr |
$11,730 |
|
City |
Additional mowing of
parks & right-of-way - Per City Mgr |
$11,560 |
|
|
Hand Park |
Install rubber play
surface under playgrounds |
$11,460 |
|
Indoor
Aquatic Center |
Replace worn
floatable aquatic play features |
$11,077 |
|
Community
Building |
Apply sealer to west
& east roofs on the building |
$10,825 |
|
Hobbs Park |
Move electrical for
new park restroom |
$10,500 |
|
Clinton
Parkway |
Phase 1 replacement
of asphalt bike trail - South Side |
$9,999 |
|
Holcom Park |
Seal North Parking
Lot |
$9,300 |
|
Centennial
Skate Park |
Patch cracks in
asphalt surface on skate park |
$9,167 |
|
Downtown |
Purchase replacement
holiday lights for downtown |
$9,003 |
|
East Lawrence
Center |
Engineering for -
HVAC unit on Gym & upgrade electric |
$8,868 |
|
Holcom Park
Center |
Install security
cameras in building and parking lot |
$8,297 |
|
Downtown |
Concrete repair for
electrical reroute |
$8,021 |
|
Community
Building |
Install HVAC control
system |
$7,830 |
|
Sesqui Point |
Regrade and seed
ditches |
$7,700 |
|
Downtown |
Electrical Repairs
to allow for tree grate installation |
$7,525 |
|
Downtown |
Installation of next
set of tree grates |
$7,302 |
|
Indoor
Aquatic Center |
Repair pool pumps
during shut down |
$6,500 |
|
Nature Center |
Paint interior of
building |
$6,300 |
|
Oudoor
Aquatic Center |
Softstart for main
pool pump |
$6,000 |
|
Holcom Park
Center |
Replace vent in gym
wall with glass block (fall project) |
$5,976 |
|
Indoor
Aquatic Center |
Prep and paint slide
steps and platform |
$5,645 |
|
City |
Additional mowing of
parks & right-of-way - Per City Mgr |
$5,400 |
|
Hobbs Park |
Move water and sewer
for new restroom |
$5,400 |
|
Tennis Center |
Patch and coat large
cracks on courts |
$5,385 |
|
Indoor
Aquatic Center |
Repairs to HVAC
units |
$5,000 |
|
Hobbs Park |
New electric
transformer for park |
$4,000 |
|
Memorial Park
Cemetery |
Install light on
veterans flag pole |
$3,800 |
|
Indoor
Aquatic Center |
Powerwash walkways
& lockerroom during shut down |
$3,590 |
|
Outdoor
Aquatic Center |
Replace missing and
damaged tile on entrance fountain |
$3,480 |
|
DeVictor Park |
Pour concrete on
both side of sidewalk tube to prevent further erosion |
$3,385 |
|
DeVictor Park |
Curb cuts at Harvard
for trail access |
$3,227 |
|
YSI |
Replace roof on
concessions |
$3,100 |
|
Downtown |
Patch concrete from
tree grate electrical work |
$3,002 |
|
Downtown |
Repair electric
damaged by tree grate installation |
$2,372 |
|
Centennial
Skate Park |
Replace skatelite
surface on ramp |
$2,210 |
|
Outdoor Pool |
Replace caulking
around building and pool |
$2,150 |
|
Indoor
Aquatic Center |
Replace mud valves |
$2,000 |
|
Indoor
Aquatic Center |
Replace steps on
slide platform |
$1,950 |
|
DeVictor Park |
Curb cuts StoneCreek
for trail access |
$1,331 |
|
Memorial Park
Cemetery |
Install electrical
service for flag pole light |
$557 |
|
|
|
$508,684 |
|
|
Projects completed in
2009 |
|
|
|
Hobbs Park |
Replace sewer main to
service park facilities |
$56,027 |
|
Depot |
Roof replacement |
$29,849 |
|
Landscape
Shop |
Replace molded
insulation in shop |
$25,645 |
|
DeVictor Park |
Phase II of trail
development along west side of park |
$19,724 |
|
Youth Sports
Complex |
Irrigation for new
baseball / softball fields 5-8 |
$14,778 |
|
South Park /
