CITY
OF LAWRENCE |
|
|
|
|
|
|
|
|
|
|
|
City Bid No. B08072 |
|
|
|
|
Project No.:
4-SI1-208(BD) |
|
|
|
|
6th Street and Congressional
Drive |
|
|
|
|
Intersection, Traffic
Signal Improvements |
|
|
Bid Date: September 16,
2008 |
|
|
|
|
Engineer's Estimate: $274,648.00 |
|
|
|
|
|
|
|
|
Torgeson
Electric |
J. Warren Co., Inc. |
Wildcat Concrete Services, Inc. |
|
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
|
1 |
Mobilization |
1 |
Lump Sum |
$
2,500.00 |
$ 2,500.00 |
$
6,000.00 |
$ 6,000.00 |
$
20,000.00 |
$ 20,000.00 |
|
|
2 |
Contractor
Construction Staking |
1 |
Lump Sum |
$
3,500.00 |
$ 3,500.00 |
$
1,500.00 |
$ 1,500.00 |
$
2,000.00 |
$ 2,000.00 |
|
|
3 |
Seeding, Fertilizing
and Mulching |
1 |
Lump Sum |
$
3,000.00 |
$ 3,000.00 |
$
2,000.00 |
$ 2,000.00 |
$
1,500.00 |
$ 1,500.00 |
|
|
4 |
Traffic Control |
1 |
Lump Sum |
$
15,250.00 |
$ 15,250.00 |
$
12,500.00 |
$ 12,500.00 |
$
12,000.00 |
$ 12,000.00 |
|
|
5 |
Adjust Water Valve
Box |
4 |
Each |
$
250.00 |
$ 1,000.00 |
$
235.00 |
$ 940.00 |
$
250.00 |
$ 1,000.00 |
|
|
6 |
Unclassified
Excavation |
138 |
C.Y. |
$
95.00 |
$ 13,110.00 |
$ 90.00 |
$ 12,420.00 |
$ 60.00 |
$ 8,280.00 |
|
|
7 |
Type B Compaction
(MR-90) |
328 |
C.Y. |
$
12.00 |
$ 3,936.00 |
$ 11.00 |
$ 3,608.00 |
$ 9.00 |
$ 2,952.00 |
|
|
8 |
Aggregate Base
(AB-3)(6") |
36 |
S.Y. |
$
20.00 |
$ 720.00 |
$ 20.00 |
$ 720.00 |
$ 35.00 |
$ 1,260.00 |
|
|
9 |
11" Concrete
Pavement (AE)(Reinf.) |
36.7 |
S.Y. |
$
90.00 |
$ 3,303.00 |
$ 62.00 |
$ 2,275.40 |
$
140.00 |
$ 5,138.00 |
|
|
10 |
HMA - Commercial
Grade (Class A) |
4 |
Tons |
$
325.00 |
$ 1,300.00 |
$
305.00 |
$ 1,220.00 |
$
300.00 |
$ 1,200.00 |
|
|
11 |
Remove and Replace
Concrete Curb and Gutter (AE) |
111 |
L.F. |
$
27.00 |
$ 2,997.00 |
$ 29.00 |
$ 3,219.00 |
$ 60.00 |
$ 6,660.00 |
|
|
12 |
Remove and Replace
Concrete Curb and Gutter (13" Toe)(AE) |
30 |
L.F. |
$
30.00 |
$ 900.00 |
$ 33.00 |
$ 990.00 |
$ 80.00 |
$ 2,400.00 |
|
|
13 |
Concrete Median Nose
(AE)(Taper Height) |
12.8 |
S.Y. |
$
200.00 |
$ 2,560.00 |
$
117.00 |
$ 1,497.60 |
$
240.00 |
$ 3,072.00 |
|
|
14 |
3" Concrete
(Plain)(AE) |
24.2 |
S.Y. |
$
40.00 |
$ 968.00 |
$ 27.25 |
$ 659.45 |
$ 30.00 |
$ 726.00 |
|
|
15 |
Paving Unit |
217 |
S.F. |
$
20.00 |
$ 4,340.00 |
$ 15.00 |
$ 3,255.00 |
$ 18.00 |
$ 3,906.00 |
|
|
16 |
4" Concrete
Sidewalk (AE) |
241.0 |
S.Y. |
$
46.00 |
$ 11,086.00 |
$ 31.00 |
$ 7,471.00 |
$ 75.00 |
$ 18,075.00 |
|
|
17 |
6" Concrete
Multi-Use Path (AE)(Fiber-Reinf.) |
27.1 |
S.Y. |
$
64.00 |
$ 1,734.40 |
