CITY
OF LAWRENCE |
|
|
|
|
|
|
|
City Bid No. 08050 |
|
|
|
Project No. PW0809 - 2008 Overlay Program, Phase 2 |
|
|
|
Project No.
25-GI4-807(C) - 18th and Louisiana Raised Crosswalk |
|
|
|
Bid Date: June 3, 2008 |
|
|
|
Engineer's Estimate: |
|
|
|
Base Bid Grand Total:
$857,768.50 |
|
|
Alternate Bid Section:
$232,100.00 |
|
|
|
|
LRM
Industries, Inc. |
Asphalt Improvement Co. |
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
Base Bid Section 1 - 2008
Overlay Program, Phase 2, Project No. PW0809 |
|
|
|
|
|
|
1 |
Milling
(2") |
SY |
53,195 |
$ 1.35 |
$
71,813.25 |
$ 1.20 |
$
63,834.00 |
2 |
Asphaltic
Concrete Overlay Surface Course (2") |
TONS |
6,349 |
$
57.00 |
$
361,893.00 |
$ 60.75 |
$
385,701.75 |
3 |
Asphaltic
Concrete Overlay Leveling Course |
TONS |
732 |
$
67.00 |
$
49,044.00 |
$ 60.75 |
$
44,469.00 |
4 |
Concrete
Pavement Patch * |
SY |
630 |
$
78.00 |
$
49,140.00 |
$ 85.00 |
$
53,550.00 |
5 |
6"
Concrete Pavement (Reinforced) |
SY |
133 |
$
47.90 |
$
6,370.70 |
$ 58.00 |
$
7,714.00 |
6 |
24"
Concrete Curb and Gutter |
LF |
2,712 |
$
20.00 |
$
54,240.00 |
$ 21.00 |
$
56,952.00 |
7 |
Concrete
Sidewalk (4") |
SY |
111 |
$
41.75 |
$
4,634.25 |
$ 37.00 |
$
4,107.00 |
8 |
Concrete
Access Ramp |
EACH |
4 |
$
875.00 |
$
3,500.00 |
$
1,150.00 |
$
4,600.00 |
9 |
Driveway
Wedges* |
SY |
750 |
$
10.00 |
$
7,500.00 |
$ 11.00 |
$
8,250.00 |
10 |
Crackfilling
up to 1" width* |
LF |
10,900 |
$ 0.55 |
$
5,995.00 |
$ 0.50 |
$
5,450.00 |
11 |
Manhole
Adjustment |
EACH |
12 |
$
500.00 |
$
6,000.00 |
$
475.00 |
$
5,700.00 |
12 |
Valve
Adjustment |
EACH |
14 |
$
130.00 |
$
1,820.00 |
$
150.00 |
$
2,100.00 |
13 |
Cold
Plastic Reflectorized Pavement Marking |
|
|
|
|
|
|
|
a) 6" Dotted White Extension Line |
LF |
530 |
$ 3.55 |
$
1,881.50 |
$ 3.58 |
$
1,897.40 |
|
b) 6" Dotted White Bicycle Lane Line |
LF |
6 |
$ 3.55 |
$ 21.30 |
$ 3.58 |
$ 21.48 |
|
c) 6" Solid White Bicycle Lane Line |
LF |
1,497 |
$ 3.55 |
$
5,314.35 |
$ 3.58 |
$
5,359.26 |
|
d) 6" Broken White Lane Line |
LF |
2,820 |
$ 3.55 |
$
10,011.00 |
$ 3.58 |
$
10,095.60 |
|
e) 6" Solid White Edge Line |
LF |
36 |
$ 3.55 |
$
127.80 |
$ 3.58 |
$ 128.88 |
|
f) 6" Solid White Channelization Line |
LF |
1,797 |
$ 3.55 |
$
6,379.35 |
$ 3.58 |
$
6,433.26 |
|
g) 24" Solid White Stop Line |
LF |
417 |
$
10.40 |
$
4,336.80 |
$ 10.45 |
$
4,357.65 |
|
h) 36" Solid White Crosswalk Line |
LF |
849 |
$
12.50 |
$
10,612.50 |
$ 12.55 |
$
10,654.95 |
|
i) Left Turn Lane Use Arrow |
EACH |
26 |
$
260.00 |
$
6,760.00 |
$
260.00 |
$
6,760.00 |
|
j) Right Turn Lane Use Arrow |
EACH |
2 |
$
260.00 |
$
520.00 |
$
260.00 |
$ 520.00 |
|
k) Lane Reduction Arrow |
EACH |
2 |
$
1,040.00 |
$
2,080.00 |
$
1,060.00 |
$
2,120.00 |
|
l) Bicycle Symbol |
EACH |
11 |
$
130.00 |
$
1,430.00 |
$
135.00 |
$
1,485.00 |
|
m) 4" Solid Double Yellow Lane Line ** |
LF |
7,764 |
$ 4.40 |
$
34,161.60 |
$ 4.45 |
$
34,549.80 |
|
n) 6" Broken Yellow Lane Line |
LF |
160 |
$ 4.15 |
$
664.00 |
$ 4.20 |
$ 672.00 |
14 |
Heat
Fused Preformed Thermoplastic Pavement Marking |
|
|
|
|
|
|
|
a) 24" Solid White Stop Line |
LF |
5 |
$
10.40 |
$ 52.00 |
$ 30.00 |
$ 150.00 |
|
b) 36" Solid White Crosswalk Line |
