horiz_Parks_Recreation-4X1 2inches
 
Project Location Project Description Estimated Funding Source    
Manager     Cost   and Status    
Mark Hobbs Park Replace sewer main to service park facilities $56,027 2009 Sales Tax -Complete 
Lynn Depot Roof replacement $29,849 2009 Sales Tax -Complete 
John / Mark Landscape Shop Replace molded insulation in shop $25,645 2009 Sales Tax PO Cut
Mark DeVictor Park Phase II of trail development along west side of park $19,724 2009 Sales Tax -Complete 
Kerry Youth Sports Complex Irrigation for new baseball / softball fields 5-8 $14,778 2009 Sales Tax -Complete 
Mitch / Rowan South Park / Walnut Park Install rubberized play surface under playground  $14,579 2009 Sales Tax -Complete 
John Arboretum / 27th street Asphalt patching on road and parking lot $14,180 2009 Sales Tax -Complete 
John Indoor Aquatic Center Install BigFan's in Leisure pool  $13,807 2009 Sales Tax -Complete  Energy Efficiency Project
Kerry Youth Sports Complex Grading and leveling baseball / softball fields 5-8 , prep for seeding $12,500 2009 Sales Tax -Complete 
John Indoor Aquatic Center Install BigFan's in Lap pool  $12,057 2009 Sales Tax -Complete  Energy Efficiency Project
Mark Depot Emergency Boiler Replacement $11,950 2009 Sales Tax -Complete  Energy Efficiency Project
John Holcom Park Center Install HVAC control system $10,688 2009 Sales Tax -Complete  Energy Efficiency Project
John Downtown Concrete work on tree grates $9,978 2009 Sales Tax -Complete 
John Hobbs Park Outfield fence replacement $9,516 2009 Sales Tax -Complete 
John Memorial Park Cemetery Install curb to divert water run-off from roads to 15th street $9,333 2009 Sales Tax -Complete 
Mark Youth Sports Complex Road addition near soccer field #14 $9,301 2009 Sales Tax -Complete 
John Indoor Aquatic Center Replace pipes for heat exchanger on pool heater $9,021 2009 Sales Tax -Complete  Energy Efficiency Project
John Downtown Install next set of tree grates - concrete $9,021 2009 Sales Tax -Complete 
John Holcom Complex Install foul line fences on t-ball diamonds $8,604 2009 Sales Tax -Complete 
Kerry Youth Sports Complex Ag lime for infields on  baseball & softball field 5-8 $8,480 2009 Sales Tax -Complete 
Lynn Holcom Park Center Repaint top half of gym $8,400 2009 Sales Tax -Complete 
Lynn Outdoor Aquatic Center Replace caulking on deck around pool $7,450 2009 Sales Tax -Complete 
John Community Building Replace gym lights with high efficiency fluorescents $7,414 2009 Sales Tax -Complete  Energy Efficiency Project
Kerry YSI Complex Begin replacing old bleachers with portable aluminum type $7,305 2009 Sales Tax -Complete 
Lynn Community Building Replace main boiler for building water $6,700 2009 Sales Tax -Complete 
John Hobbs Park Architect for Site Plan and HRC approval $5,400 2009 Sales Tax -Complete 
John / Kerry EBGC Replace sewer pumps at maintenance shop $5,000 2009 Sales Tax -Complete 
John South Park Repair sewer pumps in park restroom $5,000 2009 Sales Tax -Complete 
John Prairie Park Natrue Center Repair sewer main $4,770 2009 Sales Tax -Complete 
John Dad Perry, Holcom Painting of Park Restrooms $4,500 2009 Sales Tax -Complete 
Lynn Aquatics Retrofit all main pool drains to comply with new law $4,333 2009 Sales Tax -Complete 
John Downtown Install next set of tree grates - electric $4,000 2009 Sales Tax -Complete 
John Depot Electrical upgrades for holiday lighting $4,000 2009 Sales Tax -Complete 
John DeVictor Park Install 100ft of concrete path to prevent erosion $3,640 2009 Sales Tax -Complete 
Lynn Outdoor Pool Repair / Replace pump for enclosed slide $3,213 2009 Sales Tax -Complete  Energy Efficiency Project