$ 42.75 |
$ 1,158.53 |
$ 80.00 |
$ 2,168.00 |
|
|
18 |
Sidewalk Ramp (AE) |
30.4 |
S.Y. |
$
210.00 |
$ 6,384.00 |
$
166.00 |
$ 5,046.40 |
$
215.00 |
$ 6,536.00 |
|
|
19 |
Traffic Signal |
1 |
Lump Sum |
$
115,300.00 |
$ 115,300.00 |
$
136,000.00 |
$ 136,000.00 |
$
145,500.00 |
$ 145,500.00 |
|
|
20 |
Video Detection
System |
1 |
Lump Sum |
$
28,500.00 |
$ 28,500.00 |
$
30,000.00 |
$ 30,000.00 |
$
27,000.00 |
$ 27,000.00 |
|
|
21 |
Remove and Reset
Existing Fiber Optics Service Box |
1 |
Each |
$
750.00 |
$ 750.00 |
$
600.00 |
$ 600.00 |
$
800.00 |
$ 800.00 |
|
|
22 |
Pavement Marking
(4")(Yellow) |
380 |
L.F. |
$ 2.75 |
$ 1,045.00 |
$ 2.20 |
$ 836.00 |
$ 2.20 |
$ 836.00 |
|
|
23 |
Pavement Marking
(6")(White) |
213 |
L.F. |
$ 3.25 |
$ 692.25 |
$ 3.30 |
$ 702.90 |
$ 3.30 |
$ 702.90 |
|
|
24 |
Pavement Marking
(24")(White) |
198 |
L.F. |
$
11.00 |
$ 2,178.00 |
$ 13.00 |
$ 2,574.00 |
$ 13.20 |
$ 2,613.60 |
|
|
25 |
Pavement Marking
(36")(White) |
454 |
L.F. |
$
18.00 |
$ 8,172.00 |
$ 18.00 |
$ 8,172.00 |
$ 17.60 |
$ 7,990.40 |
|
|
26 |
Pavement Marking
Symbol (White)(LT Arrow) |
4 |
Each |
$
225.00 |
$ 900.00 |
$
250.00 |
$ 1,000.00 |
$
250.00 |
$ 1,000.00 |
|
|
27 |
Pavement Marking
Symbol (White)(RT Arrow) |
2 |
Each |
$
225.00 |
$ 450.00 |
$
250.00 |
$ 500.00 |
$
250.00 |
$ 500.00 |
|
|
28 |
Remove Existing
Pavement Marking |
196 |
L.F. |
$ 1.00 |
$ 196.00 |
$ 2.75 |
$ 539.00 |
$ 2.75 |
$ 539.00 |
|
|
29 |
Remove Existing
Pavement Marking Symbol |
5 |
Each |
$
75.00 |
$ 375.00 |
$
125.00 |
$ 625.00 |
$
110.00 |
$ 550.00 |
|
|
30 |
Remove and Reset
Existing Sign |
2 |
Each |
$
175.00 |
$ 350.00 |
$
250.00 |
$ 500.00 |
$
220.00 |
$ 440.00 |
|
|
31 |
Earthwork for Traffic
Island |
1 |
Lump Sum |
500 |
$ 500.00 |
800 |
$ 800.00 |
1200 |
$ 1,200.00 |
|
|
32 |
Removal of Existing
Pavement |
1 |
Lump Sum |
3500 |
$ 3,500.00 |
6000 |
$ 6,000.00 |
4000 |
$ 4,000.00 |
|
|
33 |
Curb and Gutter (Type
CG-1, Dry) |
56 |
L.F. |
25 |
$ 1,400.00 |
22 |
$ 1,232.00 |
40 |
$ 2,240.00 |
|
|
34 |
Pavement Marking
(Heat Fused Preformed Thermoplastic)(Yellow)(4") |
445 |
L.F. |
2.75 |
$ 1,223.75 |
2.2 |
$ 979.00 |
2.2 |
$ 979.00 |
|
|
35 |
Pavement Marking
(Heat Fused Preformed Thermoplastic)(White)(12") |
60 |
L.F. |
5.5 |
$ 330.00 |
5.5 |
$ 330.00 |
5.5 |
$ 330.00 |
|
|
36 |
Landscaping |
1 |
Lump Sum |
3500 |
$ 3,500.00 |
1500 |
$ 1,500.00 |
700 |
$ 700.00 |
|
|
|
GRAND
TOTAL |
|
$ 247,950.40 |
|
$ 259,370.28 |
|
$ 296,793.90 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|