LF |
75 |
$
12.50 |
$
937.50 |
$ 13.50 |
$
1,012.50 |
15 |
Traffic
Signal Loop |
EACH |
16 |
$
1,230.00 |
$
19,680.00 |
$
1,200.00 |
$
19,200.00 |
16 |
Asphalt Test Core* |
EACH |
13 |
$
50.00 |
$
650.00 |
$ 70.00 |
$ 910.00 |
17 |
Temporary Surfacing* |
TONS |
100 |
$
19.50 |
$
1,950.00 |
$ 20.00 |
$
2,000.00 |
18 |
Seeding, Fertilizing, and Mulching |
LS |
1 |
$ 5,000.00 |
$
5,000.00 |
$
1,800.00 |
$
1,800.00 |
19 |
Traffic Control |
N/A |
1 |
Force Account |
$
35,000.00 |
Force Account |
$
35,000.00 |
Total Base Bid Section 1 |
|
$
769,519.90 |
|
$ 787,555.53 |
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
Base
Bid Section 2-18th & Louisiana Raised Crosswalk,
Project No. 25-GI4-807(C) |
|
|
|
|
|
|
1 |
Mobilization |
LS |
1 |
$ 300.00 |
$
300.00 |
$
7,800.00 |
$
7,800.00 |
2 |
Demolition*** |
LS |
1 |
$
600.00 |
$
600.00 |
$
1,500.00 |
$
1,500.00 |
3 |
Compaction of
Earthwork |
LS |
1 |
$
200.00 |
$
200.00 |
$
800.00 |
$ 800.00 |
4 |
Aggregate Base (AB-3)
(6") |
SY |
60 |
$ 6.20 |
$
372.00 |
$ 10.00 |
$ 600.00 |
5 |
Curb and Gutter, Type
CG-1 |
LF |
32 |
$
28.00 |
$
896.00 |
$ 35.00 |
$
1,120.00 |
6 |
Tapered Curb |
LF |
38 |
$
20.00 |
$
760.00 |
$ 20.00 |
$ 760.00 |
7 |
Sidewalk Ramp |
EACH |
1 |
$
875.00 |
$
875.00 |
$
1,000.00 |
$
1,000.00 |
8 |
8" Fiber
Reinforced Concrete**** |
CY |
15 |
$
225.00 |
$
3,375.00 |
$
280.00 |
$
4,200.00 |
9 |
"Brick
Pattern" Stamped Concrete |
SY |
23 |
$
56.00 |
$
1,288.00 |
$
100.00 |
$
2,300.00 |
10 |
Inlet (Curb) (5'x4') |
EACH |
2 |
$
3,000.00 |
$
6,000.00 |
$
2,800.00 |
$
5,600.00 |
11 |
Junction Box (4'x4')
(H=6') |
EACH |
1 |
$
3,000.00 |
$
3,000.00 |
$
3,000.00 |
$
3,000.00 |
12 |
Storm Sewer
(15") (RCP) |
LF |
45 |
$
58.00 |
$
2,610.00 |
$ 55.00 |
$
2,475.00 |
13 |
Concrete Sidewalk
(4") |
SY |
28 |
$
39.00 |
$
1,092.00 |
$ 37.00 |
$
1,036.00 |
14 |
Seeding, Fertilizing,
and Mulching |
LS |
1 |
$
230.00 |
$
230.00 |
$
900.00 |
$ 900.00 |
15 |
Traffic
Control |
N/A |
1 |
Force Account |
$
2,000.00 |
Force Account |
$
2,000.00 |
Total Base Bid
Section 2 |
|
$
23,598.00 |
|
$
35,091.00 |
|
|
|
|
|
Base Bid Grand Total (Both
Sections 1 & 2) |
$
793,117.90 |
|
$
822,646.53 |
|
|
|
|
|
|
|
|
ITEM |
DESCRIPTION |
UNITS |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
Alternate Bid Section - 2008 Overlay Program,
Phase 2, Project No. PW0809 |
|
|
|
|
|
|
1 |
Milling
(2") |
SY |
18,877 |
$ 1.40 |
$
26,427.80 |
$ 1.50 |
$
28,315.50 |
2 |
Asphaltic
Concrete Overlay Surface Course (2") |
TONS |
2,253 |
$
60.00 |
$
135,180.00 |
$ 60.75 |
$
136,869.75 |
3 |
Asphaltic
Concrete Overlay Leveling Course |
TONS |
260 |
$
68.00 |
$
17,680.00 |
$ 60.75 |
$
15,795.00 |
4 |
Concrete
Pavement Patch * |
SY |
310 |
$
78.00 |
$
24,180.00 |
$ 89.00 |
$
27,590.00 |
5 |
Driveway
Wedges* |
SY |
595 |
$
10.00 |
$
5,950.00 |
$ 11.00 |
$
6,545.00 |
6 |
Crackfilling
up to 1" width* |
LF |
5,450 |
$ 0.55 |
$
2,997.50 |
$ 0.55 |
$
2,997.50 |
7 |
Asphalt Test Core* |
EACH |
5 |
$
50.00 |
$
250.00 |
$ 70.00 |
$ 350.00 |
8 |
Traffic Control |
N/A |
1 |
Force Account |
$
5,000.00 |
Force Account |
$
5,000.00 |
Total Alternate Bid Section |
|
$
217,665.30 |
|
$ 223,462.75 |
|
|
|
|
|
|
|
|