Memorandum
City of Lawrence
Public Works
TO: |
David L. Corliss, City Manager |
FROM: |
David P. Cronin, P.E., Project Engineer |
CC: |
Cynthia Wagner, Diane Stoddard, Chuck Soules, Shoeb Uddin, Mark Thiel |
Date: |
June 8, 2011 |
RE: |
Project PW1101: KLINK: 6th Street – Massachusetts St. to Iowa St. Mill and overlay, curb repair and full depth patching
|
Please include the following item on the City Commission Consent Agenda for consideration at the June 14, 2011 meeting.
On June 7, 2011 the City of Lawrence opened proposals for the following:
Project PW1101 – City Bid No. B1128
KLINK: 6th Street – Massachusetts St. to Iowa St.
VENDOR |
TOTAL |
Engineer’s Estimate |
$1,191,720.30 |
Sunflower Paving (bid tab) |
$1,215,161.90 |
Project Description
The project includes a 2” mill and overlay, curb repair, joint repair and full depth patching where needed. The project includes addition of a right-turn lane/bus turn-out at two locations – 6th and Maine, and 6th and Michigan.
Traffic will be maintained with at least one lane eastbound and westbound throughout project, and access will be maintained to all adjacent properties. Paving operations will begin early am (3:00 am) and cease prior to PM rush. Construction is anticipated to begin in late June with a substantially complete date of September 16, 2011. The contractor anticipates completion before September.
Project Funding
The project will be funded by KDOT, 2011 Street Maintenance Fund and with General Obligation Bonds from Resolutions No. 6891 and No. 6892. Two current projects: 6th Street – Folks Road to Monterey Way and Bob Billings Parkway – Kasold to Crestline are also being funded from the bonds in Resolutions No. 6891 and 6892.
Funding Source |
Amount |
KDOT KLINK Program |
$200,000.00 |
2011 Street Maintenance Fund |
$120,000.00 |
G.O. Bonds from Resolution 6891 |
$1,300,000.00 |
G.O. Bonds from Resolution 6892 |
$900,000.00 |
Total |
$2,520,000.00 |
Project |
Cost |
6th Street – Folks Rd to Monterey Way |
$630,112.90 |
Bob Billings Parkway – Kasold to Crestline |
$667,310.90 |
6th Street – Massachusetts to Iowa |
$1,215,161.90 |
Total |
$2,512,585.70 |
Based on current contract prices there is a balance of $7,414.30.
Action Request: Waive the Engineer’s Estimate and approve bid from Sunflower Paving for Project PW1101, KLINK: 6th Street – Massachusetts St. to Iowa St. in the amount of $1,215,161.90 provided the contractor can meet the terms established in the contract documents and contingent upon KDOT approval.