Lynn Indoor Aquatic Center Replace drinking fountains in leisure pool area $2,089 2009 Sales Tax -Complete  Energy Efficiency Project
John Outlet Park Install new roof on west shelter $1,840 2009 Sales Tax -PO Cut 
John Hobbs House Paint trim on building $1,800 2009 Sales Tax -Complete 
Kerry EBGC Drinking fountains on #5 and #15 $1,710 2009 Sales Tax -Complete 
Lynn Aquatics Retrofit pool suction line on drop slide to comply with new law $1,625 2009 Sales Tax -Complete  Energy Efficiency Project
      $399,227
Added Project (Per City Mgr Direction)        
Mark / Lynn Indoor Aquatic Center Roof Painting of ceiling trusses after roof is repaired $62,567 2009 Sales Tax -PO Cut 
Jim 29th Street Terr  Install dirt and seed center islands - add trees in fall $8,495 2009 Sales Tax -PO Cut 
Lynn Indoor Aquatic Center Roof Engineer to review roof  repairs $4,200 2009 Sales Tax -PO Cut 
Crystal 8th & Mass New tree grate south of Noodle Company $1,045 2009 Sales Tax -PO Cut 
         
         
    Sales Tax Projects Completed 2009 (212 Budget)   $475,534
         
John Youth Sports Complex Dugout fences and outfield fences on diamonds 5,6,7,8 $14,919 216 Budget PO Cut
John DeVictor Park Install concrete trail to replace ag lime at NW end of park $14,560 2009 - 216  - Complete
John Youth Sports Complex Additional concrete sidewalks & bleacher pads for fields  5,6,7,8 $13,000 DCABA Revenue & 216 
John Holcom Complex ADA sidewalks to new t-ball diamonds $12,997 2009 - 216  - Complete
Kerry YSI Soccer Install irrigation on fields # 5,6,7,8 and 9 $10,837 2009 - 216  - Complete
Kerry YSI Baseball New outfield fences on diamonds #3 & #4 $9,000 2009 - 216  - Complete
John Youth Sports Complex Dugout pads for field #5, #6, #7 & #8 $8,624 2009 - 216  - Complete
John DeVictor Park Dirt work and rip rap for ditch in NW corner  $6,950 2009 - 216  - Complete
John Holcom Complex Sidewalk to connect north diamonds  $6,583 2009 - 216  - Complete
Kerry Youth Sports Complex Install rock for road to cross channel west of complex $6,568 2009 - 216  - Complete
John Community Building Install gym lights with high efficiency fluorescents $5,800 2009 - 216  - Complete Energy Efficiency Project
John Hobbs Park Connect to new sewer manhole on north side of park  $5,720 2009 - 216  - Complete
John Holcom Complex Fence Repair on ball diamonds $4,240 2009 - 216  - Complete
John DCABA baseball Replace electrical switching for Cowser baseball field $4,165 2009 - 216  - Complete Energy Efficiency Project
Mark Oak Hill Cemetery Asphalt for road patching $4,000 2009 - 216  - Complete
Mitch Burcham Park Asphalt to repair road (Public Works to do the work) $4,000 2009 - 216  - Complete
Crystal All Parks Spring flower bids $3,902 2009 - 216  - Complete
John Arboretum Install concrete sidewalk to finish water conservation garden $3,580 2009 - 216  - Complete
John Hobbs Park Sidewalk replacement for restrom project $3,459 2009 - 216  - Complete
John Arboretum Concrete drain and sidewalk work $3,166 2009 - 216  - Complete
Mitch / Crystal Burroughs Creek Trail Benches for along trail $3,060 2009 - 216  - Complete
Lynn Indoor Aquatic Center Replacement floatables $3,043 211-4080 - PO Cut
Kerry Youth Sports Complex New storage shed for soccer equipment $3,015 2009 - 216  - Complete
John Youth Sports Complex Install electric for irrigation controller baseball / softball fields 5-8 $3,000 2009 - 216  - Complete
John Veterans Park Repair light pole on courts $3,000 2009 - 216  - Complete
John DeVictor Park Install rip rap along new concrete trail section $3,000 2009 - 216  - Complete
Mitch Levee Trail Continue  Ag lime resurfacing projects $2,975 2009 - 216  - Complete