Walnut Park |
Install rubberized
play surface under playground |
$14,579 |
|
Arboretum /
27th street |
Asphalt patching on
road and parking lot |
$14,180 |
|
Indoor
Aquatic Center |
Install BigFan's in
Leisure pool |
$13,807 |
|
Youth Sports
Complex |
Grading and leveling
baseball / softball fields 5-8 , prep for seeding |
$12,500 |
|
Indoor
Aquatic Center |
Install BigFan's in
Lap pool |
$12,057 |
|
Depot |
Emergency Boiler
Replacement |
$11,950 |
|
Holcom Park
Center |
Install HVAC control
system |
$10,688 |
|
Downtown |
Concrete work on tree
grates |
$9,978 |
|
Hobbs Park |
Outfield fence
replacement |
$9,516 |
|
Memorial Park
Cemetery |
Install curb to
divert water run-off from roads to 15th street |
$9,333 |
|
Youth Sports
Complex |
Road addition near
soccer field #14 |
$9,301 |
|
Indoor
Aquatic Center |
Replace pipes for
heat exchanger on pool heater |
$9,021 |
|
Downtown |
Install next set of
tree grates - concrete |
$9,021 |
|
Holcom
Complex |
Install foul line
fences on t-ball diamonds |
$8,604 |
|
Youth Sports
Complex |
Ag lime for infields
on baseball & softball field 5-8 |
$8,480 |
|
Holcom Park
Center |
Repaint top half of
gym |
$8,400 |
|
Outdoor
Aquatic Center |
Replace caulking on
deck around pool |
$7,450 |
|
Community
Building |
Replace gym lights
with high efficiency fluorescents |
$7,414 |
|
YSI Complex |
Begin replacing old
bleachers with portable aluminum type |
$7,305 |
|
Community
Building |
Replace main boiler
for building water |
$6,700 |
|
Hobbs Park |
Architect for Site
Plan and HRC approval |
$5,400 |
|
EBGC |
Replace sewer pumps
at maintenance shop |
$5,000 |
|
South Park |
Repair sewer pumps in
park restroom |
$5,000 |
|
Prairie Park
Natrue Center |
Repair sewer main |
$4,770 |
|
Dad Perry,
Holcom |
Painting of Park
Restrooms |
$4,500 |
|
Aquatics |
Retrofit all main
pool drains to comply with new law |
$4,333 |
|
Downtown |
Install next set of
tree grates - electric |
$4,000 |
|
Depot |
Electrical upgrades
for holiday lighting |
$4,000 |
|
DeVictor Park |
Install 100ft of
concrete path to prevent erosion |
$3,640 |
|
Outdoor Pool |
Repair / Replace pump
for enclosed slide |
$3,213 |
|
Indoor
Aquatic Center |
Replace drinking
fountains in leisure pool area |
$2,089 |
|
Outlet Park |
Install new roof on
west shelter |
$1,840 |
|
Hobbs House |
Paint trim on
building |
$1,800 |
|
EBGC |
Drinking fountains on
#5 and #15 |
$1,710 |
|
Aquatics |
Retrofit pool suction
line on drop slide to comply with new law |
$1,625 |
|
|
|
$399,227 |
|
|
Projects completed in
2010 |
|
|
|
DeVictor Park |
Complete concrete
trail at north end of park ($15,000 will be reimbursed) |
$39,499 |
|
DeVictor Park |
($15,000 will be reimbursed for
trail gant) |
-$15,000 |
|
Cemeteries |
Repair and patch
asphalt on roads and parking lots |
$16,000 |
|
Youth Sports
Complex |
Install sewer line to
pump pit for south end of complex for future restroom |
$14,950 |
|
Indoor
Aquatic Center |
Repair road in front
of parking lot entrance |
$14,558 |
|
Youth Sports
Complex |
Repair and patch
asphalt on roads and parking lots |
$14,046 |
|
SLT Trail |
Replace section of
trail that hold water |
$13,538 |
|
Holcom Park |
Repair and patch
asphalt on roads and parking lots |
$13,230 |
|
Youth Sports
Complex |
Install sewer pump
pit at south end of complex |
$12,560 |
