Memorandum
City of Lawrence
Public Works
TO: |
David L. Corliss, City Manager |
FROM: |
David P. Cronin, P.E., Project Engineer |
CC: |
Cynthia Boecker, Diane Stoddard, Chuck Soules, Shoeb Uddin |
Date: |
November 4, 2009 |
RE: |
Clinton Parkway Shared-Use Path Set Bid Date |
Please include the following item on the City Commission Regular Agenda for consideration at the November 10, 2009 meeting.
Project Description
This project consists of a 10 ft wide concrete path for pedestrian and bicyclists extending along the south side of Clinton Parkway from Inverness to K-10 and along the north side of Clinton Parkway from K-10 to Lake Pointe Drive. The concrete path will replace the existing 6 foot wide asphalt sidewalk, constructed in 1970, which is severely cracked and broken. Two additional sections: north side of Clinton Parkway from Inverness to Kasold and north side of Clinton Parkway from Hartford to Inverness will be bid as alternates, to be considered if low base bid is under KDOT’s award amount.
Project History
Clinton Parkway Shared-Use path project was selected by the Kansas Department of Transportation for Transportation Enhancement (TE) funding under the American Recovery and Reinvestment Act (ARRA). The award amount is fixed at $800,750.00
Project Funding
The project is a reimbursable grant paid up front by the city and reimbursed 100% by KDOT with no city funds up to the award amount of $800,750.00. The project cost does not include the cost of engineering design or construction engineering services. Public Works staff is designing the project in-house and will be providing construction inspection. No property acquisition is required.
Project Status / Schedule
Advertise for Bids: November 13, 2009
Open Bids: December 15, 2009
Award Contract: December 29, 2009
Construction: Spring 2010
Action Request
Set a bid date of December 15, 2009 for PW0914, Clinton Parkway Shared-Use Paths.