Memorandum
To: Lawrence Planning Office
Lawrence
City Commission
From: Tim Herndon - Landplan Engineering, PA
Date: January 18, 2007
Re: Bauer Farm - Responses to 1/3/08 Staff
review comments
Please note, staff comments in black; applicant responses in blue
Also note – This memorandum accompanies
the revised preliminary development plan for Bauer Farm. On behalf of the applicant, we hereby request
this item be placed on the earliest available agenda for City Commission action.
JANUARY 3, 2008
SUMMARY OF RATIONALE FOR
CITY
STAFF CONCERNS WITH THE BAUER FARM
PRELIMINARY DEVELOPMENT PLAN
On January 10, 2006 the City
Commission conditionally approved the Bauer Farm Preliminary Development Plan
with the stipulation that a revised Preliminary Development Plan for Bauer
Farm, meeting the ten conditions of approval, would be brought back to the City
Commission.
Since the Jan 10, 2006 City
Commission meeting, the applicant has made a number of proposed additions and modifications
to the Preliminary Development Plan (Five PDP submitted revisions dated 3/07/07, 6/27/07, 7/6/07, 8/3/07 & 11/29/07). The major items of revision include additional
access points with US-40 (W. 6th); a break in the median and traffic
signal on Wakarusa Drive; dedication of the internal residential streets to the
City as public rather than private streets, an additional 10,000 Square Feet of
Commercial Retail Space (rezoning conditionally approved by the City Commission
on August 28, 2007) and a 108 2-bedroom apartment complex replacing an area in
the northwest portion of the project previously shown as a future hotel.
The top
issues that City Staff has concerns with are:
1. The additional access points being
proposed with Highway 40 (W. 6th Street).
Access
control for Highway 40 (W. 6th
Street) is believed to have been acquired with the
widening of US-40 (to W. 6th
Street) to five lanes in 2002. The only direct access
point for Bauer Farm along this controlled access highway was to be at Champion Lane,
which would be signalized.
With the
January 10, 2006 City Commission conditional approval of Bauer Farm PDP,
compromise was reached among the City, KDOT and the developer to allow (in
addition to Champion Lane) only one right-in access from 6th Street
to this property. The latest proposal is for the right-in to also have a
right-out and for an additional right-in on W. 6th Street near the
intersection of W. 6th/Wakarusa Drive.
The City
Engineer, Transportation Engineer, and Transportation Planner have concerns
with the additional accesses proposed.
W. 6th Street
is a state highway and a principal arterial street as designated by the City.
According to the current City Development Code Section 20-915(e)(1),“Direct access to an arterial street is
prohibited except in redevelopment or infill situations where the subject
property has no other reasonable access to the street system and the City
Engineer determines that access onto the arterial street, based on the street’s
ultimate design, can be safely accommodated.”
In 2002, a
written agreement was entered into between the City and KDOT for the W. 6th Street
Reconstruction Project. This agreement prohibited additional access points onto
W. 6th Street
unless approved in writing by the Secretary of the Kansas Department of Transportation.
An e-mail
dated December 18, 2007, from Chris Huffman - KDOT’s Assistant Chief of Traffic
Engineer/State Corridor Engineer states that, “District One and Corridor
Management met with Deputy Secretary Jerry Younger, and KDOT does not support
the changes in access proposed in the revised Bauer Farm/CVS Pharmacy Traffic
Impact Study. We also wish to express our concern at the notion of a signal,
even a ‘fully coordinated’ signal on Wakarusa
Drive so close to the US-40 intersection. It will
undoubtedly be detrimental to the operation of the US-40/Wakausa Intersection.”
Staff does
not believe the integrity of the corridor will be maintained with the
additional access points.
The
applicant believes the integrity of the corridor will be maintained, and the
access points are not only operationally adequate [or better] but are necessary
to provide sufficient access to ensure Bauer Farm is a successful, convenient
mixed-use development. See specific
responses to City comments later in this letter.
