Economic Recovery
Package |
|
|
|
|
|
|
|
|
|
|
|
|
Projects
for Lawrence, Kansas |
|
|
|
|
|
|
|
|
Projects
That Could Be Ready for Construction Bid Letting Within 30 Days |
|
|
|
|
Type |
Sponsor |
Name |
Location |
Description |
Costs (1,000) |
Federal Funds |
Federal Source |
State Funds |
Local Funds |
Source Document(s) |
In the TIP |
In the MTP |
ERP Eligible |
Comments |
Road |
Lawrence |
N 2nd Street |
North 2nd & Locust |
Intersection Improvements - grading, surfacing |
4,000 |
3,000 |
FHWA-STP |
|
1,000 |
5-Year Plan |
Y |
N |
Y |
|
Airport |
Lawrence |
Taxiway Extension |
Taxiway D |
Extension of Taxiway |
450 |
|
PW Director |
|
|
Airport |
Lawrence |
Site Improvements |
Hangar Area |
Site improvements to provide access to new hangars |
750 |
|
PW Director |
|
|
Building |
Lawrence |
Carnegie Library |
9th & Vermont - Downtown Lawrence |
Rehabilitation and Addition |
1,400 |
98 |
|
Historic Resources Administrator |
|
|
|
|
|
|
Subtotal
for Projects for Construction Bid Letting Now |
|
6,600 |
3,098 |
|
0 |
1,000 |
|
|
|
|
|
|
Projects
That Could Be Ready for Construction Bid Letting Within 90 Days |
|
|
|
|
Type |
Sponsor |
Name |
Location |
Description |
Costs (1,000) |
Federal Funds |
Federal Source |
State Funds |
Local Funds |
Source Document(s) |
|
Comments |
Road |
Lawrence |
US 40/6th St. Center Turn Lane |
Hy-Vee to Folks Road |
Widen for Center Turn Lane |
750 |
750 |
|
Geometric Improvement |
N |
N |
Y |
|
Road |
Lawrence |
9th & Avalon |
|
Widen For Center Turn Lane |
500 |
500 |
|
Safety |
N |
N |
Y |
|
Road |
Lawrence |
25th & Iowa |
|
Provide Left-Turn Lane on 25th Street |
500 |
500 |
|
Safety |
N |
Y-specific |
Y |
|
Transit |
Lawrence |
Fleet Replacement |
Various Locations |
5 new buses |
1,600 |
|
FTA |
|
Transit Administrator |
Y |
Y-general |
Y |
|
Transit |
Lawrence |
Shelters |
|
Install bus shelters along major routes-ADA accessible |
500 |
|
Transit/ADA |
|
|
Energy |
Lawrence |
City Hall |
|
Replace Windows |
300 |
|
Energy efficiency &
renewable energy |
|
|
Energy |
Lawrence |
Senior Center |
|
Replace Heating System |
100 |
|
Energy efficiency & renewable energy |
|
|
FEMA/Homeland
Security |
Emergency Management Communications |
PW/Police/Fire |
Replace radio system for emergency management communication |
2,000 |
|
Emergency Preparedness |
|
|
|
|
|
|
Subtotal
for Projects Ready for Construction Bid Letting within 90 Days |
|
6,250 |
1,750 |
|
0 |
0 |
|
|
|
|
|
|
|
Projects
That Could Be Ready for Construction Bid Letting Within 180 Days |
|
|
|
|
Type |
Sponsor |
Name |
Location |
Description |
Costs (1,000) |
Federal Funds |
Federal Source |
State Funds |
Local Funds |
Source Document(s) |
|
Comments |
Road |
Lawrence |
Kasold Drive |
Clinton Parkway (23rd) to 31st Street |
Reconstruction - ped/bike facilities, grading, surfacing |
6,600 |
1,000 |
FHWA-STP |
|
5,600 |
5-Year Plan |
Y |
N |
Y |
|
Road |
Lawrence |
Wakarusa Drive |
Bob Billings Parkway (15th) to 18th Street |
Reconstruction - widening, sidewalks, grading, surfacing |
3,000 |
1,000 |
FHWA-STP |
|
2,000 |
5-Year Plan |
Y |
N |
Y |
|
Road |
Lawrence |
Kasold Drive |
Harvard Street to Bob Billings Parkway |
Reconstruction - multi-modal facilities, grading, surfacing |
3,900 |
1,000 |
FHWA-STP |
|
2,900 |
5-Year Plan |
Y |
N |
Y |
|
Road |
Lawrence |
19th Street |
Iowa Street to Naismith Drive |