Lynn East Lawrence Center Install panic bars locks on 3 front doors $2,949 2009 - 216  - Complete
John Holcom Complex Install new roof on roundhouse $2,850 2009 - 216  - Complete
Lynn Indoor Aquatic Center & ELC Ladders to more safely access the roof $2,848 216 Budget PO Cut
John Prairie Park Nature Center Repair wall under window in pre-school room $2,775 2009 - 216  - Complete
John SLT Trail Additions to concrete trail south of district #1 maint shop $2,706 2009 - 216  - Complete
John Watson Park Replace park lights with LED $2,700 2009 - 216  - Complete Energy Efficiency Project
Rowan South Park Additional rubber playgroud surfacing $2,219 2009 - 216  - Complete
Crystal Right-of Way Replace electric irrigation controllers with battery powered $2,085 2009 - 216  - Complete Energy Efficiency Project
Lynn Outdoor Aquatic Center Finish caulking concrete pool decks $2,009 211-4080 - PO Cut 
Lynn South Park Center Interior painting  $2,000 2009 - 216  - Complete
John CLSC Repair infield lights on diamonds $2,000 2009 - 216  - Complete
John Prairie Park Nature Center Repair underground electric line in center island $2,000 2009 - 216  - Complete
John CLSC Electrical repairs to right field light pole field #4 $2,000 2009 - 216  - Complete
John Centennial Park Electrical upgrades for holiday lighting $2,000 2009 - 216  - Complete
Mitch Burroughs Creek Park Purchase property markers $1,979 2009 - 216  - Complete
Lynn Outdoor Aquatic Center Replace benches around pool deck $1,972 2009 - 216  - Complete
Lee YSI Complex Foul poles for YSI diamonds #3 and #4 $1,970 2009 - 216  - Complete
John / Marty Nature Center Install spider web climber for playground $1,770 211-4070 - PO Cut
Lynn East Lawrence Center Remove sink in meeting room and install new cabinets $1,680 2009 - 216  - Complete
Kerry YSI Complex Replace main entrance gate $1,650 2009 - 216  - Complete
Lynn Community Building Replace rubber tiles at building entrance $1,610 216 Budget PO Cut
John Peterson Park Install playground climber $1,600 2009 - 216  - Complete
Mitch Rail Trail Cap trail with new ag lime screening (23rd to 29th) $1,588 2009 - 216  - Complete
Lynn Community Building Install storage room door in community room $1,562 2009 - 216  - Complete
Lynn Community Building Repair tile floor in shower $1,501 2009 - 216  - Complete
John Holcom Complex Electrical service installation for roundhouse $1,500 2009 - 216  - Complete
John Youth Sports Complex Grade and roll new parking lots $1,500 2009 - 216  - Complete
John South Park Center Sewer repair $1,500 2009 - 216  - Complete
Kerry CLSC Install new green safety rail cap on all outfield fences $1,497 2009 - 216  - Complete
John Holcom Complex Pole bases for bull pen lights $1,446 2009 - 216  - Complete
Lynn Community Building Replace ceiling tiles in stairwells $1,400 2009 - 216  - Complete
John Landscape Shop Replace AC unit $1,400 2009 - 216  - Complete Energy Efficiency Project
Crystal Arboretum Purchase rock to repair waterfall and install rain garden $1,300 2009 - 216  - Complete
Crystal Arboretum Rocks for new seating area by west pond $1,300 2009 - 216  - Complete
John Holcom Complex Install concrete additions to t-ball dugouts $1,293 2009 - 216  - Complete
Lynn Indoor Aquatic Center Replace rubber tiles at building entrance $1,292 211-4080 - PO Cut
Mitch Oak Hill Cemetery Replace fence behind shop $1,285 216 Budget PO Cut
Kerry YSI Complex Treat parking lots to reduce dust $1,240 2009 - 216  - Complete
Lynn East Lawrence Center Paint exterior tile at building entrance $1,200 216 Budget PO Cut
John Depot Replace outdoor AC unit for theater room $1,190 2009 - 216  - Complete Energy Efficiency Project