2. The proposed median break on Wakarusa Drive.
The
applicant is proposing a break in the Wakarusa
Drive median for a double-left turn out of Bauer
Farm. The City Engineer, Traffic Engineer, Transportation Planner and KDOT all
have concerns with allowing the proposed break in the median and how it would
affect traffic safety/congestion in the area and the impacts upon the
intersection of US-40/Wakausa
Drive. See addition transportation review comments
later in this report.
The
applicant believes the integrity of the area and intersection will be
maintained, and the left-turn-out is not only operationally adequate [or
better] but is necessary to provide sufficient access to ensure Bauer Farm is a
successful, convenient mixed-use development.
See specific responses to City comments later in this letter.
3. The proposed phasing for completion
of Champion Lane.
Except for
Champion Lane,
Bauer Farm has not been platted. The Preliminary Development Plan acts as the
Preliminary Plat for the property.
In 1995, Champion Lane was
platted and dedicated as an 80’ wide right-of-way, with the Free State (High School) Addition Plat. Champion Lane would
provide some relief to the backed up traffic congestion on Overland Drive when Free State High School
lets out.
Staff is
of the opinion that the completion of Champion
Lane from W. 6th Street to Overland Drive
should be included with the first phase improvements (2008) of Bauer Farm,
rather than leaving approximately 120’ of street/sidewalk connection with Overland Drive to
be completed in the proposed sixth phase (2010/2011) of Bauer Farm’s proposed seven
phases (2011/2012).
Bauer Farm
is willing to construct all of Champion Lane in Phase I, as apparently desired
by staff. However, because the extension
of Champion Lane in Phase I is not necessary from an operational standpoint,
the City should [in return] provide Bauer Farm the other proposed access points
necessary to better ensure the development’s success.
4. The proposed relocation of the
building at the intersection of 6th/Wakarusa Drive.
The
proposed location of the commercial retail building at the intersection of 6th/Wakarusa
has been moved back from the street and the parking lot areas put in front of
the building. This is a change from the previous approved project concept using
Traditional Neighborhood Design (TND)
elements, and does not match the basic commercial building design location
(buildings moved towards the main street frontages and parking lots behind) for
Bauer Farm.
The retail
“anchor” depends upon the visibility of its parking area, in proximity to its
front door/main store entrance – a basic requirement. Bauer Farm is negotiating with the anchor
regarding architectural guidelines and material standards.
5. The utility layout and ongoing utility/street
maintenance requirements by the City.
The January 10, 2006 PDP had
the internal residential streets as private streets. These streets/alleys are
now being offered for dedication to the City. The elected officials need to be
aware that the utility and streets are somewhat of a different layout than what
the city has normally seen and there are some design issues that need to be
addressed by the applicant per the most recent Utilities Review Comments of December 18, 2007.
The
Transportation, Utility, and Park Department review comments are attached but
have not yet been addressed by the applicant. The review comments from the Fire
Department are also attached, which the applicant has stated they will address.
The
aforementioned comments are addressed via revised [re-submitted plans] and per
correspondence/meetings with City Public Works, Utility and Fire Dept.
staff. See specific responses to City
comments later in this letter.
FUTURE BAUER FARM ACTION
Bauer Farm
was submitted and is proceeding under the prior zoning codes (prior to July 1, 2006).
Once the
City Commission has reviewed and approved the revised Bauer Farm Preliminary
Development Plan, phased Final Development Plan(s) and Final Plat(s) for Bauer
Farm will go to the Planning Commission for approval. The dedication of road
rights-of-way and easements will go to the City Commission for acceptance.
When the
final plat has been recorded, the previously approved rezonings for the
property would come back to the City Commission in ordinance format for the
zoning ordinance readings and publication.
-----------
12/17/07 Bauer Farm TIS – Comments from TIS Transportation Review committee
Comments from TIS Review Committee (City Engineer, Traffic
Engineer, Transportation Planner) regarding the Traffic Impact Study by Mr.
Mehrdad Givechi dated November 14th, 2007 are outlined below in two
categories, e.g. Technical Issues and Policy Issues.
