Memorandum

City of Lawrence

Utilities Department

 

To:

David Corliss, City Manager

Cynthia Wagner, Assistant City Manager

Diane Stoddard, Assistant City Manager

From:

Bob Brower, Wastewater/Utilities  Field Operations Manager

CC:

Dave Wagner, Director of Utilities

Mike Lawless, Assistant Utilities Director

Beth Krishtalka, Utilities Management Analyst

Mark Hegeman, Utilities Operations Superintendent

Alan Landis, Purchasing Specialist

Date:

July 27, 2010

RE:

August 03, 2010 City Commission Agenda - Approve Contract Renewal of Emergency Sewer Repair Contractor – Bid No. B09036

 

Please include the following item on the City Commission agenda for consideration at the August 03, 2010 meeting.

 

Approve Contract Renewal of Bid No. B09036 with Vito’s Plumbing for the 2010 Emergency Sewer Repair Contractor.

 

HistoryIn 2009, 53 point repairs were completed for a cost of $225,822, with the average cost per repair of $4,260. In 2010 from 01/01/2010 through 07/16/2010, 30 point repairs were completed at a cost of $110,643 with the average cost per repair of $3,688. The point repairs were completed in various areas throughout the city.

 

In June 2009, the Utility Department requested bids for unit pricing to repair sanitary sewer mains, force mains, manholes and air relief valves. This bid is for small point repairs that will cost less than $15,000.

 

On July 14, 2009, bids were opened. Bids were received from RD Johnson Excavating and Vito’s Plumbing (see attached bid tabs). Vito’s Plumbing submitted the low unit bid pricing. The bid pricing was from 08/01/09 through 08/01/2010 with a bid option to renew the contract for an additional two years. There is no increase in unit pricing for the period of 08/01/2010 through 08/01/2011.

 

Project Funding:  The emergency sanitary sewer repairs will be funded from the 2010 Operations and Maintenance budget 501.7.7410.2538.

 

Recommendation Action:  Staff recommends approval of the contract renewal of Bid No. B09036 with Vito’s Plumbing for the 2010 Emergency Sewer Repair Contractor.

 

 

BID TABS

Vito's

 Cost per Hour

 Cost per Hour

 

 

 

LABOR

 Regular Hours

 After Hours Sundays Only

 

Materials/Parts Cost

% over cost

Employee 1 (supervisor)

 $         52.50

 $        66.50

 

All Pipe

10%

Employee 2 (laborer)

 $         35.50

 $        49.50

 

All Fittings

10%

Employee 3 (plumber)

 $         62.00

 $        76.00

 

Flow-able Fill

10%

Employee 4

 $              -  

 $             -  

 

Concrete

10%

Employee 5

 $              -  

 $             -  

 

Asphalt

10%

 

 

 

 

Gravel

10%

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

Dirt

10%

Back Hoe (rubber tire)

 $         72.50

 $        86.50

 

Property Restoration

% over cost

Back Hoe with  Hammer

 $       104.00

 $      118.00

 

Fence

10%

Back Hoe with  Compactor

 $         94.00

 $      108.00

 

Silt Fence

10%

Excavator 331     

 $         74.00

 $        88.00

 

Erosion Control

10%

Excavator 331 with Hammer

 $         95.00

 $      109.00

 

Equipment

10%

Excavator 138    

 $       104.00

 $      118.00

 

Sod

10%

Excavator 138 with Hammer

 $       210.00

 $      224.00

 

Grass Seed

10%

Excavator 220

 $       126.00

 $      140.00

 

Fertilizer

10%

Excavator 220 with Hammer

 $       252.00

 $      266.00

 

Straw and Blower

10%

Excavator 228

 $       126.00

 $      140.00

 

 

 

Excavator 228 with Hammer

 $       252.00

 $      266.00

 

 

 

Excavator 300

 $       160.00

 $      174.00

 

 

 

Excavator 300 with Hammer

 $       350.00

 $      364.00

 

 

 

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

Vito’s Plumbing

 

Dump Truck/Driver

 

 

 

 

 

Single Axle

 $         54.50

 $        68.50

 

 

 

Tandem Axle

 $         70.00

 $        84.00

 

 

 

Triple Axle/Barrel   

 $         75.00

 $        89.00

 

 

 

End Dump

 $         82.00

 $        96.00

 

 

 

6 Wheel Cat Cart   

 $       135.00

 $      149.00

 