Lynn KDOL Eye wash stations for facilities $1,149 2009 - 216  - Complete
John Holcom Complex Paint Pickle Ball courts on tennis courts $1,125 2009 - 216  - Complete
Lynn Community Building Upgrades to dance studio mirrors $1,095 2009 - 216  - Complete
Mitch Memorial Park Cemetery Replace carpet in office $1,094 2009 - 216  - Complete
Rowan Holcom Complex Replace torn wind screen $1,069 2009 - 216  - Complete
Rowan South Park Replace Flippo playground piece $1,057 2009 - 216  - Complete
John Clinton Park Install drinking fountain on restroom $1,026 2009 - 216  - Complete
John YSI Replace transformer for irrigation controllers $1,000 2009 - 216  - Complete
Lynn CB & HPC Replace door closer at building entrances $990 2009 - 216  - Complete
Jim Clinton Parkway Reseed Native grass areas $978 2009 - 216  - Complete
Lynn Depot Repair gutters $973 2009 - 216  - Complete
John EBGC Upgrade electric so that coolers can be moved to concessions $970 2009 - 216  - Complete Energy Efficiency Project
John Carnegie Building Repair wall that was damaged by truck $950 2009 - 216  - Complete
Kerry DeVictor Park Plant Native Grass Areas $950 2009 - 216  - Complete
Mitch Rail Trail Ag lime for phase I $950 2009 - 216  - Complete
Kerry YSI Complex New entrance Sign $950 2009 - 216  - Complete
Rowan Playgrounds Replace Swing Mats $949 2009 - 216  - Complete
Kerry Youth Sports Complex Install drainage tubes for road to cross channel west of complex $948 2009 - 216  - Complete
John Hand Park Replace park light with LED $900 2009 - 216  - Complete Energy Efficiency Project
John Burroughs Creek Park Replace gutters on west building at 15th street $813 2009 - 216  - Complete
Lynn Community Building Upgrades to art room $800 2009 - 216  - Complete
Rowan Holcom Complex Footings for retaining walls $800 2009 - 216  - Complete
Mitch Rail Trail Cap trail with new ag lime screening (23rd to 29th) $793 2009 - 216  - Complete
John Veterans Park Install new light control switching on courts to conserve energy $786 2009 - 216  - Complete Energy Efficiency Project
Lynn Holcom Park Center Replace bench seat in lobby $783 2009 - 216  - Complete
John East Lawrence Center Repair Scoreboards $752 2009 - 216  - Complete
Kerry Clinton Lake City Park Clearing and grubbing trees for new road $750 2009 - 216  - Complete
Rowan Holcom Complex Sod replacement on Holcom Blue $720 2009 - 216  - Complete
Lynn Community Building Replace ceiling tiles and benches in weight room $600 2009 - 216  - Complete
John Hobbs Park Soils testing for restroom $600 2009 - 216  - Complete
John Holcom Complex Replace door closers on restroom doors $565 2009 - 216  - Complete
John Broken Arrow Replace door on restroom $553 2009 - 216  - Complete
John Youth Sports Complex Parking lot striping $525 2009 - 216  - Complete
John LIAC Remove remaining old light fixtures above viewing area  $523 2009 - 216  - Complete Energy Efficiency Project
Crystal Right-of-way Repair round-a-bout at Kasold & Grand Vista $516 2009 - 216  - Complete
John Community Building Install new electrical circuit for pop machines $500 2009 - 216  - Complete
Crystal City Hall Repair damaged retaining wall on east end of building $495 2009 - 216  - Complete
Crystal South Park Repairs to brick planting beds $350 2009 - 216  - Complete
Lynn Holcom Park Center Install shade screens on windows in Bly room $344 2009 - 216  - Complete Energy Efficiency Project
John Broken Arrow Tuck point rock pillars at Broken Arrow Shelter $250 2009 - 216  - Complete
John Holcom Park  Parking lot striping - South Lot $165 2009 - 216  - Complete
         
