CITY
OF LAWRENCE |
|
|
|
|
|
|
|
|
|
|
|
|
|
City Bid No. B07053 |
|
|
|
Project 15-CP3-406(BD) |
|
|
|
Stoneridge Drive, 6th
Street to Silverstone Drive |
|
|
|
|
BID TAB |
|
|
|
September 11, 2007 |
|
|
|
Engineer's Estimate: $385,412.50 |
|
|
|
|
|
|
R. D. Johnson Excavating, Inc. |
King's Construction Co,
Inc. |
LRM Industries, Inc. |
Amino Brothers Co., Inc. |
D. F. Freeman Contractors,
Inc. |
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
1 |
Clearing and
Grubbing |
L.S. |
1 |
$
6,121.79 |
$ 6,121.79 |
$
7,500.00 |
$ 7,500.00 |
$
5,350.00 |
$ 5,350.00 |
$
7,050.00 |
$ 7,050.00 |
$
9,975.00 |
$ 9,975.00 |
2 |
Removal of
Existing Structures |
L.S. |
1 |
$
7,100.00 |
$ 7,100.00 |
$
2,500.00 |
$ 2,500.00 |
$
6,450.00 |
$ 6,450.00 |
$
12,325.00 |
$ 12,325.00 |
$
13,920.00 |
$ 13,920.00 |
3 |
Unclassified
Excavation |
C.Y. |
2,362 |
$ 7.30 |
$ 17,242.60 |
$ 4.00 |
$ 9,448.00 |
$
7.00 |
$ 16,534.00 |
$
14.80 |
$
34,957.60 |
$
26.50 |
$ 62,593.00 |
4 |
Compaction (90%) |
C.Y. |
1,222 |
$ 1.50 |
$ 1,833.00 |
$ 1.50 |
$ 1,833.00 |
$
1.60 |
$ 1,955.20 |
$
1.00 |
$ 1,222.00 |
$
1.50 |
$ 1,833.00 |
5 |
Compaction (95%) |
C.Y. |
975 |
$ 1.50 |
$ 1,462.50 |
$ 1.50 |
$ 1,462.50 |
$
1.60 |
$ 1,560.00 |
$
2.00 |
$ 1,950.00 |
$
2.00 |
$ 1,950.00 |
6 |
9" Fly Ash
Stabilization |
S.Y. |
3,899 |
$ 3.60 |
$ 14,036.40 |
$ 4.00 |
$ 15,596.00 |
$
3.70 |
$ 14,426.30 |
$
5.79 |
$ 22,575.21 |
$
4.73 |
$ 18,442.27 |
7 |
Asphalt
Surfacing (Surface Course) (BM-2) |
TON |
342 |
$
49.00 |
$ 16,758.00 |
$
51.70 |
$ 17,681.40 |
$
49.90 |
$ 17,065.80 |
$
53.89 |
$ 18,430.38 |
$
52.40 |
$ 17,920.80 |
8 |
Asphalt Surfacing (Base
Course) (BM-2B) |
TON |
1,556 |
$
45.50 |
$ 70,798.00 |
$
48.05 |
$ 74,765.80 |
$
43.90 |
$ 68,308.40 |
$
47.41 |
$ 73,769.96 |
$
46.09 |
$ 71,716.04 |
9 |
6" Concrete
Entrance Pavement (Reinforced) (A.E.) |
S.Y. |
160.2 |
$
39.90 |
$ 6,391.98 |
$
39.32 |
$ 6,299.06 |
$
42.00 |
$ 6,728.40 |
$
47.02 |
$ 7,532.60 |
$
61.00 |
$ 9,772.20 |
10 |
6" Stamped,
Colored Concrete (Reinforced) (A.E.) |
S.Y. |
123 |
$
48.50 |
$ 5,965.50 |
$
70.00 |
$ 8,610.00 |
$
56.00 |
$ 6,888.00 |
$
94.82 |
$ 11,662.86 |
$
136.50 |
$ 16,789.50 |
11 |
Concrete Curb
and Gutter (A.E.) |
L.F. |
2,224.8 |
$ 8.95 |
$ 19,911.96 |
$
12.18 |
$ 27,098.06 |
$
13.00 |
$
28,922.40 |
$
14.71 |
$ 32,726.81 |
$
13.00 |
$
28,922.40 |
12 |
