CITY OF LAWRENCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City Bid No. B1131 |
|
|
|
Project PW1105 |
|
|
|
2011 Overlay Program
- Phase 2 |
|
|
BID TAB |
|
|
|
June 7, 2011 |
|
|
|
Engineer's Estimate -
$1,382,625.65 |
|
|
|
|
|
|
R. D. Johnson |
Kansas Heavy Const. |
Little Joe's Asphalt, Inc. |
|
|
|
|
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
1 |
Edge Milling
(6' Width at 0"-2" Depth) |
SY |
9,922 |
$
1.10 |
$ 10,914.20 |
$
1.35 |
$
13,394.70 |
$
1.34 |
$
13,295.48 |
|
|
|
|
|
|
|
|
2 |
Taper Milling
(Variable Width/Length at 0"-2" Depth Typ.) |
SY |
1,252 |
$
1.10 |
$
1,377.20 |
$
1.35 |
$
1,690.20 |
$
2.83 |
$
3,543.16 |
|
|
|
|
|
|
|
|
3 |
Milling
(2" Typ.) |
SY |
45,956 |
$
1.05 |
$
48,253.80 |
$
1.20 |
$
55,147.20 |
$
1.15 |
$
52,849.40 |
|
|
|
|
|
|
|
|
4 |
Asphaltic
Concrete Overlay Surface Course (2" Typ.) |
TONS |
8,147 |
$
55.61 |
$
453,054.67 |
$
59.00 |
$
480,673.00 |
$
59.79 |
$
487,109.13 |
|
|
|
|
|
|
|
|
5 |
Asphaltic
Concrete Overlay Leveling Course * |
TONS |
1,878 |
$
60.50 |
$
113,619.00 |
$
65.00 |
$
122,070.00 |
$
67.84 |
$
127,403.52 |
|
|
|
|
|
|
|
|
6 |
Asphalt
Pavement Patch * |
TONS |
517 |
$
75.00 |
$
38,775.00 |
$
85.00 |
$
43,945.00 |
$
213.86 |
$
110,565.62 |
|
|
|
|
|
|
|
|
7 |
Concrete
Pavement Patch (Reinforced)(HE) * |
SY |
1,825 |
$
60.00 |
$
109,500.00 |
$
70.00 |
$
127,750.00 |
$
59.29 |
$
108,204.25 |
|
|
|
|
|
|
|
|
8 |
6"
Concrete Pavement (Reinforced)(HE) |
SY |
545 |
$
59.00 |
$
32,155.00 |
$
58.00 |
$
31,610.00 |
$
62.50 |
$
34,062.50 |
|
|
|
|
|
|
|
|
9 |
8"
Concrete Pavement (Reinforced)(HE) |
SY |
1,200 |
$
67.90 |
$
81,480.00 |
$
72.00 |
$
86,400.00 |
$
67.70 |
$
81,240.00 |
|
|
|
|
|
|
|
|
10 |
10"
Concrete Pavement (Reinforced)(HE) |
SY |
338 |
$
81.00 |
$
27,378.00 |
$
82.00 |
$
27,716.00 |
$
76.16 |
$
25,742.08 |
|
|
|
|
|
|
|
|
11 |
20"
Concrete Curb and Gutter (Kasold Median Curb) |
LF |
801 |
$
17.50 |
$
14,017.50 |
$
22.50 |
$
18,022.50 |
$
21.92 |
$
17,557.92 |
|
|
|
|
|
|
|
|
12 |
24"
Concrete Curb and Gutter (Type CG-1 & CG-3 Typ.) |
LF |
8,720 |
$
17.50 |
$
152,600.00 |
$
22.50 |
$
196,200.00 |
$
19.84 |
$
173,004.80 |
|
|
|
|
|
|
|
|
13 |
30"
Concrete Curb and Gutter (Kasold) |
LF |
1,102 |
$
19.00 |
$
20,938.00 |
$
30.00 |
$
33,060.00 |
$
20.73 |
$
22,844.46 |
|
|
|
|
|
|
|
|
14 |
Concrete
Sidewalk (4") |
SY |
30 |
$
36.50 |
$
1,095.00 |
$
35.00 |
$
1,050.00 |
$
41.80 |
$
1,254.00 |
|
|
|
|
|
|
|
|
15 |
Concrete
Access Ramp |
EACH |
6 |
$ 575.00 |
$
3,450.00 |
$
825.00 |
$
4,950.00 |
$
631.06 |
$
3,786.36 |
|
|
|
|
|
|
|
|
16 |
Remove
4" Existing Median Material & Install 4" Exposed Aggregate
Concrete (Kasold Median) |
SY |
182 |
$
50.00 |
$
9,100.00 |
$
49.00 |
$
8,918.00 |
$
52.01 |
$
9,465.82 |
|
|
|
|
|
|
|
|
17 |
Remove
6" Existing Median Material & Install 6" Topsoil, Seed, Mulch
(Kasold Median) |
SY |
4,823 |
$
15.00 |
$
72,345.00 |
$
6.20 |
$
29,902.60 |
$
16.34 |
$
78,807.82 |
|
|
|
|
|
|
|
|
18 |
Erosion
Control Blanket (Excel SR-1) (Kasold Median) |
SY |
2,541 |
$
2.00 |
$
5,082.00 |
$
2.80 |
$
7,114.80 |
$
2.49 |
$
6,327.09 |
|
|
|
|
|
|
|
|
19 |
Install
6" Rigid Perforated Underdrain Line |
LF |
614 |
$
14.00 |
$
8,596.00 |
$
20.00 |
$
12,280.00 |
$
16.68 |
$
10,241.52 |
|
|
|
|
|
|
|
|
20 |
Install
6'x3' Curb Inlet |
EACH |
2 |
$
2,650.00 |
