Memorandum
City of Lawrence
Public Works
TO:
|
Chuck Soules,
Public Works Director
|
FROM:
|
Shoeb Uddin, City
Engineer
|
CC:
|
Dave Corliss, Cynthia Boecker, Diane Stoddard, Sheila Stogsdill, David Woosley, Scott McCullough, Jonathan Douglass , John Miller
|
Date:
|
September 15, 2008
|
RE:
|
Stoneridge Drive, Northbound Right-Turn Lane onto Kelly Drive
City Project No. PW0825
Benefit District - Resolution 6803
September 23, 2008 Regular Agenda Item
|
Background
Creekstone is a mixed use commercial and residential development
bounded by 6th Street, Overland Drive, Stoneridge Drive and Queens Road. Kelly Drive is the proposed future roadway that runs east-west connecting Stoneridge Drive and Queens Road and is located north of 6th Street [see attached
map]. Internal infrastructures (e.g. water, sewer, parking, various dry utilities
etc.) within Creekstone development, including Kelly Drive, are anticipated to
be constructed in 2009.
Stoneridge Drive, north of 6th Street is currently under construction. At the intersection of Stoneridge and
Kelly Drive, a northbound right-turn lane is warranted due to the traffic
generated by the Creekstone development. There are two options as to the
construction of this right-turn lane. One option is to build this turn lane as
part of the ongoing construction project for Stoneridge Drive. The other option
is to build the turn lane next year along with the rest of the infrastructure
in Creekstone development. The problem with the second option is that it would
require removing and replacing part of the pavement, curbs, sidewalks etc. of
the newly built Stoneridge Drive and, therefore, would be more expensive. So
the preferred alternative would be to build this right-turn lane as part of the
ongoing Stoneridge construction project. With that understanding, the property
owner of Creekstone Development has filed a petition [see attached] with the
City to form a benefit district to pay for the cost of design and construction
of the northbound right-turn lane on Stoneridge Drive at the intersection with Kelly Drive.
Project Status / Funding
The
proposed right-turn lane and related improvements will be made part of the
construction contract of the ongoing Stoneridge project; a change order will be
processed later on. Estimated total cost of the right-turn lane and related
improvements is $32,000.00; Creekstone Development will be assessed for 100% of
the cost of these improvements. City staff will coordinate and manage the
design and construction activities.
Action Requested
If
appropriate, approve Resolution 6803 setting out the findings and
determinations of the Governing Body and ordering the construction of a
northbound right-turn lane at the intersection of Stoneridge Drive and Kelly Drive.
Attachments: Resolution
6803
Petition
Map