4" Concrete
Sidewalk (A.E.) |
S.Y. |
435.2 |
$
21.90 |
$ 9,530.88 |
$
27.30 |
$ 11,880.96 |
$
26.00 |
$ 11,315.20 |
$
32.81 |
$ 14,278.91 |
$
32.50 |
$ 14,144.00 |
13 |
6" Concrete
Sidewalk (Fiber Reinforced) (A.E.) |
S.Y. |
964.9 |
$
36.35 |
$ 35,074.12 |
$
33.60 |
$
32,420.64 |
$
36.00 |
$
34,736.40 |
$
38.28 |
$ 36,936.37 |
$
36.00 |
$
34,736.40 |
14 |
6' Access Ramp |
EACH |
1 |
$
945.00 |
$ 945.00 |
$
1,155.00 |
$ 1,155.00 |
$
460.00 |
$ 460.00 |
$
1,262.00 |
$ 1,262.00 |
$
2,250.00 |
$ 2,250.00 |
15 |
10' Access Ramp |
EACH |
3 |
$
1,809.00 |
$ 5,427.00 |
$
1,496.25 |
$ 4,488.75 |
$
875.00 |
$ 2,625.00 |
$
2,054.00 |
$ 6,162.00 |
$
1,900.00 |
$ 5,700.00 |
16 |
10' Access Ramp
without detectable warnings |
EACH |
2 |
$
1,500.00 |
$ 3,000.00 |
$
1,155.00 |
$ 2,310.00 |
$
350.00 |
$ 700.00 |
$
1,296.00 |
$ 2,592.00 |
$
850.00 |
$ 1,700.00 |
17 |
Woven Wire Type
B Fence |
L.F. |
304 |
$
31.50 |
$ 9,576.00 |
$
10.00 |
$ 3,040.00 |
$
20.00 |
$ 6,080.00 |
$
20.13 |
$ 6,119.52 |
$
18.38 |
$ 5,587.52 |
18 |
Concrete Manhole
Collar |
EACH |
1 |
$
430.00 |
$ 430.00 |
$
250.00 |
$ 250.00 |
$
900.00 |
$ 900.00 |
$
651.00 |
$ 651.00 |
$
1,500.00 |
$ 1,500.00 |
19 |
5' x 4' Standard
Curb Inlet |
EACH |
1 |
$
2,720.00 |
$ 2,720.00 |
$
2,442.00 |
$ 2,442.00 |
$
2,950.00 |
$ 2,950.00 |
$
3,490.00 |
$ 3,490.00 |
$
3,500.00 |
$ 3,500.00 |
20 |
15" Storm
Sewer (RCP) (In Place) |
L.F. |
14 |
$
93.70 |
$ 1,311.80 |
$
45.00 |
$ 630.00 |
$
86.00 |
$ 1,204.00 |
$
111.50 |
$ 1,561.00 |
$
135.00 |
$ 1,890.00 |
21 |
12" Storm
Sewer (CMP) (In Place) |
L.F. |
28 |
$
36.70 |
$ 1,027.60 |
$
20.00 |
$ 560.00 |
$
38.00 |
$ 1,064.00 |
$
79.00 |
$ 2,212.00 |
$
46.00 |
$ 1,288.00 |
22 |
12" End Section (CM) |
EACH |
2 |
$
250.00 |
$ 500.00 |
$
112.35 |
$ 224.70 |
$
350.00 |
$ 700.00 |
$
580.00 |
$ 1,160.00 |
$
175.00 |
$ 350.00 |
23 |
Connect to Existing Storm Sewer |
EACH |
1 |
$
470.00 |
$ 470.00 |
$
500.00 |
$ 500.00 |
$
150.00 |
$ 150.00 |
$
1,480.00 |
$ 1,480.00 |
$
828.00 |
$ 828.00 |
24 |
12" D.I.
Waterline (In Place) |
L.F. |
616 |
$
38.00 |
$ 23,408.00 |
$
44.10 |
$
27,165.60 |
$
43.00 |
$ 26,488.00 |
$
76.68 |
$
47,234.88 |
$
71.00 |
$ 43,736.00 |
25 |
12" M.J.
Gate Valve |
EACH |
4 |
$
1,600.00 |
$ 6,400.00 |
$
1,401.75 |
$ 5,607.00 |
$
1,350.00 |
$ 5,400.00 |
$
1,814.40 |
$ 7,257.60 |
$
1,575.00 |
$ 6,300.00 |
26 |
8" M.J.