Technical Issues
- The
Traffic Impact Study assumes that the signal at 6th and
Wakarusa will operate under a signal cycle length of 110 seconds. This
assumption is not reflective of the field conditions. The fact of the
matter is: the traffic signal at this location will not operate on a 110
second cycle and provide for pedestrians; it is currently running “free”
because it can’t run on a 120 second cycle like the rest of 6th Street. However, when additional signals are
added to the west, it will need to be coordinated and the minimum cycle
length it will operate at is 136 seconds.
In addition, when the federal government changes the pedestrian
walking speed to 3.5 ft/sec instead of the current 4.0 ft./sec, the cycle
length will need to be 150 seconds.
Therefore the three signals along Wakarusa (at 6th,
Bauer Farm Drive and Overland Drive) need to be evaluated at 136 and 150
second cycles and time/space diagrams need to be provided along with a
SimTraffic simulation. [As mentioned
on page 2 of the TIA dated 11/14/07 (under “Assumptions”), information
presented in the Traffic Impact Study, Bauer Farm Update, dated March
2007 & the Traffic Impact Study for Walmart Store #5219, dated July
12, 2006 by TranSystems is used as basis for our analysis, under the
assumption that the said report was reviewed and approved by review
agencies and that all information contained in that report is valid.
According to that report (page 263 of the .pdf file), the cycle length
used for “Ultimate” case scenario at the intersection of Wakarusa Drive
& 6th Street is 110 seconds. Our analysis merely reflects
this information without any change.] Also, if a traffic signal
is provided at this intersection, then it would be expected that
pedestrians would want to cross there to get to-and-from Walmart instead
of walking to Overland
or to 6th Street;
therefore, this signal should account for pedestrian timing. [As mentioned in our presentation dated 11/19/07, current
plans do not provide for pedestrian crosswalks on Wakarusa Drive at Bauer Farm Drive (in the east/west
direction). They do, however provide for pedestrian crosswalks on Bauer Farm Drive
at Wakarusa Drive
(in the north/south direction). The logic behind our analysis is to
maintain the same pedestrian movement patterns for both safety &
operational reasons that has been approved (per 6th & Wak
Plans & tentative approval of Bauer Farm plans). Our proposed median
cut with signal still allows pedestrian movement crossing Bauer Farm Drive
(in the north/south direction) but not allowing crossing Wakarusa Drive.
Since this will be a restricted access type (3/4 type), we do not believe allowing
pedestrian activity all around the intersection specifically crossing Wakarusa Drive
at this location is necessary or advisable. Pedestrians will continue to
cross Wakarusa Drive
either at 6th
Street and Overland Drive as proposed under
current plans.]
- State
law requires that left-turning vehicles “yield” to all other traffic;
therefore, the assumption that the eastbound right-turning vehicles at the
intersection of Bauer Farm Drive & Wakarusa will “yield” to the
westbound double left-turn is contrary to state law and driver
expectation. [An alternative analysis has been
conducted to reflect this signal phasing scheme. The results, as summarized
in Table 2 – Revised (attached), indicate that the LOS for the
intersection as a whole drops from “A” to “B” with each individual
movements operating at LOS “D” or higher and maximum stacking will not
cause spillback onto the upstream intersection.]
- The TIS by Mr. Givechi shows 253 west-bound left turning
vehicles at the intersection of Wakarusa and Bauer Farm Drive, whereas the
Bauer Farm TIS by TranSystems, dated March 2007, showed a total of 83
vehicles exiting the entire development onto Overland Drive heading west,
and it is likely that a percentage of those would be continuing west and
north of Overland & Wakarusa instead of turning left. Please provide
more explanation as to the assumption that 50% of the left turning
vehicles at the intersection of Overland
Drive and Wakarusa would be diverted to the
intersection of Wakarusa and Bauer
Farm Drive. [This 50% assumption is made to
evaluate a “Worse Case Scenario” from an operational point of view, on the
basis that provision of the proposed access modifications would result in
diversion of westbound traffic that would have otherwise used Overland
Drive at Wakarusa and/or Champion Lane at 6th Street. It is more
than likely that left-turning movements out of Bauer Farm Drive may not reach this
50% value, in which case operation of this intersection becomes even more
efficient with higher levels-of-service, less delay values and shorter
stacking (95% BOQ). It is to be noted that a number of permutations can be
examined for analysis purposes, but the TIA Report dated 11/14/07
focuses on the “Worse Case Scenario” as a conservative approach.
