Lawrence Municipal Airport is a general aviation facility located approximately three miles north of the central business district of Lawrence, Kansas. It is about one mile east of the Kansas River and one mile north of Interstate 70. Access to the airport is via U.S. Highway 24/40. The airport currently has approximately 85 based aircraft, two of which are business jets and six are multi-engine. Approximately 40,000 total annual aircraft operations occur at the airport. The airport currently has two paved runways. Primary Runway 15-33 is 5,700 feet long and 100 feet wide. It is served by a Category I precision instrument landing system (ILS) and medium intensity approach lighting system with runway alignment indicator lights (MALSR) on Runway 33. Secondary Runway 1-19 is 3,900 feet long and 75 feet wide. It has only visual approaches. The runways are served by taxiway systems leading to aircraft parking areas and the airport building area. To accommodate current and projected aviation demand in the Lawrence Municipal Airport’s service area and upgrade the facility to current FAA design standards, the following Capital Improvements Plan is recommended

Text Box: Sponsor Signature: 	Date: 
COST ESTIMATE: 	
2009 	Acquire Land for Approaches		250,000
2010	Airport Master Plan Update		150,000
2011	Taxiway 1/19 Expansion/Completion (NE)		412,250 
2012	Install REILS for Runway 15 and Wind Cones for Runway 15-33		65,000
2012	Install Airport Signage for Part 139 and Jet Operations		135,000
2013	Rehabilitate Runway 15/33		2,000,000
2014	East Apron Expansion Phase I (20,000 S.Y. +/-)		2,310,000
2015	Equipment Storage Building, SRE and ARFF Equipment		715,000
2016	East April Expansion, Phase II (15,000 S/Y. +/-)		1,910,000
2016	Environmental Assessment for Runway Extension		75,000
2017	Extend Runway 15-33 (400’ x 100’) and Taxiway A (400’ x 35’)		2,750,000
Future	Expand Aircraft Parking Apron (Phase III) (15,000 S.Y.)		1,925,000
Future	Install Airport Perimeter/Security Fencing		600,000