CITY OF LAWRENCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City Bid No. B09069 -
Project No. PW0914 - Clinton Parkway Shared-Use Paths |
|
|
BID TAB - Bid Date: December 15, 2009 |
|
|
Engineer's
Estimate: Base Bid - $633,850.00;
Alternate Bid "A" - $216,046.00; |
|
|
Alternate Bid "B" - $147,692.00 |
|
|
|
|
|
|
R. D. Johnson Excavating |
Graybeal Construction |
Miller Paving & Const. |
Kansas Heavy Const. |
MEGA Industries Corp. |
Pavers, Inc. |
H. B. Construction, Inc. |
Emery Sapp & Sons,
Inc. |
King's Construction |
VF Anderson Builders |
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
Base Bid - Paths 1, 2, and 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Mobilization |
L.S. |
1 |
$
16,000.00 |
$
16,000.00 |
$
8,850.00 |
$
8,850.00 |
$
7,000.00 |
$
7,000.00 |
$
9,000.00 |
$
9,000.00 |
$
21,000.00 |
$
21,000.00 |
$
64,119.78 |
$
64,119.78 |
$
30,140.00 |
$
30,140.00 |
$
35,000.00 |
$
35,000.00 |
$
23,000.00 |
$
23,000.00 |
$
13,000.00 |
$
13,000.00 |
2 |
Grading and
Compaction of Earthwork |
L.S. |
1 |
$
16,800.00 |
$
16,800.00 |
$
15,952.00 |
$
15,952.00 |
$
33,500.00 |
$
33,500.00 |
$
33,600.00 |
$
33,600.00 |
$
38,000.00 |
$
38,000.00 |
$
14,009.62 |
$
14,009.62 |
$
44,460.00 |
$
44,460.00 |
$
24,000.00 |
$
24,000.00 |
$
70,000.00 |
$
70,000.00 |
$
80,000.00 |
$
80,000.00 |
3 |
Removal of Exist.
Asphalt Path and Related Concrete Pvmt. |
SY |
9309 |
$
3.00 |
$
27,927.00 |
$
1.59 |
$
14,801.31 |
$
5.00 |
$
46,545.00 |
$
2.50 |
$
23,272.50 |
$
2.00 |
$
18,618.00 |
$
3.13 |
$
29,137.17 |
$
3.96 |
$
36,863.64 |
$
2.40 |
$
22,341.60 |
$
2.53 |
$
23,551.77 |
$
6.00 |
$
55,854.00 |
4 |
Fiber Reinforced
Concrete Shared Use Path (6" x 10') |
SY |
12122 |
$
29.25 |
$
354,568.50 |
$
30.15 |
$
365,478.30 |
$
27.45 |
$
332,748.90 |
$
29.90 |
$
362,447.80 |
$
29.00 |
$
351,538.00 |
$
29.54 |
$
358,083.88 |
$
29.00 |
$
351,538.00 |
$
28.50 |
$
345,477.00 |
$
30.44 |
$
368,993.68 |
$
33.00 |
$
400,026.00 |
5 |
Concrete Sidewalk
Ramp (10') |
Ea. |
7 |
$
1,250.00 |
$
8,750.00 |
$
4,522.00 |
$
31,654.00 |
$
1,725.00 |
$
12,075.00 |
$
2,600.00 |
$
18,200.00 |
$
1,650.00 |
$
11,550.00 |
$
1,034.31 |
$
7,240.17 |
$
1,600.00 |
$
11,200.00 |
$
2,400.00 |
$
16,800.00 |
$
1,250.00 |
$
8,750.00 |
$
1,300.00 |
$
9,100.00 |
6 |
Concrete
Sidewalk (4") |
SY |
10 |
$
30.00 |
$
300.00 |
$
91.50 |
$
915.00 |
$
56.25 |
$
562.50 |
$
59.00 |
$
590.00 |
$
53.00 |