For practical purposes,
it is therefore recommended that installation of the proposed traffic signal for
this median opening at Bauer Farm
Drive be considered only when/if signal warrants are met at this location.
This can be determined by conducting a comprehensive signal warrant analysis
using warrants listed in the Manual of Uniform Traffic Control Devices
(MUTCD), upon completion of different phases of the Bauer Farm development,
after traffic in the area is present and normalized. A cursory
evaluation of “Peak-Hour Volume Warrant” (MUTCD Warrant #3) indicates that a
minimum of 100 vph for the westbound left-turn movement (exiting Bauer Farm
Drive) is needed before a signal may be considered at this location.
In the meantime, prior
to installation of a signal at this location, this intersection can operate
with stop control on Bauer Farm Drive with one dedicated westbound left-turn
lane and one westbound dedicated right-turn lane via application of appropriate
pavement markings and signs. The median opening can be implemented in either of
two ways:
a.
Incremental Median Opening - Provide a median opening wide
enough for a single lane to receive traffic from one westbound left-turn lane
exiting Bauer Farm Drive.
At some future point in time, when traffic signal is warranted and installed,
the opening can be expanded to allow for westbound dual left-turn movement; OR
b.
One-time Median Opening - Provide a median opening wide
enough for two lanes for future accommodation of dual left-turn movement, but
mark as one lane via cross-hatch lines & signs to prevent undesired
westbound dual left-turn movements.]
- Please provide geometric details of the intersection of
Wakarusa and Bauer Farm Drive
addressing the feasibility and practicality of the permitted and
prohibited movements at this intersection including pedestrian crossing. [Provided. See Figure 4 of
Appendix I of TIA dated 11/14/07.]
- Please provide analysis of the RIRO and the RI only
access drives on 6th
street
to determine Level of Service and Delay. [A volume/capacity analysis is typically conducted to
determine LOS for individual movements. The methodology used for this
analysis does not assign LOS to free flow movements (having the
right-of-way) since they do not experience any delays. Therefore,
determination of LOS for the RI access drive is meaningless. As for the
RIRO access drive, LOS can only be determined for the Right-Out (RO)
movement. Since the volume of traffic for this movement is unknown, volume
thresholds for different LOS are established using volume/capacity
analysis as follows:
- VRO < 93 vph results in (LOS C)
- 93 vph < VRO < 148 vph
results in (LOS D)
- 148 vph < VRO < 186 vph
results in (LOS E)
- 186 vph < VRO results in (LOS F)
Based on the volume
threshold provided above, it is anticipated that the LOS for the RO movement at
this location will not drop below “D”.
- During his presentation, Mr. Givechi argued that the
proposed signal at the intersection of Wakarusa and Bauer Farm Drive will improve the
Level of Service and reduce intersection delay at the intersection of
Wakarusa and Overland Drive.
According to the Bauer Farm Traffic Impact Study by TranSystems, dated
March 2007, the average delay at the intersection
of Overland
and Wakarusa is less than 55 second, with the westbound left turning
movements experiencing a delay of less than 55 seconds as well. So there
is really no concern to address as far as the performance of this
intersection is concerned with respect to Delay. [According to TranSystems’
TIS dated March 2007, page 267 of .pdf file, although the delay value for
the intersection of Wakarusa Drive & Overland Drive for the “Ultimate”
case scenario will not exceed 55 seconds for the entire intersection as a
whole, some individual movements do experience longer delays with poor
Level-of-service (LOS) as follows (See Table 2 and Figures 1 & 6 of
Appendix II of TIA dated 11/14/07):
- EB left-turn delay = 56.3 sec/veh (LOS E)
- EB Through delay = 56.5 sec/veh (LOS E)
- SB left-turn = 63.3 sec/veh (LOS E)
- Total intersection delay = 39.9 sec/veh (LOS D)
Our proposal improves
the operation of this intersection by reducing delays not only for the entire
intersection, but also for individual movements with no individual movements
experiencing LOS “E” or worse. (See Table 2 and Figures 4 & 9 of Appendix
II of TIA dated 11/14/07):
a.