Reconstruction - widening, bike lanes, grading, surfacing |
3,124 |
1,000 |
FHWA-STP |
|
2,124 |
5-Year Plan |
Y |
N |
Y |
|
Road |
Lawrence |
ITS & Traffic Center |
6th Street, Iowa Street, other arterials |
ITS improvements along arterial streets and traffic center |
3,000 |
|
City Engineer |
N |
Y-general |
Y |
|
Road |
Lawrence |
Brick Street |
Ohio Street, 8th & 9th Street |
Construct Brick Street |
500 |
500 |
FHWA-TE |
|
|
N |
N |
Y |
|
Road |
Lawrence |
Iowa (US-59) |
15th & 9th Street Center
Turn Lane |
|
1,000 |
1,000 |
FHWA |
|
|
N |
Y-specific |
Y |
|
|
|
|
|
Transit |
Lawrence |
Bus
Cut-Outs |
Various Locations |
Areas for buses to pull out of
traffic to board riders |
3,000 |
|
FTA |
|
T-LINK resolution |
N |
Y-illustrative |
Y |
|
Trail |
Lawrence |
Burroughs Creek |
11th to 23rd Street |
Rail-Trail Construction |
846 |
500 |
FHWA-TE |
|
346 |
TIP |
Y |
Y-general |
Y |
|
Sidewalks |
Lawrence |
Sidewalk Gaps |
Arterial and Collector Streets |
Construction of missing sidewalk sections on major roads |
500 |
|
PW Director |
N |
Y-general |
Y |
|
Sewer Pump
Station |
Lawrence Utilities Dept. |
Pump Station 25 Upgrade |
East Hill Business Park north of
Greenway Circle |
Reconstruct PS & force main
to a capacity of 6.0 MGD |
3,400 |
|
3,400 |
Water & Sewer CIP |
|
|
Sewer
System Storage |
Lawrence Utilities Dept. |
Four Seasons Wet Weather
Storage` |
Four Seasons Pump Station west
of 31st & Kasold |
Construct an additional 2.5 MG
storage basin |
3,500 |
|
3,500 |
Water & Sewer CIP |
|
|
Sewer
System |
Lawrence Utilities Dept. |
2009 Cured-In-Place-Pipe (CIPP) |
Various locations throughout
City |
Rehabilitation
of approximately 40,000 feet of sanitary sewer mains identified for
rehabilitation due to age of pipe, pipe material, pipe defects based on
maintenance and TV inspection records and presence of unused taps or
connections that may contribute inflow/infiltration. |
1,000 |
|
1,000 |
Water & Sewer CIP |
|
|
Energy |
Lawrence |
CNG Fuel Station & Bus
Purchase |
West 40 on Wakarusa |
Construction of CNG Station and
purchase of buses to use CNG |
3,000 |
|
Energy efficiency &
renewable energy |
|
|
Energy |
Lawrence |
Hybrid Roll-Off |
Public Works |
Purchase hybrid roll-off for
Sanitation |
300 |
|
Energy efficiency &
renewable energy |
|
|
Energy |
Lawrence |
Aerial Bucket Truck |
Public Works |
Purchase aerial bucket truck for
Traffic |
300 |
|
Energy efficiency &
renewable energy |
|
|
EPA |
Lawrence |
Diesel Emission Filter |
Public Works |
Diesel emission filter traps for
construction equipment |
30 |
|
Diesel Emissions Reduction Act |
|
|
|
|
|
|
Subtotal
for Projects Ready for Construction Bid Letting within 180 Days |
|
37,000 |
6,000 |
|
0 |
20,870 |
|
|
|
|
|
|
|
|
|
|
|
Projects
That Could Be Ready for Construction Bid Letting Within One Year |
|
|
|
|
Type |
Sponsor |
Name |
Location |
Description |
Costs (1,000) |
Federal Funds |
Federal Source |
State Funds |
Local Funds |
Source Document(s) |
|
Comments |
Road |
Lawrence |
31st Street |
Haskell Avenue to O'Connell Road |
Roadway Extension - grading, surfacing |
7,200 |
792 |
FHWA-STP |
|
5-Year Plan |
Y-needs revisions |
Y-illustrative |
Y |
Construction
funding now scheduled for 2013 and not in TIP yet |
Road |
Lawrence |
Iowa Street |
9th, Harvard, 15th, 23rd Street Intersections |