$
530.00 |
$
42.84 |
$
428.40 |
$
36.00 |
$
360.00 |
$
47.00 |
$
470.00 |
$
25.00 |
$
250.00 |
$
100.00 |
$
1,000.00 |
7 |
Remove and Replace 9'
x 3.5' Storm Sewer Curb Inlet Top |
Ea. |
1 |
$
2,400.00 |
$
2,400.00 |
$
2,590.00 |
$
2,590.00 |
$
2,405.00 |
$
2,405.00 |
$
2,600.00 |
$
2,600.00 |
$
2,800.00 |
$
2,800.00 |
$
2,281.79 |
$
2,281.79 |
$
2,819.00 |
$
2,819.00 |
$
3,800.00 |
$
3,800.00 |
$
2,200.00 |
$
2,200.00 |
$
2,200.00 |
$
2,200.00 |
8 |
Remove and Replace
10' x 3.5' Storm Sewer Curb Inlet Top |
Ea. |
2 |
$
2,500.00 |
$
5,000.00 |
$
2,620.00 |
$
5,240.00 |
$
2,465.00 |
$
4,930.00 |
$
2,700.00 |
$
5,400.00 |
$
2,950.00 |
$
5,900.00 |
$
2,303.66 |
$
4,607.32 |
$
2,884.00 |
$
5,768.00 |
$
3,900.00 |
$
7,800.00 |
$
2,350.00 |
$
4,700.00 |
$
2,400.00 |
$
4,800.00 |
9 |
Remove and Replace
10' x 4.5' Storm Sewer Curb Inlet Top |
Ea. |
2 |
$
2,600.00 |
$
5,200.00 |
$
2,620.00 |
$
5,240.00 |
$
2,650.00 |
$
5,300.00 |
$
2,800.00 |
$
5,600.00 |
$
3,100.00 |
$
6,200.00 |
$
2,415.67 |
$
4,831.34 |
$
2,956.00 |
$
5,912.00 |
$
3,900.00 |
$
7,800.00 |
$
2,400.00 |
$
4,800.00 |
$
2,500.00 |
$
5,000.00 |
10 |
Remove and Replace
14' x 3.5' Storm Sewer Curb Inlet Top |
Ea. |
6 |
$
3,000.00 |
$
18,000.00 |
$
3,050.00 |
$
18,300.00 |
$
2,780.00 |
$
16,680.00 |
$
2,900.00 |
$
17,400.00 |
$
3,500.00 |
$
21,000.00 |
$
2,756.84 |
$
16,541.04 |
$
3,258.00 |
$
19,548.00 |
$
4,000.00 |
$
24,000.00 |
$
3,500.00 |
$
21,000.00 |
$
2,600.00 |
$
15,600.00 |
11 |
Remove and Replace
15' x 4.5' Storm Sewer Curb Inlet Top |
Ea. |
5 |
$
3,400.00 |
$
17,000.00 |
$
3,100.00 |
$
15,500.00 |
$
3,065.00 |
$
15,325.00 |
$
3,700.00 |
$
18,500.00 |
$
4,000.00 |
$
20,000.00 |
$
3,102.76 |
$
15,513.80 |
$
3,510.00 |
$
17,550.00 |
$
4,200.00 |
$
21,000.00 |
$
3,900.00 |
$
19,500.00 |
$
2,700.00 |
$
13,500.00 |
12 |
Seeding, Fertilizing
and Mulching |
L.S. |
1 |
$
7,000.00 |
$
7,000.00 |
$
4,400.00 |
$
4,400.00 |
$
3,200.00 |
$
3,200.00 |
$
12,500.00 |
$
12,500.00 |
$
4,000.00 |
$
4,000.00 |
$
8,230.01 |
$
8,230.01 |
$
4,620.00 |
$
4,620.00 |
$
21,000.00 |
$
21,000.00 |
$
10,000.00 |
$
10,000.00 |
$
8,000.00 |
$
8,000.00 |
13 |
Traffic Control |
L.S. |
1 |
$
6,000.00 |
$
6,000.00 |
$
2,285.00 |
$
2,285.00 |
$
3,800.00 |
$
3,800.00 |
$
2,200.00 |
$
2,200.00 |
$
6,600.00 |
$
6,600.00 |
$
7,235.19 |
$
7,235.19 |
$
6,254.00 |
$
6,254.00 |
$
9,300.00 |
$
9,300.00 |
$
2,000.00 |
$
2,000.00 |
$
