Memorandum
City of Lawrence
Utilities Department
TO: |
David L. Corliss – City Manager Cynthia Wagner - Assistant City Manager Diane Stoddard - Assistant City Manager |
FROM: CC: |
Mike Lawless – Asst. Director of Utilities Dave Wagner – Director of Utilities |
|
Philip Ciesielski – Asst. Director of Utilities Dave King – Utilities Maintenance Superintendent Mark Hegeman – Utilities Operations Superintendent Alan Landis – Purchasing Specialist |
Date: |
May 25, 2011 |
RE: |
June 7, 2011 Agenda Item – Set a Bid Date for Kaw Water Treatment Plant Sludge Collector Drive Replacement |
Please include the following item on the City Commission Agenda for consideration at the June 7, 2011 meeting:
Set a Bid Opening Date of July 5, 2011 for Bid No.B1132; Kaw Water Treatment Plant Sludge Collector Drive Replacement.
Project History/Status
The Kaw Water Treatment Plant currently has five basins that have sludge collection equipment. Two of the drive mechanisms were replaced last year as part of the O&M budget. The 2011 O&M budget has funds to replace one drive. The remaining equipment needing replacement is over twenty years old and has needed repair several times. These sludge collector drives are currently in use at the Kaw Water Treatment Plant and have exceeded their serviceable life. Utilities staff have developed bidding and construction documents for the sole source of a drive mechanism from the same manufacturer as last year to maintain consistency of equipment. However the installation can be competitively bid by any contractor. These documents are now complete and the project is ready to advertise for bidding.
Project Funding:
The project will be funded from the 2011 Operations and Maintenance budget 501.7.7220.6034.
Action Request: Set a Bid Opening Date of July 5, 2011 for Bid No. B1132; Kaw Water Treatment Plant Sludge Collector Drive Replacement.
Thank you for your assistance. Please advise if you have any questions.