CITY OF LAWRENCE |
|
|
|
|
|
|
|
|
|
|
|
City Bid No. B1126 - Project No. PW1101 |
|
|
|
6th Street (U.S.
40/59 HWY) from Iowa Street to Massachusetts Street |
|
|
Bid Date: June 7, 2011 |
|
|
|
Engineer's Estimate: Base
Bid - $903,775.30; Alternate 1 -$153,458.50; Alternate 2 -$134,486.50 |
|
|
Sunflower Paving, Inc. |
|
|
|
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
Unit Price |
Amount |
|
1 |
Mobilization
(P) |
1 |
L.S. |
$
26,935.00 |
$
26,935.00 |
|
|
|
|
|
|
2 |
Milling
2" Depth (P) |
52,060 |
S.Y. |
$ 0.50 |
$
26,030.00 |
|
|
|
|
|
|
3 |
Milling
2" Depth (NP) |
1,468 |
S.Y. |
$ 0.50 |
$ 734.00 |
|
|
|
|
|
|
4 |
Asphaltic
Concrete (KDOT HMA-Commercial) 2" Overlay (P)* |
6,014 |
TON |
$ 63.39 |
$
381,227.46 |
|
|
|
|
|
|
5 |
Asphaltic
Concrete (KDOT HMA-Commercial) 2" Overlay (NP)* |
171 |
TON |
$ 63.39 |
$
10,839.69 |
|
|
|
|
|
|
6 |
Asphaltic
Concrete (BM-1) Leveling Course (P) |
1,500 |
TON |
$ 65.00 |
$
97,500.00 |
|
|
|
|
|
|
7 |
Portland
Cement Concrete Pavement Patch (Full Depth- 8" Min.) (P)** |
3,000 |
S.Y. |
$ 60.00 |
$
180,000.00 |
|
|
|
|
|
|
8 |
Asphaltic
Concrete (HMA-Commercial) Pavement Patch (Full Depth) (P)** |
100 |
TON |
$ 85.00 |
$ 8,500.00 |
|
|
|
|
|
|
9 |
Temporary
Pavement Marking |
|
|
|
$ - |
|
|
|
|
|
|
|
a) 4" Broken White (Tape) (P) |
1,347 |
L.F. |
$ 1.00 |
$ 1,347.00 |
|
|
|
|
|
|
|
b) 4" Broken Yellow (Tape) (P) |
1,021 |
L.F. |
$ 1.00 |
$ 1,021.00 |
|
|
|
|
|
|
10 |
Permanent
Pavement Marking |
|
|
|
$ - |
|
|
|
|
|
|
|
a) 6" Broken White Lane Line (Class A)
(Cold Plastic) (P) |
2,960 |
L.F. |
$ 2.85 |
$ 8,436.00 |
|
|
|
|
|
|
|
b) 6" Dotted White Lane Line (Class A)
(Cold Plastic) (P) |
234 |
L.F. |
$ 2.85 |
$ 666.90 |
|
|
|
|
|
|
|
c) 6" Dotted White Extension Line (Class
A) (Cold Plastic) (P) |
234 |
L.F. |
$ 2.85 |
$ 666.90 |
|
|
|
|
|
|
|
d) 6" Solid White Channelization Line
(Class A) (Cold Plastic) (P) |
1,571 |
L.F. |
$ 2.85 |
$ 4,477.35 |
|
|
|
|
|
|
|
e) 6" Solid White Edge Line (Class A)
(Cold Plastic) (P) |
2,192 |
L.F. |
$ 2.85 |
$ 6,247.20 |
|
|
|
|
|
|
|
f) 12" Solid White Diagonal Line (Class
A) (Cold Plastic) (P) |
273 |
L.F. |
$ 7.00 |
$ 1,911.00 |
|
|
|
|
|
|
|
g) 12" Solid White Chevron Line (Class
A) (Cold Plastic) (P) |
16 |
L.F. |
$ 7.00 |
$ 112.00 |
|
|
|
|
|
|
|
h) 24" Solid White Stop Line (Class A)
(Cold Plastic) (P) |
565 |
L.F. |
$ 10.00 |
$ 5,650.00 |
|
|
|
|
|
|
|
i) 24" Solid White Stop Line (Class A)
(Applied to Existing
Pavement) (P) |