|
Youth Sports
Complex |
Loader work for new
road (Working with the Corp ) |
$12,000 |
|
Indoor
Aquatic Center |
Bearing & shaft
replacement in HVAC units |
$12,000 |
|
Downtown |
Purchase next set of
tree grates (8) |
$11,052 |
|
Peterson Road |
Bike Path repairs
east of Kasold |
$10,752 |
|
Burroughs
Creek Park |
Tear down old
building on 15th street |
$9,850 |
|
Dad Perry
Park West |
New roof & fascia
on shelter |
$9,806 |
|
Downtown |
Repair damaged water hydrants |
$9,780 |
|
East Lawrence
Center |
Replace gym lights
with energy efficient lights |
$9,705 |
|
West 27th
Street |
Patch bad spots on
road to Youth Sports Complex and District #1 shop |
$9,095 |
|
All
Facility |
Honeywell energy
management software |
$8,450 |
|
Holcom Park
Center |
Replace floor behind
main desk, air lock & game room |
$8,135 |
|
East Lawrence
Center |
Repair and patch
asphalt in parking lots |
$7,678 |
|
Recreation
Center |
Begin concept design
process for new recreation center |
$7,500 |
|
Holcom Park
Center |
New light fixtures
for gym |
$7,480 |
|
Indoor
Aquatic Center |
Big fan in lobby |
$6,993 |
|
Downtown |
Install next set of
tree grates |
$6,900 |
|
Youth Sports
Complex |
Finish concrete
sidewalks for new diamonds |
$6,896 |
|
Lyons Park |
Patch asphalt parking
lots |
$6,296 |
|
Prairie Park |
Replace roof on park
shelter |
$6,245 |
|
Indoor Aquatic Center |
Seal parking lot and re-stripe |
$6,195 |
|
Indoor
Aquatic Center |
Repair asphalt
parking lot |
$6,026 |
|
Clinton Park |
Repair and patch
asphalt in parking lots 4 inch thick |
$5,346 |
|
Dad Perry
North |
Patch asphalt parking
lots |
$5,263 |
|
East Lawrence
Center |
Replace leaking
skylight in main gym |
$5,031 |
|
Mary's Lake |
Install rip-rap on
dam |
$5,000 |
|
Outdoor
Aquatic Center |
Remove and replace
damaged concrete deck and gutter |
$4,913 |
|
South Park
Wading Pool |
Install sump pump for
wading pool |
$4,880 |
|
Burroughs
Creek Park |
Water Hydrant
installation |
$4,700 |
|
Dad Perry
Park |
Replace roof on north
park shelter |
$4,616 |
|
Burroughs
Creek Trail |
Drinking fountains
for along trail |
$4,180 |
|
East Lawrence
Center |
Replace restroom
doors |
$3,968 |
|
East Lawrence
Center |
Install gym
lights |
$3,754 |
|
Carl Knox
Pool |
Replace pool heater
(cost split with school district) |
$3,487 |
|
HPC, CB, ELC |
Replace hand dryers
in restrooms and locker rooms |
$3,460 |
|
Community
Building |
Upgrade building
security system |
$3,071 |
|
Outdoor
Aquatic Center |
Seal interior and
exterior of pool wall where water is penetrating |
$2,855 |
|
Downtown |
Tree Grates (2) |
$2,854 |
|
CLSC |
Repair lights |
$2,629 |
|
Hobbs Park |
Paint stadium edges
and stairs |
$2,387 |
|
Downtown |
Holiday Lights for
the Carnegie Building & Art Center |
$2,301 |
|
Indoor
Aquatic Center |
Repair Dragon Slide |
$2,296 |
|
Outdoor
Aquatic Center |
Replace pump &
electric motor on drop slide |
$2,231 |
|
Outdoor
Aquatic Center |
Excavation work to
check backfill after pool deck is removed |
$2,142 |
|
Downtown |
Installation of tree
grates (2) |
$1,893 |
|
Indoor
Aquatic Center |
Replace motor on
leisure pool pump |
$1,876 |
|
Indoor
Aquatic Center |
Replace heater
exchanger on unit #2 |
$1,817 |
|
Mary's Lake |
Replace sections of
fishing Dock |
$1,810 |
|
Nature Center |
Replace AC unit |
$1,810 |
|
Downtown |
