City Hall Executive Summary 2009 6 East 6th Street |
Description
Exterior is brick. Interior is sheetrock and metal studs. 154 feet long and 82 feet high. 36,000 sq. ft.
Year Constructed
Current Appraised Value
Condition Report
1997
· Remodeled planning offices, incorporating the Mayors office, $24,600.00
· Waterproofing and tuck-pointing the exterior of City Hall, $47,000.00
1999
· Replaced the rooftop units, installed DDC control system, upgraded the electrical system to support improvements to the HVAC system
· Replaced roof with white reflective membrane, $62,709.00., Boone Brothers 12 yr. warranty
· Restroom renovations on 3rd and 4th floor $51,280.00., B.A. Green construction
· City commission room remodeled $52,032.00
2000
· Remodeled Personnel Department on 2nd Floor, $38,000.00
· Remodeled 1st and 2nd floor restrooms, $56,886.00
· Phase 2 HVAC renovations: VAV, ductwork and electrical upgrades for $256,282.00
2001
· Remodeled ground floor restrooms, $32,051.00
· Phase 3 HVAC renovations: VAV, ductwork and electrical, including lighting upgrades for ground floor; electrical upgrades 2nd floor, $248,960.00
2002
· Phase 4 A/C renovation/replacement of 1st floor VAV system including ductwork, installation of DDS controls, and extension of building electrical including lighting system to support changes, $153,900.00
· Upgrade City Commission room lighting for an 80% reduction in energy consumption
2005
· Phase 5 A/C renovation/replacement of 4th floor VAV system including ductwork, installation of DDC controls, extension of building electrical including lighting system to support changes, $320,000.00
2008
· Started the installation of occupancy sensors in offices, restrooms and meeting rooms
Energy Conservation Efforts
· Replaced roof top units, incorporated variable speed drives, multi-phase project, 1999-2004
· Replaced pneumatic controls with computer operated system to give better control of energy usage, 2004
· Replaced fluorescent F-40 lighting with electronic T-8 ballasts and bulbs
· Replaced lighting in City Commission room with energy efficient lighting saving approximately 80 percent energy, 2003
· Using recycled content carpet
· Installed reflective material on windows, 2001
· Set temperature controls for building at 68 in the winter and 78 in the summer
· In the process of replacing operable windows in City Hall with weather double pane low E argon gas filled windows
· Installing motion and infrared detectors for lighting controls
· Set up recycling center on ground floor for: white paper, mixed paper, newspapers, magazines, plastic, and glass
Needed Improvements
· Additional storage space
Needed Energy Efficiency Projects
· Replacement of all windows
· Replace atrium windows
· Roller blinds in atrium
Energy Costs History
|
2007 |
2008 |
Gas |
$1,497.53 |
$3,462.79 |
Sq. ft. |
00.04 |
00.10 |
Electric |
$52,698.62 |
$57,638.60 |
Sq. ft. |
01.46 |
01.60 |
Heating degree days |
6949 |
5770 |
Cooling degree days |
1701 |
1173 |
Natural Gas Usage |
||||||||||||
|
Jan |
Feb |
Mar |
April |
May |
June |
July |
August |
Sept |
Oct |
Nov |
Dec |
2007 |
130 |
210 |
85 |
76 |
54 |
58 |
59 |
0 |
112 |
91 |
91 |
221 |
2008 |
236 |
548 |
536 |
340 |
97 |
71 |
51 |
51 |
63 |
113 |
164 |
797 |
Electricity Usage |
||||||||||||
|
Jan |
Feb |
March |
April |
May |
June |
July |
Aug |
Sept |
Oct |
Nov |
Dec |
2007 |
85600 |
92200 |
67000 |
75600 |
75000 |
79800 |
90800 |
88200 |
44600 |
63000 |
78000 |
61200 |
2008 |
125200 |
79600 |
72000 |
65800 |
54500 |
64200 |
74400 |
68200 |
64600 |
62000 |
62600 |
92800 |