13 |
L.F. |
$ 10.00 |
$ 130.00 |
|
|
|
|
|
|
|
j) 36" Solid White Crosswalk Line (Class
A) (Cold Plastic) (P) |
666 |
L.F. |
$ 14.00 |
$ 9,324.00 |
|
|
|
|
|
|
|
k) 36" Solid White Crosswalk Line (Class
A) (Applied to Existing
Pavement) (P) |
30 |
L.F. |
$ 14.00 |
$ 420.00 |
|
|
|
|
|
|
|
l) 4" Broken Yellow Lane Line (Class B)
(Cold Plastic) (P) |
2,240 |
L.F. |
$ 2.25 |
$ 5,040.00 |
|
|
|
|
|
|
|
m) 4" Solid Yellow Lane Line (Class B)
(Cold Plastic) (P) |
8,140 |
L.F. |
$ 2.25 |
$
18,315.00 |
|
|
|
|
|
|
|
n) 4" Solid Double Yellow Lane Line
(Class B) (Cold Plastic) (P)*** |
2,011 |
L.F. |
$ 4.00 |
$ 8,044.00 |
|
|
|
|
|
|
|
o) 12" Solid Yellow Diagonal Line (Class
B) (Cold Plastic) (P)*** |
245 |
L.F. |
$ 6.50 |
$ 1,592.50 |
|
|
|
|
|
|
|
p) Left Turn Lane Use Arrow (Cold Plastic) (P) |
53 |
EACH |
$
285.00 |
$
15,105.00 |
|
|
|
|
|
|
|
q) Left Turn
and Through Lane Use Arrow (P) (Cold Plastic) |
2 |
EACH |
$
285.00 |
$ 570.00 |
|
|
|
|
|
|
|
r)
Through Lane Use Arrow (P) (Cold Plastic) |
4 |
EACH |
$
200.00 |
$ 800.00 |
|
|
|
|
|
|
|
s) Right Turn Lane Use Arrow (Cold Plastic)
(P) |
5 |
EACH |
$
285.00 |
$ 1,425.00 |
|
|
|
|
|
|
|
t)
"ONLY" Pavement Marking (P) (Cold Plastic) |
2 |
EACH |
$
325.00 |
$ 650.00 |
|
|
|
|
|
|
|
u)
Yield Symbol (P) (Cold Plastic) |
5 |
EACH |
$
350.00 |
$ 1,750.00 |
|
|
|
|
|
|
11 |
Sanitary
Sewer Manhole Adjustment (P) |
4 |
EACH |
$
525.00 |
$ 2,100.00 |
|
|
|
|
|
|
12 |
Sanitary
Sewer Manhole Adjustment (NP) |
1 |
EACH |
$
525.00 |
$ 525.00 |
|
|
|
|
|
|
13 |
Storm
Sewer Manhole Adjustment (P) |
10 |
EACH |
$
525.00 |
$ 5,250.00 |
|
|
|
|
|
|
14 |
Water
Valve Box Adjustment (P) |
16 |
EACH |
$
475.00 |
$ 7,600.00 |
|
|
|
|
|
|
15 |
Video
Detection System (Complete) (P) |
1 |
EACH |
$
17,200.00 |
$
17,200.00 |
|
|
|
|
|
|
16 |
Remove
and Replace Median Between Kentucky Street and Vermont Street |
1 |
L.S. |
$
18,270.00 |
$
18,270.00 |
|
|
|
|
|
|
17 |
Material
Testing (P) |
1 |
F.A. |
$
10,000.00 |
$
10,000.00 |
|
|
|
|
|
|
KLINK BASE BID -
TOTAL |
|
$
886,412.00 |
|
|
|
|
|
|
|
|
|
|
|
ALTERNATE 1 - 6TH &
MAINE (Westbound Right Turn Lane Improvements) |
|
|
|
|
|
Item |
Description |
Quantity |
Unit |
Unit Price |
Amount |
|
|
|
|
|
|
1 |
Mobilization |
1 |
L.S. |
$
4,011.00 |
$ 4,011.00 |
|
|
|
|
|
|
2 |
Site Preparation |
1 |
L.S. |
$
10,702.00 |
$
10,702.00 |
|
|
|
|
|
|
3 |
11" NRDJ
Concrete Pavement |
448 |
S.Y. |
$ 62.60 |
$
28,044.80 |
|
|
|
|
|
|
4 |
AB-1 |
97 |
C.Y. |