6,300.00 |
$
6,300.00 |
14 |
Construction Staking |
L.S. |
1 |
$
2,500.00 |
$
2,500.00 |
$
0.01 |
$
0.01 |
$
3,895.00 |
$
3,895.00 |
$
500.00 |
$
500.00 |
$
3,600.00 |
$
3,600.00 |
$
3,879.86 |
$
3,879.86 |
$
3,000.00 |
$
3,000.00 |
$
3,400.00 |
$
3,400.00 |
$
1,500.00 |
$
1,500.00 |
$
5,200.00 |
$
5,200.00 |
15 |
Signing (W7-5),
18" x 18" |
Ea. |
2 |
$
200.00 |
$
400.00 |
$
85.00 |
$
170.00 |
$
295.00 |
$
590.00 |
$
200.00 |
$
400.00 |
$
200.00 |
$
400.00 |
$
223.09 |
$
446.18 |
$
286.00 |
$
572.00 |
$
200.00 |
$
400.00 |
$
85.00 |
$
170.00 |
$
500.00 |
$
1,000.00 |
16 |
36" Solid White
Crosswalk Line |
LF |
590 |
$
12.50 |
$
7,375.00 |
$
9.54 |
$
5,628.60 |
$
12.65 |
$
7,463.50 |
$
10.00 |
$
5,900.00 |
$
13.00 |
$
7,670.00 |
$
14.47 |
$
8,537.30 |
$
12.10 |
$
7,139.00 |
$
13.00 |
$
7,670.00 |
$
9.54 |
$
5,628.60 |
$
37.00 |
$
21,830.00 |
17 |
24" Solid White
Stop Line |
LF |
156 |
$
9.50 |
$
1,482.00 |
$
9.54 |
$
1,488.24 |
$
9.20 |
$
1,435.20 |
$
10.00 |
$
1,560.00 |
$
10.00 |
$
1,560.00 |
$
10.85 |
$
1,692.60 |
$
8.80 |
$
1,372.80 |
$
10.00 |
$
1,560.00 |
$
9.54 |
$
1,488.24 |
$
24.00 |
$
3,744.00 |
18 |
Existing Pavement
Marking Removal |
SF |
954 |
$
2.50 |
$
2,385.00 |
$
1.00 |
$
954.00 |
$
2.30 |
$
2,194.20 |
$
1.00 |
$
954.00 |
$
2.00 |
$
1,908.00 |
$
2.41 |
$
2,299.14 |
$
2.20 |
$
2,098.80 |
$
2.00 |
$
1,908.00 |
$
1.00 |
$
954.00 |
$
2.00 |
$
1,908.00 |
Total Base Bid |
|
$
499,087.50 |
|
$
499,446.46 |
|
$
499,649.30 |
|
$
520,624.30 |
|
$
522,874.00 |
|
$
549,114.59 |
|
$
551,215.24 |
|
$
553,726.60 |
|
$
568,486.29 |
|
$
648,062.00 |
|
NOTE: Contract will
be awarded to the lowest "Base Bid" |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
Alternate Bid 'A' |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Mobilization |
L.S. |
1 |
$
6,000.00 |
$
6,000.00 |
$
3,431.00 |
$
3,431.00 |
$
3,000.00 |
$
3,000.00 |
$
2,650.00 |
$
2,650.00 |
$
9,000.00 |
$
9,000.00 |
$
19,787.69 |
$
19,787.69 |
$
15,724.00 |
$
15,724.00 |
$
13,000.00 |
$
13,000.00 |
$
7,750.00 |
$
7,750.00 |
$
8,000.00 |
$
8,000.00 |
2 |
Grading and
Compaction of Earthwork |
L.S. |
1 |
$
7,500.00 |
$
7,500.00 |
$
5,971.00 |
$
5,971.00 |
$
12,349.75 |
$
12,349.75 |
$
14,480.00 |
$
14,480.00 |
$
12,000.00 |
$
12,000.00 |
$
10,286.23 |
$
10,286.23 |
$
19,000.00 |
$
19,000.00 |
$
9,000.00 |
$
9,000.00 |
$
27,500.00 |
$
27,500.00 |
$
47,000.00 |
$
47,000.00 |
3 |
Removal of Exist.