Gate Valve |
EACH |
1 |
$
980.00 |
$ 980.00 |
$
756.00 |
$ 756.00 |
$
750.00 |
$ 750.00 |
$
972.00 |
$ 972.00 |
$
850.00 |
$ 850.00 |
27 |
Standard Fire
Hydrant Setting |
EACH |
2 |
$
2,375.00 |
$ 4,750.00 |
$
2,089.00 |
$ 4,178.00 |
$
2,000.00 |
$ 4,000.00 |
$
3,834.00 |
$ 7,668.00 |
$
3,325.00 |
$ 6,650.00 |
28 |
Connect to
Existing Waterline |
EACH |
2 |
$
368.00 |
$ 736.00 |
$
637.35 |
$ 1,274.70 |
$
625.00 |
$ 1,250.00 |
$
702.00 |
$ 1,404.00 |
$
600.00 |
$ 1,200.00 |
29 |
Remove and Reset
Sign |
EACH |
1 |
$
185.00 |
$ 185.00 |
$
194.25 |
$ 194.25 |
$
190.00 |
$ 190.00 |
$
231.25 |
$ 231.25 |
$
194.25 |
$ 194.25 |
30 |
Permanent Sign |
EACH |
3 |
$
237.50 |
$ 712.50 |
$
249.38 |
$ 748.14 |
$
250.00 |
$ 750.00 |
$
296.88 |
$ 890.64 |
$
249.38 |
$ 748.14 |
31 |
Pavement Marking (White)
(6") |
L.F. |
324 |
$ 1.65 |
$ 534.60 |
$ 1.73 |
$ 560.52 |
$
1.70 |
$ 550.80 |
$
2.07 |
$ 670.68 |
$
1.73 |
$ 560.52 |
32 |
Pavement Marking
(White) (24") |
L.F. |
174 |
$
14.00 |
$ 2,436.00 |
$
14.70 |
$ 2,557.80 |
$
14.00 |
$ 2,436.00 |
$
17.50 |
$ 3,045.00 |
$
14.70 |
$ 2,557.80 |
33 |
Pavement Marking
(Yellow) (4") |
L.F. |
666 |
$ 1.25 |
$ 832.50 |
$ 1.31 |
$ 872.46 |
$
1.50 |
$ 999.00 |
$
1.57 |
$ 1,045.62 |
$
1.31 |
$ 872.46 |
34 |
Pavement Marking
Sysbol (White) (LT Arrow) |
EACH |
4 |
$
175.00 |
$ 700.00 |
$
183.75 |
$ 735.00 |
$
180.00 |
$ 720.00 |
$
218.75 |
$ 875.00 |
$
183.75 |
$ 735.00 |
35 |
Pavement Marking
Symbol (White) (Lane-Reduction Arrow) |
EACH |
2 |
$
250.00 |
$ 500.00 |
$
262.50 |
$ 525.00 |
$
250.00 |
$ 500.00 |
$
312.50 |
$ 625.00 |
$
262.50 |
$ 525.00 |
36 |
Silt Fence |
L.F. |
1,486 |
$ 1.90 |
$ 2,823.40 |
$ 1.35 |
$ 2,006.10 |
$
1.75 |
$ 2,600.50 |
$
2.50 |
$ 3,715.00 |
$
2.00 |
$ 2,972.00 |
37 |
Temporary
Construction Entrance |
EACH |
1 |
$
1,050.00 |
$ 1,050.00 |
$
500.00 |
$ 500.00 |
$
1,250.00 |
$ 1,250.00 |
$
2,500.00 |
$ 2,500.00 |
$
2,000.00 |
$ 2,000.00 |
38 |
Temporary
Seeding |
L.S. |
1 |
$
1,633.00 |
$ 1,633.00 |
$
1,260.00 |
$ 1,260.00 |
$
750.00 |
$ 750.00 |
$
3,360.00 |
$ 3,360.00 |
$
2,940.00 |
$ 2,940.00 |
39 |
Traffic Control |
L.S. |
1 |
$
2,700.00 |
$ 2,700.00 |
$
2,835.00 |
$ 2,835.00 |
$
3,900.00 |
$ 3,900.00 |
$
3,375.00 |
$ 3,375.00 |
$
2,835.00 |
$ 2,835.00 |
40 |
Construction Staking |
L.S. |
1 |
$
3,230.00 |
$ 3,230.00 |
$
3,150.00 |
$ 3,150.00 |
$
3,100.00 |
$ 3,100.00 |
$
3,800.00 |
$ 3,800.00 |
$
3,255.00 |
$ 3,255.00 |
41 |
Seeding,
Fertilizing and Mulching |
L.S. |
1 |
$
2,650.00 |
$ 2,650.00 |
$
1,620.00 |
$ 1,620.00 |
$
2,000.00 |
$ 2,000.00 |
$
5,400.00 |
$ 5,400.00 |
$
4,725.00 |
$ 4,725.00 |
42 |
Mobilization |
L.S. |
1 |
$
2,500.00 |
$ 2,500.00 |
$
7,500.00 |
$ 7,500.00 |
$
5,185.00 |
$ 5,185.00 |
$
20,990.00 |
$ 20,990.00 |
$
18,099.00 |
$ 18,099.00 |
|
GRAND TOTAL |
|
$ 296,395.13 |
|
$ 296,741.44 |
|
$ 299,892.40 |
|
$ 417,166.89 |
|
$ 429,063.30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|