$ 43.00 |
$ 4,171.00 |
|
|
|
|
|
|
5 |
6" FAT-SUB |
580 |
S.Y. |
$ 7.00 |
$ 4,060.00 |
|
|
|
|
|
|
6 |
Common Excavation |
100 |
C.Y. |
$ 28.00 |
$ 2,800.00 |
|
|
|
|
|
|
7 |
4" Concrete
Sidewalk |
186 |
S.Y. |
$ 31.50 |
$ 5,859.00 |
|
|
|
|
|
|
8 |
Access Ramp |
3 |
EACH |
$
650.00 |
$ 1,950.00 |
|
|
|
|
|
|
9 |
30" Concrete
Curb and Gutter |
336 |
L.F. |
$ 22.00 |
$ 7,392.00 |
|
|
|
|
|
|
10 |
Relocate Bus Shelter |
1 |
EACH |
$
2,550.00 |
$ 2,550.00 |
|
|
|
|
|
|
11 |
Waterline Relocation |
400 |
L.F. |
$
115.00 |
$
46,000.00 |
|
|
|
|
|
|
12 |
Water Meter
Relocation |
3 |
EACH |
$
450.00 |
$ 1,350.00 |
|
|
|
|
|
|
13 |
Boring for Waterline |
45 |
L.F. |
$ 40.00 |
$ 1,800.00 |
|
|
|
|
|
|
14 |
Tapping Sleeve |
1 |
EACH |
$
2,945.00 |
$ 2,945.00 |
|
|
|
|
|
|
15 |
Concrete Driveway
Apron (6") |
48 |
S.Y. |
$ 39.90 |
$ 1,915.20 |
|
|
|
|
|
|
16 |
6" Solid White
Channelization Line |
125 |
L.F. |
$ 9.50 |
$ 1,187.50 |
|
|
|
|
|
|
17 |
6" Dotted White
Lane Line |
40 |
L.F. |
$ 12.00 |
$ 480.00 |
|
|
|
|
|
|
18 |
Right Turn Lane - Use
Arrow |
3 |
EACH |
$
350.00 |
$ 1,050.00 |
|
|
|
|
|
|
19 |
Flowable Fill |
50 |
C.Y. |
$ 65.00 |
$ 3,250.00 |
|
|
|
|
|
|
20 |
Erosion Control |
1 |
L.S. |
$
1,500.00 |
$ 1,500.00 |
|
|
|
|
|
|
21 |
Seed, Fertilize and
Mulch |
1 |
L.S. |
$
750.00 |
$ 750.00 |
|
|
|
|
|
|
22 |
Traffic Signal
Work (Items of work or materials not listed as a bid item shall be considered
subsidiary
to the closest related bid items.) |
|
|
|
|
|
|
|
|
|
|
|
a) Remove and Replace Traffic Signal Service
Boxes |
1 |
L.S. |
$
4,000.00 |
$ 4,000.00 |
|
|
|
|
|
|
|
b) Install Traffic Signal Cabinet, Video
Detection and Battery Backup |
1 |
L.S. |
$ 42,000.00 |
$
42,000.00 |
|
|
|
|
|
|
|
c) Install Pedestrian
Signal Pole and Push Buttons |
1 |
L.S. |
$ 2,700.00 |
$ 2,700.00 |
|
|
|
|
|
|
23 |
Traffic Control |
1 |
L.S. |
$ 3,000.00 |
$ 3,000.00 |
|
|
|
|
|
|
ALTERNATE 1 - TOTAL |
|
$
185,467.50 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ALTERNATE 2 - 6TH & MICHIGAN (Westbound Right Turn Lane
Improvements) |
|
|
|
|
|
|
|
Item |
Description |
Quantity |
Unit |
Unit Price |
Amount |
|
|
|
|
|
|
1 |
Mobilization |
1 |
L.S. |
$ 3,383.00 |
$ 3,383.00 |
|
|
|
|
|
|
2 |
Site Preparation |
1 |
L.S. |
$
5,060.00 |
$ 5,060.00 |
|
|
|
|
|
|
3 |
11" NRDJ
Concrete Pavement |
269 |
S.Y. |
$ 62.60 |
$
16,839.40 |
|
|
|
|
|
|
4 |
AB-1 |
49 |
C.Y. |
$ 45.00 |
$ 2,205.00 |
|
|
|
|
|
|
5 |
6" FAT-SUB |
292 |
S.Y. |
$ 8.00 |