    Special Rec Fund Projects Completed 2009 (216 Budget)   $271,635
   
Lynn Indoor Aquatic Center New Chemtrolers (2) $4,828 211-4080 PO Cut Energy Efficiency Project
Ernie Office / CB / HPC Replace terminal server for phone systems $8,134 211-4000-590 PO Cut
Kerry Youth Sports Complex Replace bleachers on baseball/softball fields 3 & 4 $7,303 211-4030 - PO Cut
Kerry Youth Sports Complex Bleachers for field 5, 6, 7 & 8 $7,303 211-4050 - PO Cut
Tim/Lynn East Lawrence Center Purchase and install new volleyball system $6,975 211-4005-590 - PO Cut
Tim Community Building Replace treadmill $6,216 211-4000 PO Cut
Brent/Danny Holcom Complex Roundhouse storage facility - Install new siding & roof  $5,160 211-4030-590 - PO Cut
Kerry / Lee Youth Sports Complex Benches for dugouts on fields 5, 6,7& 8 $4,240 211-4030 - PO Cut
Lynn/ Tim Union Pacific Depot Table & Chair replacement $4,134 211-4005 PO Cut
Lynn Outdoor Aquatic Center Replace deck chairs for around the pool $3,989 211-4080 - PO Cut 
Lynn Nature Center Replace Carpet in classroom and preschool room  $3,585 211-4070  - PO Cut
Jimmy Indoor Aquatic Center Replace timer touch pads (4) $3,299 211-4080-590 - PO Cut
Kerry CLSC Batting Cages Pitching machine maintenance and upgrade  $3,500 211-4020 - PO Cut
John Holcom Complex Lights for bull pens on Ice Field $2,715 211-4000 PO Cut
John Holcom Complex Install lights for bull pens on Ice Field $2,500 211-4030-590 - PO Cut
Rowan Holcom Complex Level aprons on Ice Field and Red fields $2,400 211-4000 PO Cut
John ELC Repair curtain in gym $2,376 211-4005 - PO Cut
Rowan Holcom Complex Sod for aprons on Ice Field and Red fields $2,304 211-4000-590 -  PO Cut
Lee Youth Sports Complex Purchase portable pitching mound $2,300 211-4030 - PO Cut
Lynn Indoor Aquatic Center Replace lamps in UV water sterilization system $2,142 211-4080-590 - PO Cut
Lynn/Jo Community Building Dance room & bike room stereo w security cabinet $1,995 211-4010-590-   PO Cut
John Indoor Aquatic Center Repair bearings on exhaust fan for unit #1 $1,450 211-4080 PO Cut
Lynn Indoor Aquatic Center Replace rubber tiles at building entrance $1,292 211-4080 - PO Cut
John  Nature Center Electrical work inside of building $1,200 211-4070 PO Cut
John Indoor Aquatic Center Replace motor on pool pump $1,073 211-4080 PO Cut
John Outdoor Aquatic Center Install electric for pop machines $1,000 211-4080 PO Cut
Bob Gyms Purchase portable score clock $974 211-4020-590   -    Visa
Lynn Outdoor Aquatic Center Plumbing parts for new slide pump $900 211-4080 PO Cut
Lynn Indoor Aquatic Center repair water damaged ceiling $530 211-4080 PO Cut
Jo CB / HPC Purchase additional stability ball $378 211-4010-590   -    Visa
    Recreation Fund Projects completed 2009 (211 Budget)   $96,195
   
Jim Right-of-way tree trimming Trim trees between 7th & 15th, east of New Hampshire $12,000 001-4580-PO Cut
John Parks & Downtown Electrical work for parks and downtown $6,500 001-4510 PO Cut 
John Downtown Concrete work to install additional tree grates  $5,000 001-4510 PO Cut 
Jim Right-of-way Removal and pruning of trees $5,000 001-4580-590- PO Cut
Mitch Burcham Park Rip Rap to repair trail erosion between Burcham & Constant $4,320 001 4510 & 4560 PO Cut Project not yet completed
John Depot Install computer control system for HVAC units $3,817 001-4510 PO Cut  Energy Efficiency Project
John Prairie Park Nature Center Install computer control system for HVAC units $3,817 001-4510 PO Cut  Energy Efficiency Project
John / Mitch Oak Hill Cemetery Repair of damaged concrete in driveway $3,477 001-4510 PO Cut 
John Hobbs Park Plumbing construction management for restroom  $2,700 001-4510 PO Cut 