EB left-turn delay = 13.6 sec/veh (LOS B)
b.
EB through delay = 28.9 sec/veh (LOS C)
c.
SB left-turn delay = 41.8 sec/veh (LOS D)
d.
Total intersection delay = 33.9 sec/veh (LOS C)
The results of the
analysis, clearly, show overall improvement at this intersection as the result
of our proposal.]
- What is the volume of through traffic at the locations
where no accidents have occurred involving right turning movements in the
recent past? This refers to the examples cited by Mr. Mehrdad Givechi
during his presentation on November 19, 2008. [Based on available
information (actual traffic counts conducted in 2000 and 2001),
directional afternoon peak-hour traffic volumes (in the direction of
Right-In and Right-Out movements) are summarized below. In addition, Table
2 of the TIA Report dated 11/14/07 is revised to reflect this
information (See attached Table 2 – Rev.).
a.
Westbound through traffic volume on 6th Street, east of Lawrence Ave. is
approximately 1,600 vph.
b.
Westbound through traffic volume on 23rd Street, east of Harper St. is
approximately 1,500 vph.
c.
Southbound through traffic volume on Kasold Drive, north of Clinton Parkway is approximately 750 vph.
It is to be noted that
projected future through traffic volumes for the westbound movement, east of Wakarusa Drive
(during afternoon peak-hour for target year 2025) is approximately 1650 vph,
which is comparable with those of locations cited above (See Appendix II of TIS
Report, dated 11/14/07).
Traffic counts for year 2007 indicates that this volume is approximately 766
vph.]
- The RI only access to CVS pharmacy is within the
functional limit of the intersection of 6th and Wakarusa. [As shown in Figure 5 of
Appendix I of TIA Report dated 11/14/07, the location of proposed RI
driveway is beyond the maximum stacking length (95% Back Of Queue, BOQ) of
dedicated right turn-lane and also does not interfere with the maximum
stacking (95% BOQ) of through & left-turn lanes.]
- The Right out movement is a safety hazard due to the
potential conflict with the large number of through vehicles on 6th street. [Information presented in
Table 3 of TIA Report dated 11/14/07 shows three-year crash data on file
for three existing sites with similar physical characteristics. As shown,
the percent number of crashes related to Right-Out movement from a
driveway onto a major arterial is less than 3%. Also see response to item
7 above.]
- Please show the queue length for SB traffic at the
intersection of 6th and Wakarusa, and, Wakarusa and proposed Bauer Farm Drive. [According to TranSystems’
TIS, maximum stacking length (95% BOQ) for north approach (southbound
movement) at 6th & Wakarusa is as follows:
- SB left-turn = 208’
- SB through = 381’
- SB right-turn = 32’
As the result of TIA
Report dated 11/14/07, maximum stacking length (95% BOQ) for north approach
(southbound movement) at Wakarusa & Bauer Farm Drive is 150’.]
- Figure 4 of the TIS by Mr. Givechi for projected SB
movement at Wakarusa Drive
and Bauer Farm Drive
needs to be revised accordingly. [Revised]
Transportation Policy Issues
1.
According to the West
6th Street Access Management plan and
the agreement between the City and KDOT for the West 6th Street Reconstruction
project, access onto 6th
street along the proposed Bauer Farm is prohibited
unless approved in writing by the Secretary of Transportation. [The TIA dated 11/14/07 was provided to support and justify proposed
access modifications to Bauer Farm Development. The results indicate that these
access points are reasonable and necessary to support commercial/mix-use
activities at this location, as prescribed in the Comprehensive Plan and
also existing for the existing Westgate development across 6th Street. Currently,
Westgate development has two (2) fully-directional and one RIRO access drives. With
proposed access modification for Bauer Farm development, only one (1) fully-directional,
one (1) RIRO and one (1) RI access drives will be provided along 6th Street,
which is more restrictive than those for Westgate development cross the Street.