$ 2,336.00 |
|
|
|
|
|
|
6 |
Common Excavation |
65 |
C.Y. |
$ 30.00 |
$ 1,950.00 |
|
|
|
|
|
|
7 |
4" Concrete
Sidewalk |
116 |
S.Y. |
$ 31.50 |
$ 3,654.00 |
|
|
|
|
|
|
8 |
Access Ramp |
3 |
EACH |
$
650.00 |
$ 1,950.00 |
|
|
|
|
|
|
9 |
24" Concrete
Curb and Gutter |
185 |
L.F. |
$ 15.50 |
$ 2,867.50 |
|
|
|
|
|
|
10 |
Standard 7' x 5'
Storm Sewer Inlet |
1 |
EACH |
$
3,900.00 |
$ 3,900.00 |
|
|
|
|
|
|
11 |
15" CMP Storm
Sewer Pipe |
18 |
L.F. |
$ 30.00 |
$ 540.00 |
|
|
|
|
|
|
12 |
Remove
Existing Storm Sewer Inlet and Connect New Storm Sewer Pipe to Existing Storm
Sewer Pipe |
1 |
L.S. |
$
1,500.00 |
$ 1,500.00 |
|
|
|
|
|
|
13 |
Waterline Relocation |
250 |
L.F. |
$
130.00 |
$
32,500.00 |
|
|
|
|
|
|
14 |
Boring for Waterline |
68 |
L.F. |
$ 40.00 |
$ 2,720.00 |
|
|
|
|
|
|
15 |
Tapping Sleeve |
1 |
EACH |
$
2,655.00 |
$ 2,655.00 |
|
|
|
|
|
|
16 |
6" Solid White
Channelization Line |
139 |
L.F. |
$ 9.50 |
$ 1,320.50 |
|
|
|
|
|
|
17 |
6" Dotted White
Lane Line |
16 |
L.F. |
$ 12.00 |
$ 192.00 |
|
|
|
|
|
|
18 |
Right Turn Lane - Use
Arrow |
3 |
EACH |
$
350.00 |
$ 1,050.00 |
|
|
|
|
|
|
19 |
Flowable Fill |
30 |
C.Y. |
$ 65.00 |
$ 1,950.00 |
|
|
|
|
|
|
20 |
Erosion Control |
1 |
L.S. |
$
1,500.00 |
$ 1,500.00 |
|
|
|
|
|
|
21 |
Landscaping, Seed, Fertilize and
Mulch |
1 |
L.S. |
$
2,100.00 |
$ 2,100.00 |
|
|
|
|
|
|
22 |
Traffic Signal
Work (Items of work or materials not listed as a bid item
shall be considered subsidiary to the closest related bid items.) |
|
|
|
|
|
|
|
|
|
|
|
a) Install Emergency Vehicle Pre-emption |
1 |
L.S. |
$
3,100.00 |
$ 3,100.00 |
|
|
|
|
|
|
|
b) Boring for Traffic Signal Conduit |
55 |
L.F. |
$ 20.00 |
$ 1,100.00 |
|
|
|
|
|
|
|
c) 4" HDPE Traffic Signal Conduit |
43 |
L.F. |
$ 20.00 |
$ 860.00 |
|
|
|
|
|
|
|
d)
Install Traffic Signal Pole and Mast Arm**** |
1 |
L.S. |
$
6,500.00 |
$ 6,500.00 |
|
|
|
|
|
|
|
e)
Install Concrete Pad and Pedestrian Push Button |
1 |
L.S. |
$
500.00 |
$ 500.00 |
|
|
|
|
|
|
|
f)
Install Concrete Traffic Signal Service Box |
1 |
L.S. |
$
800.00 |
$ 800.00 |
|
|
|
|
|
|
|
g)
Install Traffic Signal Cabinet, Video Detection and Battery Backup |
1 |
L.S. |
$
35,250.00 |
$
35,250.00 |
|
|
|
|
|
|
23 |
Traffic Control |
1 |
L.S. |
$
3,000.00 |
$ 3,000.00 |
|
|
|
|
|
|
ALTERNATE 2 - TOTAL |
|
$
143,282.40 |
|
|
|
|
|
|
|
|
|
|
|
GRAND TOTAL (BASE BID +
ALTERNATE 1 + ALTERNATE 2) |
|
$ 1,215,161.90 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|