Asphalt Path and Related Concrete Pvmt. |
SY |
3267 |
$
3.40 |
$
11,107.80 |
$
2.20 |
$
7,187.40 |
$
5.00 |
$
16,335.00 |
$
4.00 |
$
13,068.00 |
$
2.00 |
$
6,534.00 |
$
3.26 |
$
10,650.42 |
$
4.25 |
$
13,884.75 |
$
3.25 |
$
10,617.75 |
$
2.75 |
$
8,984.25 |
$
6.00 |
$
19,602.00 |
4 |
Fiber Reinforced
Concrete Shared Use Path (6" x 10') |
SY |
4252 |
$
34.00 |
$
144,568.00 |
$
31.95 |
$
135,851.40 |
$
27.45 |
$
116,717.40 |
$
29.90 |
$
127,134.80 |
$
29.00 |
$
123,308.00 |
$
30.09 |
$
127,942.68 |
$
29.00 |
$
123,308.00 |
$
28.50 |
$
121,182.00 |
$
32.46 |
$
138,019.92 |
$
33.00 |
$
140,316.00 |
5 |
Concrete Sidewalk
Ramp (10') |
Ea. |
6 |
$
1,250.00 |
$
7,500.00 |
$
4,777.00 |
$
28,662.00 |
$
1,725.00 |
$
10,350.00 |
$
2,900.00 |
$
17,400.00 |
$
1,650.00 |
$
9,900.00 |
$
1,036.48 |
$
6,218.88 |
$
1,600.00 |
$
9,600.00 |
$
2,400.00 |
$
14,400.00 |
$
1,250.00 |
$
7,500.00 |
$
1,300.00 |
$
7,800.00 |
6 |
Concrete
Sidewalk (4") |
SY |
5 |
$
30.00 |
$
150.00 |
$
95.75 |
$
478.75 |
$
56.25 |
$
281.25 |
$
60.00 |
$
300.00 |
$
53.00 |
$
265.00 |
$
45.94 |
$
229.70 |
$
50.00 |
$
250.00 |
$
47.00 |
$
235.00 |
$
25.00 |
$
125.00 |
$
100.00 |
$
500.00 |
7 |
Remove and Replace
10' x 3.5' Storm Sewer Curb Inlet Top |
Ea. |
1 |
$
2,500.00 |
$
2,500.00 |
$
2,720.00 |
$
2,720.00 |
$
2,585.00 |
$
2,585.00 |
$
2,700.00 |
$
2,700.00 |
$
2,950.00 |
$
2,950.00 |
$
2,264.63 |
$
2,264.63 |
$
2,884.00 |
$
2,884.00 |
$
3,800.00 |
$
3,800.00 |
$
2,350.00 |
$
2,350.00 |
$
2,400.00 |
$
2,400.00 |
8 |
Remove and Replace
14' x 3.5' Storm Sewer Curb Inlet Top |
Ea. |
7 |
$
3,000.00 |
$
21,000.00 |
$
3,200.00 |
$
22,400.00 |
$
2,780.00 |
$
19,460.00 |
$
3,400.00 |
$
23,800.00 |
$
3,500.00 |
$
24,500.00 |
$
2,818.82 |
$
19,731.74 |
$
3,258.00 |
$
22,806.00 |
$
4,200.00 |
$
29,400.00 |
$
3,550.00 |
$
24,850.00 |
$
2,600.00 |
$
18,200.00 |
9 |
Seeding, Fertilizing
and Mulching |
L.S. |
1 |
$
6,800.00 |
$
6,800.00 |
$
1,540.00 |
$
1,540.00 |
$
2,900.00 |
$
2,900.00 |
$
5,000.00 |
$
5,000.00 |
$
1,500.00 |
$
1,500.00 |
$
2,962.80 |
$
2,962.80 |
$
2,000.00 |
$
2,000.00 |
$
7,300.00 |
$
7,300.00 |
$
3,500.00 |
$
3,500.00 |
$
5,000.00 |
$
5,000.00 |
10 |
Traffic Control |
L.S. |
1 |
$
1,850.00 |
$
1,850.00 |
$
1,025.00 |
$
1,025.00 |
$