Intersection Improvements and Medians |
6,000 |
|
T-LINK Resolution |
N |
Y-specific |
Y |
|
Road |
KDOT |
15th/K-10 Interchange |
Highway K-10 and 15th Street in Lawrence |
Interchange K-10 and 15th Street west edge of Lawrence |
10,000 |
|
KDOT List |
N |
N |
Y |
|
Road |
Lawrence |
K-10 |
Franklin Road - East Hills
Business Park |
Safety
Improvements |
4,500 |
|
FHWA |
|
T-LINK Resolution |
N |
N |
Y |
|
Bridge |
Lawrence |
K-10 |
BNSF RR near Haskell Avenue |
Bridge Replacement |
8,000 |
|
T-LINK Resolution |
Y |
Y-general |
Y |
|
Transit |
Lawrence |
Maintenance Facility |
Unknown |
Bus Repair and Maintenance Garage and Storage Area |
5,000 |
|
FTA |
|
T-LINK Resolution |
N |
Y-illustrative |
Y |
|
Storm water |
CORPS |
5th & Maple Pump Station |
5th Street and Maple Street |
Relieve flooding issues |
5,317 |
|
CORPS Flood Relief/Construction |
|
|
Storm water |
CORPS |
23rd & Ousdahl Rd |
23rd Street & Ousdahl Road |
Relieve flooding issues |
1,928 |
|
CORPS Flood Relief/Construction |
|
|
Storm water |
CORPS |
Alabama, 17th to Naismith |
Alabama, 17th to Naismith Drive |
Relieve flooding issues |
4,833 |
|
CORPS Flood Relief/Construction |
|
|
Storm water |
CORPS |
Maple Lane, 19th to Brook |
Maple Lane, 19th Street to Brook Street |
Relieve flooding issues |
2,037 |
|
CORPS Flood Relief/Construction |
|
|
Sewer
Treatment |
Lawrence Utilities Dept. |
WWTP Anaerobic Digester |
1400 East 8th Street |
Converting an existing solids
storage tank into a third anaerobic digester vessel and modifying the gas
control building/equipment to allow for additional energy recovery in the
form of digester gas. |
5,000 |
|
5,000 |
Water & Sewer CIP |
|
|
Sewer |
Lawrence |
Airport |
|
Sanitary Sewer extension to airport |
2,000 |
|
Economic Development |
|
|
Water
System |
Lawrence Utilities Dept. |
SE Area Transmission Main Phase
I |
Kaw WTP across Kansas River to
North Lawrence |
New water transmission main from
the Kaw WTP to the southeast area of the City at approximately 23rd and O’Connell. Phase I
ends in North Lawrence. |
7,300 |
|
1,137 |
Water & Sewer CIP |
|
|
Water
System |
Lawrence Utilities Dept. |
2008-2009 Water Line Replacement |
Various locations throughout
City |
Approximately 17,000 feet of
water line identified for replacement within the distribution system. The
water lines are evaluated and selected based on main breaks, pipe material
and age, capacity, fire protection needs, the criticality of the water line within
the system and the number of services affected. |
2,000 |
|
2,000 |
Water & Sewer CIP |
|
|
Water
System |
Lawrence Utilities Dept. |
Large Valve Replacement |
Various locations throughout
City |
Repair and/or replace large
valves on the water transmission main system. These valves have been
identified through the valve exercising program and are based on operating
condition, age, type of valve and criticality of the main in the transmission
system. |
450 |
|
450 |
Water & Sewer CIP |
|
|
Energy |
Lawrence |
CM; FS#3; ITC Facility |
|
Radiant heat & make-up air; sleeping dorms; replace RTU's |
150 |
|
Energy Efficiency |
|
|
Energy |
Lawrence |
Police Station (ITC) |
|
25 Ton Split System |
110 |
|
Energy Efficiency |
|
|
Energy |
Lawrence |
Fire Station #1 |
|
Mechanical system upgrade, phase 1 |
250 |
|
Energy Efficiency |
|
|
Energy |
Lawrence |
ITC Facility |
|
Lower level reheat boxes, phase 4 |
