City
of |
Central
Maintenance Garage |
|
MEMORANDUM |
DATE: |
01/24/2008 |
TO: |
David
Corliss, City Manager |
CC: |
Cynthia
Boecker, Diane
Stoddard, Jonathan
Douglass, Asst. to the City Manager Charles
Soules, Director of Public Works Tammy
Bennett, Asst. Director of Public Works Bob
Yoos, Solid Waste Manager |
FROM: |
Steve
Stewart, Fleet Manager |
|
|
RE: |
Refuse
Truck Repair |
Please
include the following on the City Commission Agenda for consideration at the 01/29/2008
meeting:
Background
Solid
Waste truck unit number 489 caught fire December 8, 2007. The fire was caused
by the engine block heater. The truck was towed to Midway Sterling in
Current Status:
Repairs
have been started to determine the extent of the damage. The estimate for the
repair is $15,147.90. This includes all labor, components and core charges.
Some components are rebuildable if their cores are not damaged beyond repair.
If the cores are accepted by the rebuilder then our cost will be reduced. This
repair could be completed in the next two weeks.
Funding:
The repairs will be funded
through the repair budget of Commercial Solid Waste division.
Action Request:
Approve repair
costs up to $15,147.90 for Solid Waste Truck unit number 489.