1,000.00 |
$
1,000.00 |
$
1,200.00 |
$
1,200.00 |
$
900.00 |
$
900.00 |
$
1,024.98 |
$
1,024.98 |
$
1,908.00 |
$
1,908.00 |
$
2,700.00 |
$
2,700.00 |
$
1,025.00 |
$
1,025.00 |
$
4,000.00 |
$
4,000.00 |
11 |
Construction Staking |
L.S. |
1 |
$
3,000.00 |
$
3,000.00 |
$
0.01 |
$
0.01 |
$
1,500.00 |
$
1,500.00 |
$
200.00 |
$
200.00 |
$
1,400.00 |
$
1,400.00 |
$
1,493.16 |
$
1,493.16 |
$
2,000.00 |
$
2,000.00 |
$
1,300.00 |
$
1,300.00 |
$
2,500.00 |
$
2,500.00 |
$
4,000.00 |
$
4,000.00 |
12 |
36" Solid White
Crosswalk Line |
LF |
359 |
$
12.50 |
$
4,487.50 |
$
9.54 |
$
3,424.86 |
$
13.80 |
$
4,954.20 |
$
10.00 |
$
3,590.00 |
$
13.00 |
$
4,667.00 |
$
14.47 |
$
5,194.73 |
$
13.20 |
$
4,738.80 |
$
13.00 |
$
4,667.00 |
$
9.54 |
$
3,424.86 |
$
37.00 |
$
13,283.00 |
13 |
24" Solid White
Stop Line |
LF |
96 |
$
9.50 |
$
912.00 |
$
9.54 |
$
915.84 |
$
9.20 |
$
883.20 |
$
10.00 |
$
960.00 |
$
10.00 |
$
960.00 |
$
10.85 |
$
1,041.60 |
$
8.80 |
$
844.80 |
$
10.00 |
$
960.00 |
$
9.54 |
$
915.84 |
$
24.00 |
$
2,304.00 |
14 |
Existing Pavement
Marking Removal |
SF |
806 |
$
2.50 |
$
2,015.00 |
$
1.00 |
$
806.00 |
$
3.20 |
$
2,579.20 |
$
1.00 |
$
806.00 |
$
2.00 |
$
1,612.00 |
$
2.41 |
$
1,942.46 |
$
2.20 |
$
1,773.20 |
$
2.00 |
$
1,612.00 |
$
1.00 |
$
806.00 |
$
2.00 |
$
1,612.00 |
Total Alternate Bid 'A' Section |
|
$
219,390.30 |
|
$
214,413.26 |
|
$
194,895.00 |
|
$
213,288.80 |
|
$
199,496.00 |
|
$
210,771.70 |
|
$
220,721.55 |
|
$
220,173.75 |
|
$
229,250.87 |
|
$
274,017.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
Alternate Bid 'B' |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Mobilization |
L.S. |
1 |
$
3,000.00 |
$
3,000.00 |
$
3,266.25 |
$
3,266.25 |
$
3,700.00 |
$
3,700.00 |
$
1,930.00 |
$
1,930.00 |
$
6,000.00 |
$
6,000.00 |
$
17,172.69 |
$
17,172.69 |
$
7,270.00 |
$
7,270.00 |
$
13,000.00 |
$
13,000.00 |
$
5,000.00 |
$
5,000.00 |
$
6,000.00 |
$
6,000.00 |
2 |
Grading and
Compaction of Earthwork |
L.S. |
1 |
$
5,000.00 |
$
5,000.00 |
$
3,611.00 |
$
3,611.00 |
$
9,000.00 |
$
9,000.00 |
$
9,630.00 |
$
9,630.00 |
$
8,000.00 |
$
8,000.00 |
$
3,156.79 |
$
3,156.79 |
$
10,415.00 |
$
10,415.00 |
$
5,500.00 |
$
5,500.00 |
$
20,000.00 |
$
20,000.00 |
$
32,000.00 |
$
32,000.00 |
3 |
Removal of Exist.