$
5,300.00 |
$
3,400.00 |
$
6,800.00 |
$
3,612.74 |
$
7,225.48 |
|
|
|
|
|
|
|
|
21 |
Asphalt
Driveway Wedges * |
SY |
330 |
$
7.90 |
$
2,607.00 |
$
9.50 |
$
3,135.00 |
$
41.35 |
$
13,645.50 |
|
|
|
|
|
|
|
|
22 |
Manhole
Adjustment |
EACH |
7 |
$
550.00 |
$
3,850.00 |
$
750.00 |
$
5,250.00 |
$
787.77 |
$
5,514.39 |
|
|
|
|
|
|
|
|
23 |
Valve
Adjustment |
EACH |
9 |
$
550.00 |
$
4,950.00 |
$
230.00 |
$
2,070.00 |
$
661.44 |
$
5,952.96 |
|
|
|
|
|
|
|
|
24 |
Install
Monument Box |
EACH |
1 |
$
800.00 |
$
800.00 |
$
1,000.00 |
$
1,000.00 |
$
1,028.36 |
$
1,028.36 |
|
|
|
|
|
|
|
|
25 |
Install 4"
HDPE Traffic Conduit (Bored South Leg at 19th &Tenn.) |
LF |
85 |
$ 22.00 |
$
1,870.00 |
$
22.00 |
$
1,870.00 |
$
23.35 |
$
1,984.75 |
|
|
|
|
|
26 |
Install
Complete Video Traffic Detection System (19th & Tenn.) |
EACH |
1 |
$ 23,000.00 |
$
23,000.00 |
$ 22,000.00 |
$
22,000.00 |
$
23,084.80 |
$
23,084.80 |
|
|
|
|
|
|
|
|
27 |
Cold Plastic
Reflectorized Pavement Marking |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) 6" Dotted White Extension Line |
LF |
35 |
$
4.00 |
$
140.00 |
$
3.75 |
$
131.25 |
$
4.82 |
$
168.70 |
|
|
|
|
|
|
b) 6" Broken White Lane Line |
LF |
2,203 |
$
4.00 |
$
8,812.00 |
$
3.75 |
$
8,261.25 |
$
4.30 |
$
9,472.90 |
|
|
|
|
|
|
c) 6" Solid White Channelization Line |
LF |
862 |
$
4.00 |
$
3,448.00 |
$
3.75 |
$
3,232.50 |
$
4.22 |
$
3,637.64 |
|
|
|
|
|
|
b) 24" Solid White Stop Line |
LF |
87 |
$
12.25 |
$
1,065.75 |
$
12.00 |
$
1,044.00 |
$
14.76 |
$
1,284.12 |
|
|
|
|
|
|
d) 36" Solid White Crosswalk Line |
LF |
174 |
$
14.50 |
$
2,523.00 |
$
14.00 |
$
2,436.00 |
$
15.87 |
$
2,761.38 |
|
|
|
|
|
|
e) Left Turn Lane Arrow |
EACH |
11 |
$
320.00 |
$
3,520.00 |
$
300.00 |
$
3,300.00 |
$
337.00 |
$
3,707.00 |
|
|
|
|
|
|
f) Right Turn Lane Arrow |
EACH |
4 |
$
320.00 |
$
1,280.00 |
$
300.00 |
$
1,200.00 |
$
363.48 |
$
1,453.92 |
|
|
|
|
|
|
g) Straight Through Arrow |
EACH |
2 |
$
270.00 |
$
540.00 |
$
250.00 |
$
500.00 |
$
321.42 |
$
642.84 |
|
|
|
|
|
|
h) Left Turn & Straight through Arrow |
EACH |
2 |
$
475.00 |
$
950.00 |
$
450.00 |
$
900.00 |
$
589.20 |
$
1,178.40 |
|
|
|
|
|
|
i) 4" Solid Double Yellow Lane Line ** |
LF |
709 |
$
5.25 |
$
3,722.25 |
$
5.00 |
$
3,545.00 |
$
5.60 |
$
3,970.40 |
|
|
|
|
|
|
j) 12" Solid Yellow Diagonal Line |
LF |
30 |
$
8.25 |
$
247.50 |
$
8.00 |
$
240.00 |
$
14.51 |
$
435.30 |
|
|
|
|
|
28 |
Heat Fused
Preformed Thermoplastic Pavement Marking |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) 24" Solid White Stop Line |
LF |
13 |
$
37.00 |
$
481.00 |
$
35.00 |
$
455.00 |
$
49.04 |
$
637.52 |
|
|
|
|
|
|
b) 36" Solid White Crosswalk Line |
LF |
30 |
$
43.00 |
$
1,290.00 |
$
40.00 |
$
1,200.00 |
$
48.80 |
$
1,464.00 |
|
|
|
|
|
29 |
Temporary
Surfacing * |
TONS |
750 |
$
18.75 |
$
14,062.50 |
$
23.50 |
$
17,625.00 |
$
19.97 |
$
14,977.50 |
|
|
|
|
|
30 |
Seeding,
Fertilizing, and Mulching (All impacted areas except Kasold medians) |
LS |
1 |
$ 12,500.00 |
$
12,500.00 |
$
5,250.00 |
$
5,250.00 |
$
1,549.72 |
$
1,549.72 |
|
|
|
|
|
31 |
Material
Testing |
LS |
1 |
$
5,000.00 |
$
5,000.00 |
$
5,000.00 |
$
5,000.00 |
$
5,000.00 |
$
5,000.00 |
|
|
|
|
|
|
|
GRAND TOTAL |
|
$ 1,305,689.37 |
|
$ 1,398,339.00 |
|
$
1,478,082.51 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|