NOTICE:

APPLICATIONS DUE

August 1, 2009

 
KLINK RESURFACING PROJECT OF STATE HIGHWAY         

CITY CONNECTING LINKS*

                            APPLICATION FORM     FISCAL YEAR 2012

 

DATE: July 9, 2009                   

 

CITY: __Lawrence________________COUNTY:  __Douglas        __POPULATION: __88,000      

                                                   

HIGHWAY ROUTE: ____US-59                         LENGTH: ___4,500 feet                       

 

PROJECT LOCATION: ____Iowa Street (US-59), Yale Road to Irving Hill Road Overpass  

 

                                                                                                                                               

 

TYPE OF WORK (Milling, Overlay, etc.): Mill and overlay,  joint repair,  full depth pavement_

 

 removal and  replacement,  curb and gutter replacement, etc.      __________________________

                                                                                                               

                                                                  Current

COST ESTIMATE:                                                2009 Cost

 

Construction Cost:                                                 $  603,900                          Charles F. Soules, P.E.                       

                                                                                                                                   (Applicant’s Contact Person)

               

Construction. Engineering (-0-)                            $    35,000                          Director of Public Works                   

                                                                                                                                                (Title)

                                                                                                                                                  

2008 TOTAL PROJECT COST:                          $  638,900                          P. O. Box 708                                      

 

 

Inflation Factor                                                          X 1.164                           Lawrence, Kansas 66044                 

                                                                                                                                            (Mailing Address)

                                                                               

2011 TOTAL PROJECT COST:                        $  743,680                           csoules@ci.lawrence.ks.us                

                                                                                                                                             (E-Mail Address)

 

TOTAL REQUESTED FROM STATE:          $  200,000                              (785) 832-3124                                   

                                                                                                                                                (Phone Number)

                                                                                                                                                               

BALANCE (CITY’S SHARE):                           $  543,680                           ____________________________

                                                                                                                                         (Applicant’s Signature)

 

 

* A City Connecting Link is that part of the State Highway System that is within the city limits.  It is not a    local roadway that intersects with or leads to the state highway.

                                                                                                                               

Has this project been reviewed by the KDOT District or Area Engineer     (X) Yes  (   ) No

 

We understand that if the project is approved, the Kansas Department of Transportation will participate in the cost of construction and construction engineering at the rate of 75 percent for cities with a population less than 10,000 or 50 percent for cities with a population of 10,000 or greater, not to exceed $200,000 of state funds.  The City will be responsible for letting the contract for bids and supervising construction.

 

                                                                Send Request to:  Melinda Desch, P.E.

                                                                                                KDOT – Bureau of Program & Project Management

                                                                                                Eisenhower State Office Building

                                                                                                700 SW Harrison, 2nd Floor Tower

                                                                                                Topeka, Kansas  66603-3754