Asphalt Path and Related Concrete Pvmt. |
SY |
2221 |
$
3.40 |
$
7,551.40 |
$
1.60 |
$
3,553.60 |
$
5.00 |
$
11,105.00 |
$
4.10 |
$
9,106.10 |
$
2.00 |
$
4,442.00 |
$
3.23 |
$
7,173.83 |
$
4.25 |
$
9,439.25 |
$
2.10 |
$
4,664.10 |
$
2.93 |
$
6,507.53 |
$
6.00 |
$
13,326.00 |
4 |
Fiber Reinforced
Concrete Shared Use Path (6" x 10') |
SY |
2823 |
$
34.00 |
$
95,982.00 |
$
31.95 |
$
90,194.85 |
$
27.45 |
$
77,491.35 |
$
29.90 |
$
84,407.70 |
$
29.00 |
$
81,867.00 |
$
30.20 |
$
85,254.60 |
$
29.00 |
$
81,867.00 |
$
28.50 |
$
80,455.50 |
$
31.25 |
$
88,218.75 |
$
33.00 |
$
93,159.00 |
5 |
Concrete Sidewalk
Ramp (10') |
Ea. |
5 |
$
1,250.00 |
$
6,250.00 |
$
4,777.00 |
$
23,885.00 |
$
1,725.00 |
$
8,625.00 |
$
3,200.00 |
$
16,000.00 |
$
1,650.00 |
$
8,250.00 |
$
1,033.80 |
$
5,169.00 |
$
1,600.00 |
$
8,000.00 |
$
2,400.00 |
$
12,000.00 |
$
1,250.00 |
$
6,250.00 |
$
1,300.00 |
$
6,500.00 |
6 |
Concrete
Sidewalk (4") |
SY |
5 |
$
30.00 |
$
150.00 |
$
95.75 |
$
478.75 |
$
56.25 |
$
281.25 |
$
60.00 |
$
300.00 |
$
53.00 |
$
265.00 |
$
45.94 |
$
229.70 |
$
50.00 |
$
250.00 |
$
47.00 |
$
235.00 |
$
25.00 |
$
125.00 |
$
100.00 |
$
500.00 |
7 |
Modify Existing
Median Nose |
L.S. |
1 |
$
2,500.00 |
$
2,500.00 |
$
1,922.00 |
$
1,922.00 |
$
1,075.00 |
$
1,075.00 |
$
3,400.00 |
$
3,400.00 |
$
1,100.00 |
$
1,100.00 |
$
1,660.47 |
$
1,660.47 |
$
1,500.00 |
$
1,500.00 |
$
5,100.00 |
$
5,100.00 |
$
3,000.00 |
$
3,000.00 |
$
2,000.00 |
$
2,000.00 |
8 |
Remove and Replace 9'
x 3' Storm Sewer Curb Inlet Top |
Ea. |
2 |
$
2,300.00 |
$
4,600.00 |
$
2,710.00 |
$
5,420.00 |
$
2,345.00 |
$
4,690.00 |
$
2,600.00 |
$
5,200.00 |
$
2,750.00 |
$
5,500.00 |
$
2,192.27 |
$
4,384.54 |
$
2,819.00 |
$
5,638.00 |
$
4,000.00 |
$
8,000.00 |
$
2,150.00 |
$
4,300.00 |
$
2,200.00 |
$
4,400.00 |
9 |
Remove and Replace
14' x 3' Storm Sewer Curb Inlet Top |
Ea. |
4 |
$
2,900.00 |
$
11,600.00 |
$
3,200.00 |
$
12,800.00 |
$
2,750.00 |
$
11,000.00 |
$
3,400.00 |
$
13,600.00 |
$
3,500.00 |
$
14,000.00 |
$
2,744.69 |
$
10,978.76 |
$
3,258.00 |