It is, therefore recommended that the City express this to KDOT in order to
obtain written approval from Secretary of Transportation.]
2.
During the previous submittal of this development plan,
compromise was reached among the City, KDOT and the developer to allow one RI
only access from 6th street to this property. The new proposal is in
direct conflict with the proposal previously agreed upon. [This is
why a detailed Traffic Analysis was conducted to justify the proposed access
modifications, TIA dated 11/14/07.]
3.
6th
street is a state highway and an arterial street as designated by
the city. According to the current City Code [9-20 (e) (1) – Arterial
streets)], driveway access to Arterial streets is generally prohibited. In the
event a driveway access to an Arterial street is permitted, the spacing shall
be a minimum of 300 feet from the perpendicular curb face of an intersecting
street or driveway. [Proposed RI onto 6th Street, east of Wakarusa Drive is
located approximately 328’ from perpendicular curb face of Wakarusa Drive. Proposed RIRO onto 6th Street,
farther east is located approximately 552’ from perpendicular curb face of Wakarusa Drive. In
addition, the median opening on Wakarusa
Drive at Bauer
Farm Drive is approximately 394’ from
perpendicular curb face of 6th
Street.]
4.
It is important that city policies and codes are applied
consistently across the board. Waiver from established and adopted city policy
and standard without a very sound justification would create bad precedence for
future development proposals and for existing commercial establishments who
would desire similar access onto 6th street or other arterial street
throughout the city. [The purpose of the
TIA dated 11/14/07
is to provide sound justification for proposed access modification.] In particular, the City and KDOT closed the entrance
to Wakarusa Crossroads Shopping center
during the reconstruction of 6th
street. The 6th and Wak development,
the Oakley Addition at 6th and Folks, Northgate Development and
Mercato Development have not been granted access to 6th street. [We are not proposing a 6th Street access point
at any previously prohibited location (i.e. Oakley Addition). Justification for
the proposed access points off 6th
Street is provided via TIA dated 11/14/07.]
5.
It
is also important to ponder on the incremental effect of waivers from standard
guidelines. There are numerous locations in town where we have been
experiencing the cumulative effect of a large number of driveways along
arterial streets.
--------
12-18-07
Review of Bauer Farms
Layout – revision date 11-29-07
Comments by City Utilities
Department - Kevin Carr, Shelley Schupp,
Philip Ciesielski
1. The water line and sanitary sewer main should
not be located under storm sewer inlets.
Revised
2. For water quality issues, the main across Overland Street at
the first drive east of Wakarusa (that only serves a fire hydrant) should be
connected to the main to the south. Revised
3. The water main on Bauer Farm Drive is not continuous. Please correct. Revised
4. According to KDHE, there must be 10 feet of
separation between sanitary sewer lines (sewer mains and private services) and
potable water (water main and services).
With the meter tiles being 1.5 feet in diameter and needing to be placed
in green space (not driveways), there is concern that this separation is not
possible given the current layout.
Please provide a drawing showing the proposed service lines for both
sanitary sewer and water line to show that the separation is possible with the
current layout. Also, show there is
green space for the meter tiles. Revised – Requested drawing attached.
5. In the residential area, there is storm sewer
line intersecting with the sanitary sewer manholes. Please provide at least 2’ separation between
the storm sewer and the sanitary sewer line.
Revised
6. Waterline services should be taken from the
new 8” main installed with this project. Revised
7. Water line front footage fees due for W 6th Street,
Wakarusa Drive,
and Overland Drive. Noted
8. There are locations where the storm sewer and
the waterline are parallel two feet from centerline to centerline. The storm sewer and water line should have 2
foot separation from edge of pipe to edge of pipe. Revised
9. In the residential area, there is water line
that is located between buildings. Water
main should not be located between buildings.