175 |
|
Energy Efficiency |
|
|
Energy |
Lawrence |
Community Health Bldg |
|
Replace and upgrade security |
250 |
|
|
|
Energy |
Lawrence |
Library |
|
Replace Roof |
500 |
|
Energy efficiency & renewable energy |
|
|
|
|
|
|
|
|
|
Subtotal
for Projects Ready for Construction Bid Letting within One Year |
|
73,000 |
792 |
|
0 |
8,587 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Projects
That Could Be Ready for Construction Bid Letting Within Two to Five Years |
|
|
|
|
Type |
Sponsor |
Name |
Location |
Description |
Costs (1,000) |
Federal Funds |
Federal Source |
State Funds |
Local Funds |
Source Document(s) |
|
Comments |
Sewer
Treatment |
Lawrence Utilities Dept. |
Wakarusa Water Reclamation
Facility |
4100 O'Connell Road |
Construction of a new BNR
treatment facility located in the southeast area of Lawrence south of the
Wakarusa River. |
100,000 |
|
Water & Sewer CIP |
|
Project could potentially be
ready within the 1 year timeframe with federal funding and design/build |
Water
System |
Lawrence Utilities Dept. |
Bowersock Dam |
Kansas River at the North 2nd
Street Bridges |
Major rehabilitation or
reconstruction of Bowersock Dam |
40,000 |
|
Water & Sewer CIP |
|
|
Water
System |
Lawrence Utilities Dept. |
SE Area Transmission Main Phase
II & III |
North Lawrence across Kansas
River to approximately 23rd & O'Connell. |
Completion of the water
transmission main from Kaw WTP to 23rd and O'Connell. |
11,000 |
|
Water & Sewer CIP |
|
|
Water
System |
Lawrence Utilities Dept. |
Kaw Water Treatment Plant
River Intake |
720 West 3rd Street |
Construct a redundant raw water intake for the Kaw WTP |
6,600 |
|
6,600 |
Water & Sewer CIP |
|
|
|
|
|
|
|
|
|
Subtotal
for Projects Ready for Construction Bid Letting within Two to Five Years |
|
157,600 |
0 |
|
0 |
6,600 |
|
|
|
|
|
|
|
|
|
|
|
GRAND
TOTALS |
|
280,450 |
11,640 |
|
0 |
37,057 |
|
|
|
|
|
|
NOTES: |
|
|
|
|
TIP
Transportation Improvement Program (2008-2012 amendment #2) |
|
|
|
|
Surface
transportation projects are listed in this document for federal programming
via KDOT. Some projects are now listed differently on this table than in the
TIP so either the TIP entry or this table needs revisions. Other projects
need to be added to the TIP to program federal funds. |
|
|
MTP Metropolitan
Transportation Plan (T 2030) |
|
|
|
|
Projects
are listed in the MTP specifically as a project or part of a larger project,
as part of a general category of projects, or as an illustrative project that
we plan to do if additional funds are obtained. The fiscally constrained MTP
does not include illustrative projects. |
|
|
Some
projects will need to be added to the MTP to make the MTP and TIP compatible
and program federal funds. |
|
|
|
ERP Economic Recovery Package |
|
|
|
|
From
what the City and MPO staffs have been told to date by KDOT and FHWA
officials some transportation projects may qualify for this funding. |
|
|
|
Eligibility
details are still unknown and this list of eligible projects is likely to
shrink as those details become available. |
|
|
|
MPO Items |
|
|
|
|
Projects
highlighted in yellow must be included in the Lawrence-Douglas County
Metropolitan Planning Organization (MPO) approved Transportation Improvement
Program and Metropolitan Transportation Plan. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|