Mitch DCABA Laser level 3 infields $2,400 001-4510 PO Cut 
John Broken Arrow Park Install new circuit for pitchng machine on ball diamond $1,850 001-4510 PO Cut 
Kerry CLSC Laser level 2 infields $1,600 001-4510 PO Cut 
Rowan Holcom Complex Laser level 2 infields $1,600 001-4510 PO Cut 
John Broken Arrow & Holcom Install new electrical circuits for pop machines $1,200 001-4510 PO Cut 
John/Kerry Youth Sports Complex Paint football goal posts $995 001-4545-594-3309 PO Cut
MItch DCABA Ag lime for infields $795 001-4510 PO Cut 
Kerry Youth Sports Complex Concrete highway dividers to line bike path along new road $700 001-4510 PO Cut 
John  South Park Restroom Replace downspout $540 001-4510 PO Cut 
Crystal North Kasold Repair round-a-bout $532 001-4570-597-3309 PO Cut
Lynn Holcom Park Center Replace bateries in floor machine $500 001-4510-591-4209
Jim 28th & O'connell Repair Round-a-bout $476 001-4580-598-3309
Lynn Holcom Park Center Repair entrance door $450 001-4510-591-3309
John Centennial Park Concrete upgrade for truck turn around near skate park $436 001-4510-PO Cut
Rowan Holcom Complex Sod for area around t-ball $360 001-4510 PO Cut 
    General Fund Projects completed 2009 (001-4500 Budget)   $61,065
     
John Hobbs Park Replace Park Restroom $45,105 2008 Sales Tax - PO Cut
Crystal City Right-of-way Master Street tree project $40,470 Master street tree fund 2008
John / Kerry Youth Sports Complex Fencing for new fields #5, #6, #7 & #8 $31,253 Revenue & donation - PO Cut
Crystal Right-of-way Master street tree project $19,000 Master street tree fund 
Jim / John Downtown Upgrade & replace some of the holiday lights $14,996 503-2300-563-PO Cut
Crystal Downtown Purchase next set of tree grates $14,986 503-230-563-6008 PO Cut
Kerry Eagle Bend Golf Course Zoysia for #4 fairway $14,500 EBGC Reserve - PO Cut Project not yet completed
Kerry EBGC Install Zoysia sod on #7 fairway $11,253 506-4900-599 PO Cut
Mitch Oak Hill Cemetery Seal roads on south east side of cemetery  $11,000 601 budget - Perpetual Care Fund
Crystal E 1700 Road Park Install landscpaping and screening  for pump station #49 $8,500 Benefit district funding
Kerry EBGC Zoysia sod fairway (from cottonwoods to green)  $7,980 506-4910-599-4201- PO Cut
John Eagle Bend Golf Course Replace concrete path on #17 after dirt work is complete $6,733 EBGC - PO Cut
John Eagle Bend Golf Course Add dirt to raise path on #17 to prevent flooding $6,000 EBGC - PO Cut
Crystal Right-of-way Master Street Tree Project $5,964 Master Street Tree Budget
Kerry Eagle Bend Golf Course Drainage pipe for #4 fairway $3,456 EBGC Budget - PO Cut Project not yet completed
Crystal 2nd & Locust Landscape parking lot $3,131 PW project funding PO Cut Project not yet completed
Crystal / John South Park Memorial Benches in South Park (2) $2,540 Memorial tree fund - PO Cut
John Lyons Park Install new light by shelter $2,500 2008 CDBG Funded Energy Efficiency Project
Crystal Downtown Trash can replacement $2,094 503-2300-563-4203 PO Cut
Kerry Eagle Bend Golf Course Excavation work for hole #4 fairway $1,840 EBGC Budget - PO Cut Project not yet completed
Kerry / John Mc Eagle Bend Golf Course Tree Spade trees to rough on #10 & #18 $1,400 EBGC - PO Cut
John Veterans Park Install new pole base for basketball court light pole $1,148 Use Blanket PO from 2008
Lynn Indoor Aquatic Center Replace entire roof  ( $400,000 project) $0 Warranty Work
John Centennial Skate Park Replace skate park surfacing $0 Warranty Work
    Other Fund Projects    $255,849
     
2009 projects completed $1,160,278
Mark Burroughs Creek Trail Install new 10' concrete trail $591,632 KDOT Grant and Sales Tax