Revised
10. In the residential area, there is water main
closer than 10 feet to the sanitary sewer main.
Relocate the utilities to provide 10 feet of separation between the
water main and the sanitary sewer main. Revised
11. Sanitary sewer is located outside of
right-of-way and easement in several locations.
Easements should be 15’ wide for the sanitary sewer and there should not
be any trees or shrubs located within this easement. Revised
12. As per city code 19-214, sanitary sewer
service shall not be located within right of way or easement for greater than
15 feet. A variance will be required for
the lots that do not meet this code. There should also be documentation to the
future owners about the potential costs for future maintenance of service lines
under street pavement (flowable fill required, street repair expenses paid by
the owner of the service line, etc). If
the sanitary sewer main is located under public-maintained pavement, stub lines
should be included in the public improvement plans. Noted
13. The utilities department recommends that the
applicant’s agent meet with the utilities department to review these
comments. Met
w/Utilities Dept. 1.10.08; met w/ Fire Dept. 1/11/08
14. Public
improvement plans will be required for the water main and the sanitary sewer
main prior to issuance of building permits.
The alignment of the public improvements should be resolved on the
preliminary development plan prior to public improvement plans. If the development is to be completed in
phases, phasing of the site should be included in the public improvement plans. Noted. Revised
15. The 12” waterline to be abandoned
is only indicated on the south side of the property – where is it shown on the
north side? Revised
16. There is a hydrant leg on Bauer Farm Drive
that crosses the street. Typically the
fire hydrant assembly is located on the same side as the main. Longer dead end pipe can become a water
quality issue. Revised
17. Sanitary sewer is very close to the
building in several locations. The
utilities department prefers to have the sanitary sewer main at least ten feet
from the building to be able to provide future maintenance without damaging the
building or its foundation. Revised
18. No water service lines will be
allowed off of the 12” main on 6th
Street, Wakarusa
Drive, or Overland Drive. Revised
19. Will the carriage houses require a
separate meter for the rented apartment above the garage? If so, the carriage houses will also require
separate sanitary sewer services. There
does not appear to be adequate room for four separate services per carriage
house lot. Separate
meters are not presently anticipated
-------
12/10/07 Review Comments from Fire
Department of 11/29/07
revised PDP submittal.
1. North bound lane of Champion Drive is
shown as having 18 feet back of curb to back of curb. UFC
902.2.2.1 Requires an unobstructed width of not less than 20 feet. Increase the
lane to 20 feet face of curb to face of curb.
Revised
2. The buildings in block 6 lot 2 will
require fire sprinklers and will need a fire hydrant within 50 feet of the Fire
Department connection for the fire sprinkler system. UFC
appendix IIIB Revised
(note added – sht. 4)
3. They need to add one more fire
hydrant in the residential area in the north east corner. UFC appendix IIIB Revised
-----------------
12/11/07 Review Comments from Parks
Department of 11/29/07
revised PDP submittal.
1. Same comments as 1st
review for sidewalk tree conflict on the many walks to 6th street, can these be
reduced. Plan
revised 7/6/07
per Parks Dept. comments
2. Please show any existing trees to
be preserved and protection root zone with fenced off area. Protection root zone
would be 1 to 1/5 (feet) x the tree diameter measured in inches at DBH (4.5
feet from ground). N/A
3. Need agreement to maintain
roundabout landscaping by private development.
Noted (public r.o.w.)
4. Applicant should consider changing
species or placement of street trees to remove them from under the transmission
power lines. See right plant – right place document (attachment e-mailed to
applicant). Could these be switched with the sidewalk locations in some areas
to make room to plant the trees? Species revised 3/21/07 per Parks Dept. comments
IN CLOSING
There are
several technical and/or policy related issues with which the applicant and
staff can not agree. Staff has been very attentive to reviewing the several
revisions in a timely manner, but none have adequately addressed the
outstanding issues.
We agree
with the closing statement above, although we believe all outstanding issues
have been adequately addressed.