COMMISSION REPORT REGULAR AGENDA --NON-PUBLIC HEARING ITEM: |
PC Staff Report
ITEM NO. 6E: |
PRELIMINARY PLAT FOR CREEKSTONE; |
PP-10-09-07: |
Preliminary Plat for Creekstone, Stoneridge
Dr to Queens Rd & 6th St to Overland Dr, a 6 lot subdivision
containing 34.864 acres. Submitted by Landplan Engineering, for Pear Tree
Village LC, property owner of record. |
STAFF RECOMMENDATION: Staff recommends deferral of the Preliminary Plat of Creekstone
until rezoning requests have been approved due to the fact that the proposed development
is not consistent with the recommendations in the Comprehensive Plan or the Northwest Plan. |
|
If the decision
were made to approve the preliminary plat, Staff recommends the following
conditions of approval: 1.
Provision
of a note on the preliminary plat to acknowledge that the applicant/property
owner would be required to execute several agreements at the final plat stage
for recording with the final plat, including: a.
an agreement
not to protest the formation of a benefit district for signalization and
geometric intersection improvements at b.
an agreement
not to protest the formation of a benefit district for improvements to c.
an agreement
not to protest the formation of a benefit district for geometric improvements
to 2.
A note
must be placed on the plat stating that building permits for the
multi-dwelling development will be restricted to 35 if only one access point
is provided and restricted to 100 until 2 remote access points have been
established, per the Fire Code. 3.
A note
must be placed on the plat stating that the Utilities Department will be
notified if the access points are changed from that shown on the plat to
allow coordination with utility placement. The applicant must also notify the
Public Works Department regarding any change to the proposed access points. 4.
Private
streets are permitted only with planned developments. Any proposed streets on
5.
Provisions
of Financing of Roads, Sewer, Water and other Public Service Notes 1 and 2
must be revised to remove any reference to ‘private’ streets. 6.
Minimum
Elevation of Building Openings (MEBO) must be noted for each lot which is
adjacent to a drainage easement. 7.
A note
must be placed on the plat stating that no building permits will be issued
until streets are installed, hydrants are in service and signs are in place. 8.
A
concept plan must be submitted which illustrates that the lot size and
configuration will permit compliance with the Commercial Design Standards. 9.
Dedicated
turn lanes must be shown on the plat, northbound right-turn lane at 10.
Notes
must be added to the ‘Provisions of Financing’ notes stating that ‘The northbound
right-turn lane on Stoneridge Drive at Kelly Drive will be constructed at the
developers expense’ and “If Queens Road has been built prior to the
construction of Kelly Drive, the developer is responsible for the
construction of the northbound left-turn lane on Queens Road at Kelly Drive.”
‘ |
Applicant’s Reason for Request: Subdivision
requirement prior to development of property.
KEY
POINTS
·
The preliminary plat was originally submitted in
October of 2007, and has been revised to reflect revisions made in the
associated rezoning requests.
·
The preliminary plat is accompanied by four rezoning
requests: Z-02-07A-08 for 6.99 acres from the
·
The proposed commercial development is not
compliant with recommendations in Horizon
2020 or with the Northwest Plan.
SUBDIVISION
CITATIONS TO CONSIDER
·
This
application is being reviewed under the Subdivision Regulations for
·
The
applicant proposes the use of private streets, which are permitted only in
Planned Developments. The streets must be shown as public streets with
dedicated right-of-way or the property must be rezoned to permit development as
a Planned Development.
ASSOCIATED
CASES/OTHER ACTION REQUIRED
Zoning
·
Planning Commission approval of associated
rezonings: Z-02-07A-08 for 6.99 acres from
·
City Commission approval of rezoning requests and
publications of ordinances.
Platting
·
Submittal of the preliminary plat to the City
Commission for acceptance of dedication of rights-of-way and easements.
·
Submission of Public Improvement Plans to City
Public Works Department and Utilities Department prior to recordation of the
final plat.
·
Written certification from the City Engineer that
all required public improvements have been completed or one of the means of
ensuring completion of required public improvements listed in Section
20-811(h)(2) of the City/County Subdivision Regulations.
·
Planning Director’s approval of the final plat and
recordation of the Creekstone Final Plat at the Douglas County Register of
Deeds.
Development
·
Submittal and administrative approval of a site plan
for the multi-dwelling development.