$
13,032.00 |
$
4,100.00 |
$
16,400.00 |
$
3,400.00 |
$
13,600.00 |
$
2,600.00 |
$
10,400.00 |
10 |
Seeding, Fertilizing
and Mulching |
L.S. |
1 |
$
2,500.00 |
$
2,500.00 |
$
1,540.00 |
$
1,540.00 |
$
3,000.00 |
$
3,000.00 |
$
3,000.00 |
$
3,000.00 |
$
1,000.00 |
$
1,000.00 |
$
1,975.20 |
$
1,975.20 |
$
2,000.00 |
$
2,000.00 |
$
5,000.00 |
$
5,000.00 |
$
3,000.00 |
$
3,000.00 |
$
4,000.00 |
$
4,000.00 |
11 |
Traffic Control |
L.S. |
1 |
$
1,750.00 |
$
1,750.00 |
$
1,025.00 |
$
1,025.00 |
$
1,000.00 |
$
1,000.00 |
$
1,200.00 |
$
1,200.00 |
$
800.00 |
$
800.00 |
$
904.39 |
$
904.39 |
$
1,908.00 |
$
1,908.00 |
$
2,600.00 |
$
2,600.00 |
$
1,025.00 |
$
1,025.00 |
$
4,000.00 |
$
4,000.00 |
12 |
Construction Staking |
L.S. |
1 |
$
1,750.00 |
$
1,750.00 |
$
0.01 |
$
0.01 |
$
1,100.00 |
$
1,100.00 |
$
200.00 |
$
200.00 |
$
1,000.00 |
$
1,000.00 |
$
1,081.66 |
$
1,081.66 |
$
2,000.00 |
$
2,000.00 |
$
1,000.00 |
$
1,000.00 |
$
500.00 |
$
500.00 |
$
3,000.00 |
$
3,000.00 |
13 |
36" Solid White Crosswalk Line |
LF |
479 |
$
12.50 |
$
5,987.50 |
$
9.54 |
$
4,569.66 |
$
13.80 |
$
6,610.20 |
$
10.00 |
$
4,790.00 |
$
13.00 |
$
6,227.00 |
$
14.47 |
$
6,931.13 |
$
13.20 |
$
6,322.80 |
$
13.00 |
$
6,227.00 |
$
9.54 |
$
4,569.66 |
$
37.00 |
$
17,723.00 |
14 |
24" Solid White
Stop Line |
LF |
110 |
$
9.50 |
$
1,045.00 |
$
9.54 |
$
1,049.40 |
$
9.20 |
$
1,012.00 |
$
10.00 |
$
1,100.00 |
$
10.00 |
$
1,100.00 |
$
10.85 |
$
1,193.50 |
$
8.80 |
$
968.00 |
$
10.00 |
$
1,100.00 |
$
9.54 |
$
1,049.40 |
$
24.00 |
$
2,640.00 |
15 |
Existing Pavement
Marking Removal |
SF |
20 |
$
2.00 |
$
40.00 |
$
1.00 |
$
20.00 |
$
13.00 |
$
260.00 |
$
1.00 |
$
20.00 |
$
2.00 |
$
40.00 |
$
2.41 |
$
48.20 |
$
2.20 |
$
44.00 |
$
2.00 |
$
40.00 |
$
1.00 |
$
20.00 |
$
2.00 |
$
40.00 |
Total Alternate Bid 'B' Section |
|
$
149,705.90 |
|
$
153,335.52 |
|
$
139,949.80 |
|
$
153,883.80 |
|
$
139,591.00 |
|
$
147,314.46 |
|
$
150,654.05 |
|
$
161,321.60 |
|
$
157,165.34 |
|
$
199,688.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|