Install footings for
benches |
$1,765 |
|
Skatepark
Centennial |
Asphalt to patch
cracks |
$1,720 |
|
Outdoor
Aquatic Center |
Remove bad sections
on south pool deck (check backfill ) repour |
$1,292 |
|
Burroughs
Creek Park |
Paint north end of
building |
$1,055 |
|
Skatepark
Centennial |
Engineering service
for skate park surface |
$700 |
|
|
|
$399,317 |
|
|
Projects planned for
2011 |
|
|
|
East Lawrence
Center |
Resurface roof |
$81,595 |
Not yet completed |
|
Youth Sports
Complex |
New restroom building
south of football fields includes utilities to site |
$67,490 |
Not yet completed |
|
Admin Office |
Move Admin Office to
South Park Center |
$67,000 |
Project Being Bid |
|
Holcom Park
Center |
Install new flooring
in lobby and Bly Room |
$35,000 |
Project Being Bid |
|
Youth Sports
Complex |
Install lights on
dimonds 5-8 |
$20,000 |
Project Being Bid |
|
Broken Arrow
Park |
Overlay parking lot |
$15,000 |
Project Being Bid |
|
Downtown |
Tree grates (9) |
$14,095 |
|
Downtown |
Holiday light
replacement / upgrade |
$12,899 |
|
DeVictor Park |
Complete trail
section from Bob Billings to bridge |
$12,320 |
|
South Park
Center / CB |
Install conduit for
new computer fiber line from Law Enforcement Center |
$11,945 |
|
Downtown |
Tree grate Install |
$9,777 |
Not yet completed |
|
Outdoor
Aquatic Center |
Resurface inside of
tube slide |
$8,860 |
|
Indoor
Aquatic Center |
Replace plants in
planters around leisure pool |
$7,175 |
|
Youth Sports
Complex |
Remove light poles
from Sport-2-Sport for future use at diamonds 5-8 |
$6,500 |
|
South Park
Center / CB |
Install new computer
fiber cable in conduit |
$5,875 |
Not yet completed |
|
South Park
Center |
Architectural for the
renovation of South Park Center |
$3,500 |
|
Admin Office |
Remove old walls to
allow for new offices |
$3,256 |
Project Being Bid |
|
Oak Hill
Cemetery |
Remove old holding
vault |
$3,200 |
Project Being Bid |
|
Youth Sports
Complex |
Crain to remove poles
from Sport-2-Sport (future use on diamonds 5-8) |
$3,000 |
|
Indoor
Aquatic Center |
Replace HVAC motor |
$2,800 |
|
Downtown |
Tree grate purchase |
$1,456 |
Not yet completed |
|
Indoor
Aquatic Center |
Replace small plants
in planters around leisure pool |
$593 |
|
|
|
$393,336 |
|
|
Park & Open Space
Acquisition |
|
|
Purchases |
30 acres west of Free State High
School |
$2,820,000 |
|
|
43 acres east of Brook Creek Park |
|
|
|
48 acres west of 31st & Kasold |
|
|
|
40 acres a mile east of Prairie Park |
|
|
|
41 acre Greenbelt park near 15th & George Williams way |
|
|
|
20 acres at north end of Folks Road |
|
|
|
20 acre Dickey Property (west of Folks Road & Peterson Road) |
|
|
|
14 acre Kelly Property (west of
Folks Road & Peterson Road) |
|
|
|
38 acres 1.5 miles west of Lawrence |
|
|
|
4 acre Stonegate Park |
|
|
|
6 acres west of Marys Lake |
|
|
Park Land Donations |
22 acres west of Hallmark (Iowa & Peterson) |
|
|
|
18 acre Kanza Southwind Nature Preserve |
|
|
|
42 acres south of 27th & Crossgate (Pat Dawson Billing Nature
Area) |
|
|
|
15 acres of greenbelt east of Sunflower school. |
|
|
|
40 acres north of Free State High School (Lichtwardt Property) |
|
|
|
Several small parcels adjacent to existing parks |
|
|
|
Total Sales Tax
Projects 1994-2011 |
$34,682,890 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|