·
Submittal and administrative approval of site
plans for the commercial development requires compliance with the Development
Code and Commercial Design Standards.
PUBLIC COMMENT RECEIVED PRIOR TO PRINTING
·
None to date
GENERAL INFORMATION |
|
|
Current
Zoning and Land Use: |
|
|
Surrounding
Zoning and Land Use: |
To the west: RM12D
(Multi-dwelling Residential) District; property has been rezoned and platted
but is currently undeveloped. RS10
(Single-dwelling Residential); St Margaret’s Episcopal Church property. GPI (General Public and Institutional Use) District; City water tower
will be constructed at this location. To the south: PRD (Planned Residential Development) District; undeveloped residential property platted as
the Stoneridge East Addition; Multi-dwelling residential units under
construction. RS7 (Single-dwelling Residential) District; undeveloped property
belonging to the To the north: To the east: RM12 (Multi-dwelling Residential) District; townhomes. |
|
|
|
|
Site Summary
|
|
Gross Area: Rights of Way: Net Area: Number of Lots: |
40.79 acres 7.71 acres 24.21 acres 6 |
|
|
|
|
STAFF REVIEW
The subject property is located north of
Zoning and Land Use
The subject property is currently zoned
Streets and Access
Access is restricted from
The Fire Code requires remote access points to be located a distance of
½ the diagonal distance of the property.
If the adjacent streets have not been constructed prior to the
multi-dwelling development, the number of building permits would be limited
until the remote access points are provided.
The Development Code requires two access points be provided for any
multi-dwelling development containing more than 35 dwelling units. The Fire
Code requires remote access points for any development containing more than 100
dwelling units. A note must be placed on
the plat that building permits for the multi-dwelling development will be
restricted to 35 with only one access point and restricted to 100 until 2
remote access points, have been established per the Fire Code.
The Traffic Impact Study was
reviewed by various City Departments. The study indicated that a dedicated
northbound right-turn lane from
The property owner will be required to execute several Agreements Not
to Protest the Formation of a Benefit District (ANTP) at the final plat stage,
including the following:
Utilities and Infrastructure
The access points onto
Easements and Rights-of-way
A permanent easement for public and utility purposes was provided in
Tract 7 of Condemnation Case #-3-C-311, District Court of Douglas County and is
shown on the plat. A permanent easement for controlled access highway, Tract 7
of Condemnation Case #03-C-311 is shown on the plat and the access restriction
is shown by hatch marks. Sanitary sewer
easements exist on the southern property boundary adjacent to
Conformance
Horizon 2020 states that “All new commercial and office
development shall occur in accordance with the plan recommendations. New
commercial, retail and related uses shall be developed as a node with shared
parking areas, common access drives, and related design and appearance. Nodes
shall be positioned and oriented to the primary street intersections where they
are located, avoiding a ‘strip’ pattern as a result of extension of commercial uses
along the streets from where the node originated.” (Chapter 6, page 6-14)The layout of this
preliminary plat does not conform with the nodal layout recommended by Horizon 2020.
Horizon 2020 includes recommendations for the size and
location of commercial centers and requires that the plan be amended if the
locations or size are to be changed. (Chapter 6, page 6-14). The plan recommends a list of intersections
as potential locations for new Neighborhood Commercial Centers. There are no
locations recommended for
Private streets are permitted only within Planned Developments. The
streets which will serve
The preliminary plat, as conditioned, conforms with the Subdivision
Regulations and Lot Density and Dimension Requirements of the Development Code
for Commercial and Commercial-Office Development. However, it is not compliant
with the nodal commercial development pattern strongly recommended in Horizon 2020. A concept plan must be
provided to verify that the preliminary plat provides adequate area within each
commercial lot to permit compliance with the Commercial Design Standards during
the site planning process.
An independent Retail Market Impact Analysis is required per Section 20-1107(a) of the Development Code for any proposed commercial development which could result in over 50,000 sq. ft. or more of additional floor area for retail businesses in the City. As the proposed rezoning and preliminary plat would create an area which could result in over 50,000 sq. ft. of retail floor area, a Retail Market Impact Analysis was required. The Retail Market Study that was submitted by the applicant has been reviewed by Staff. Staff is of the opinion that the Retail Market Study submitted satisfies the requirements of Section 20-1107 of the Development Code.