Memorandum

City of Lawrence

Utilities Department

 

TO:

David L. Corliss – City Manager

Cynthia Wagner - Assistant City Manager

Diane Stoddard - Assistant City Manager

FROM:

John Shutak – Utilities Engineer

CC:

Dave Wagner – Director of Utilities

Philip Ciesielski – Asst. Director of Utilities

Mike Lawless – Asst. Director of Utilities

Beth Frailey Krishtalka – Assistant to Director

Mark Hegeman – Utilities Operations Superintendent

Date:

November 30, 2010

RE:

December 07, 2010 Agenda Item – Award bid for Bid No. 1058 for Project UT0905CS, Sanitary Sewer Main Replacement for the 1100 block of Delaware Street, the 1500 block New Hampshire Street and the 700 block of Michigan Street.

 

Please include the following item on the City Commission Agenda for consideration at the December 07, 2010 meeting:

Award the construction contract for Bid No. B1058; Project UT0905CS, Sanitary Sewer Main Replacement for the 1100 block of Delaware Street, the 1500 block of New Hampshire Street and the 700 block of Michigan Street; to the low bidder Nowak Construction in the amount of $598,477.70 and authorize the City Manager to execute the contract.

 

Project Details

Department of Utilities staff continuously evaluates the condition of the wastewater collection system as part of the regular maintenance program. Based on efforts to perform video inspection of the existing lines servicing the 1100 block of Delaware Street and the 1500 block of New Hampshire Street, it has become apparent that the sanitary sewer lines are in a deteriorated state and require replacement. The sewer lines are cracked and collapsed to the point a video inspection was not possible. Department of Utilities staff have repaired the City main or responded to service backups five (5) times in the past year for the existing line servicing the 1100 block of Delaware and six (6) times in the past year for the existing line servicing the 1500 block of New Hampshire.

 

The existing sewer lines servicing both the 1100 block of Delaware Street and the 1500 block of New Hampshire consist of 6 inch diameter vitrified clay pipe and have been in service for over 70 years.


The existing sewer lines servicing the 700 block of Michigan were identified in the 2003 Wastewater Master Plan as project #CS04-08. This area has been a source of sanitary overflow and backup problems during high rainfall events. Utilities staff placed flow monitoring equipment at select manhole locations to identify the problem areas. Phase 1 of the project, completed in January 2008 as part of project UT0702CS, involved installation of approximately 2500 feet of cured-in-place-pipe (CIPP) liner. Phase 2 of project UT0702CS involves the installation of approximately 640 feet of cured-in-place-pipe (CIPP) liner in the East right-of-way along Michigan Street and approximately 217 linear feet of 12 and 8 inch diameter PVC sanitary sewer pipe. Phase 2 of project UT0702CS will be completed as part of project UT0905CS.

 

The total project will include the installation of approximately 1,080 linear feet of sanitary sewer line servicing the 1100 block of Delaware Street, approximately 630 linear feet of sanitary sewer line servicing the 1500 block of New Hampshire Street, and approximately 217 linear feet of sanitary sewer line and 640 feet of cured in place pipe (CIPP) servicing the 700 block of Michigan Street as identified on the project maps.

 

Project History

 

Engineer’s Estimate                      $527,443.00

Nowak Construction                     $625,081.70

 

 

Project Status:

On November 23, 2010 a bid was received from the following bidder. The bid was opened and publicly read aloud.

 

Engineer’s Estimate                      $633,038.50

Nowak Construction                     $598,477.70 without alternate 1

$573,477.70 with alternate 1

 

Alternate 1 is described as follows:

 

In lieu of pipe reaming the existing sewer main, the sewer main for the 1500 block of New Hampshire will be installed via horizontal directional drill directly below the existing line and manholes along New Hampshire Street and approximately 35 feet of 8 inch diameter sewer pipe will be eliminated.

 

BG consultants has reviewed the bids and qualifications of the low bidder and, per the attached letter and bid tabulation, recommend awarding the bid without alternate 1 to the low bidder Nowak Construction. The final scope of work and resulting deductive change order(s) for the implementation of alternate 1 will be determined based on future discussion and negotiation with Nowak Construction and City Staff.


Project Schedule

          Set Bid Date                      November 02, 2010

Pre-Bid Meeting                  November 16, 2010

Bid Opening                      November 23, 2010

          Award Bid                         December 07, 2010

          Notice to Proceed               January 2011

          Substantial Completion        April 2011

 

Project Funding:

Design and easement acquisition costs for the above referenced project are funded from the 2009 Department of Utilities non-bonded construction fund. Construction will be funded from the reallocation of previous Department of Utilities bond issues per resolution 6898 included as part of the agenda for the August 03, 2010 City Commission Meeting.

Recommendation

Award the construction contract for Bid No. B1058; Project UT0905CS, Sanitary Sewer Main Replacement for the 1100 block of Delaware Street, the 1500 block of New Hampshire Street and the 700 block of Michigan Street; to the low bidder Nowak Construction in the amount of $598,477.70 and authorize the City Manager to execute the contract.

 

Thank you for your assistance. Please advise if you have any questions.