 

 

Low Boy

 $         95.00

 $      109.00

 

 

 

Water Truck/Water

 $         75.00

 $        89.00

 

 

 

Other Equipment

 Regular Hours

 After Hours Sundays Only

 

 

 

953 Loader/Rock

 $       122.00

 $      136.00

 

 

 

963 Loader/Rock

 $       132.00

 $      146.00

 

 

 

D-65 EX Dozer

 $       140.00

 $      154.00

 

 

 

Track Skid Steer

 $         80.00

 $        94.00

 

 

 

Bob Cat/Uni-loader

 $         70.00

 $        84.00

 

 

 

180 Wheel Loader/   3 yd

 $         90.00

 $      104.00

 

 

 

250 Wheel Loader/   4 yd

 $         95.00

 $      109.00

 

 

 

By-Pass Pumps

 $         35.00

 $        49.00

 

 

 

By-Pass Pumping Hose, Pipe, fittings

 $         45.00

 $        59.00

 

 

 

Mobilization

 1 hour

 1 hour

 

 

 

 

 

 

 

 

 

 

RD Johnson

 Cost per Hour

 Cost per Hour

 

 

 

LABOR

 Regular Hours

 After Hours Sundays Only

 

Materials/Parts Cost

% over cost

Employee 1 (supervisor)

 $         55.00

 $        70.00

 

All Pipe

15%

Employee 2 (laborer)

 $         40.00

 $        55.00

 

All Fittings

15%

Employee 3 (plumber)

 $         64.00

 $        79.00

 

Flow-able Fill

15%

Employee 4

 $              -  

 

 

Concrete

15%

Employee 5

 $              -  

 

 

Asphalt

15%

 

 

 

 

Gravel

15%

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

Dirt

15%

Back Hoe (rubber tire)

 $         75.00

 $        90.00

 

Property Restoration

% over cost

Back Hoe with  Hammer

 $       105.00

 $      120.00

 

Fence

15%

Back Hoe with  Compactor

 $         95.00

 $      110.00

 

Silt Fence

15%

Excavator 331     

 $         75.00

 $        90.00

 

Erosion Control

15%

Excavator 331 with Hammer

 $         95.00

 $      110.00

 

Equipment

15%

Excavator 138    

 $       105.00

 $      120.00

 

Sod

15%

Excavator 138 with Hammer

 $       210.00

 $      225.00

 

Grass Seed

15%

Excavator 220

 $       126.00

 $      141.00

 

Fertilizer

15%

Excavator 220 with Hammer

 $       252.00

 $      267.00

 

Straw and Blower

15%

Excavator 228

 $       126.00

 $      141.00

 

 

 

Excavator 228 with Hammer

 $       252.00

 $      267.00

 

 

 

Excavator 300

 $       160.00

 $      175.00

 

 

 

Excavator 300 with Hammer

 $       350.00

 $      365.00

 

 

 

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

RD JOHNSON

 

Dump Truck/Driver

 

 

 

 

 

Single Axle

 $         55.00

 $        70.00

 

 

 

Tandem Axle

 $         70.00

 $        85.00

 

 

 

Triple Axle/Barrel   

 $         75.50

 $        90.50

 

 

 

End Dump

 $         83.50

 $        98.50

 

 

 

6 Wheel Cat Cart   

 $       135.00

 $      150.00

 

 

 

Low Boy

 $         95.00

 $      110.00

 

 

 

Water Truck/Water

 $         75.00

 $        90.00

 

 

 

Other Equipment

 Regular Hours

 After Hours Sundays Only

 

 

 

953 Loader/Rock

 $       122.00

 $      137.00

 

 

 

963 Loader/Rock

 $       132.00

 $      147.00

 

 

 

D-65 EX Dozer

 $       140.00

 $      155.00

 

 

 

Track Skid Steer

 $         80.00

 $        95.00

 

 

 

Bob Cat/Uni-loader

 $         70.00

 $        85.00

 

 

 

180 Wheel Loader/   3 yd

 $         90.00

 $      105.00

 

 

 

250 Wheel Loader/   4 yd

 $         95.00

 $      110.00

 

 

 

By-Pass Pumps

 $         35.00

 $        50.00

 

 

 

By-Pass Pumping Hose, Pipe, fittings

 $         45.00

 $        60.00

 

 

 

Mobilization

 1 hour

 1 hour