Memorandum

City of Lawrence

Utilities Department

 

TO:

David L. Corliss – City Manager

Cynthia Boecker - Assistant City Manager

Diane Stoddard - Assistant City Manager

FROM:

John Shutak – Utilities Engineer

CC:

Dave Wagner – Director of Utilities

Philip Ciesielski – Asst. Director of Utilities

Mike Lawless – Asst. Director of Utilities

Beth Frailey Krishtalka – Management Analyst

Mark Hegeman – Water Systems Manager

Date:

June 30, 2009

RE:

July 07, 2009 Agenda Item – Negotiate a Design and Construction Phase Engineering Services Agreement for project UT0905CS, sanitary sewer main replacement for the 1100 block of Delaware Street and the 1500 block New Hampshire Street.

 

Please include the following item on the City Commission Agenda for consideration at the July 07, 2009 meeting:

Authorize Staff to negotiate an Engineering Services Agreement for Design and Construction Phase Engineering Services for project UT0905CS, sanitary sewer main replacement for the 1100 block of Delaware Street and the 1500 block of New Hampshire Street.

Project Description

The City budgets a yearly fund for the ongoing maintenance, repair, and, when necessary, replacement of existing sanitary sewer mains within the collection system.

 

Project Status/Details

Department of Utilities staff continuously evaluates the condition of the wastewater collection system as part of the regular maintenance program. Based on efforts to perform video inspection of the existing lines servicing the 1100 block of Delaware Street and the 1500 block of New Hampshire Street, it has become apparent that the sanitary sewer lines are in a deteriorated state and require replacement.

 

The existing sewer lines servicing both the 1100 block of Delaware Street and the 1500 block of New Hampshire consist of 6 inch diameter vitrified clay pipe and have been in service for over 70 years.

 

Staff prepared a Request for Proposals for Design and Construction Phase Engineering Services related to the replacement of approximately 890 linear feet of  sanitary sewer line servicing the 1100 block of Delaware Street and approximately 670 linear feet of sanitary sewer line servicing the 1500 block of New Hampshire Street as identified on the attached maps. Actual project scopes, budgets and schedules will be determined as part of the requested engineering services.

 

Per the City Commission’s May 19, 2009 authorization Staff advertised the RFP on May 21, 2009 via demand star online service and direct mailing. Responses were due June 9, 2009. Four (4) proposals were received in response to the RFP advertisement. Proposals were received from BG Consultants; Delich, Roth, and Goodwillie; Peridian Group; and SK Designs.

 

A review committee consisting of Department of Utilities staff evaluated the proposals. Staff consistently ranked BG Consultants as the highest qualified respondent for the project. As indicated in the RFP the following criteria were used to rate the responses:

 

·         Project knowledge & approach

·         Project qualifications and experience

·         Key staff and experience

·         Related local experience with the Utilities Department

·         Project schedule

 

Each firm also provided a schedule of hourly rates with their proposal for reference. Staff is proposing to contract for the design and construction phase engineering services.

 

Project Funding: 

Design for the above referenced projects will be funded out of the 2009 Department of Utilities non-bonded construction fund. Construction is anticipated to begin in 2010 and will be funded from the Department of Utilities Capital Improvement Project construction fund.

Action Request:  Authorize Staff to negotiate an Engineering Services Agreement for design and construction phase engineering services for project UT0905CS, sanitary sewer main replacement for the 1100 block of Delaware Street and the 1500 block of New Hampshire Street.

Thank you for your assistance.  Please advise if you have any questions.