Memorandum

City of Lawrence

Department of Public Works

 

TO:

David L. Corliss, Debbie Van Saun

FROM:

Shoeb Uddin

CC:

Chuck Soules, Matt Bond, Dena Mezger, David Woosley

Date:

August 15, 2007

RE:

August 23, 2007 Consent Agenda Item

Engineering Services - Contract for Design Plans and Specifications

Project 14-CP4-407(BD), GWW, 6th Street to Overland Drive

Project 15-CP5-407(BD), GWW, Overland Drive to North City Limits

 

Please include the following item on the City Commission consent agenda for consideration at the August 23, 2007 meeting.

Engineering Services Contract.  

Project 14-CP4-407(BD), GWW, 6th Street to Overland Drive (Fees: $96,789.60)

Project 15-CP5-407(BD), GWW, Overland Drive to North City Limits (Fees: $91,113.90)

Total Fees for Engineering Services: $187,903.50

The scope of the Engineering services contract includes preparation of Engineering Design plans for construction of roadways, sidewalks, recreational paths, storm water drainage system,  intersections, water lines,  and other miscellaneous work. The scope of services for this contract will not include the design of traffic signals and accessories at the intersection of 6th and GWW.

 

Project Details

This project consists of two separate benefit districts as described below.

 

GWW North of 6th Street: Project No. 14-CP4-407 (BD)

George Williams Way, north of 6th Street is a minor arterial street which provides access to the Mercato and Oregon Trail developments, the Graham property, and possible future development to the north.  A 10’ wide recreational path and a 6’ sidewalk should be constructed for pedestrians and bicyclists. Other infrastructure improvements include the extension of a 12” waterline.

 

GWW North of Overland Drive: Project No. 15-CP5-407 (BD)

This portion of GWW is a two lane section with no access and will accommodate future traffic. Improvements include sidewalk, recreational path, storm drainage system and waterline.

 

Project History / Status

On May 15, 2007 the City Commission approved Resolution 6665 ordering the improvement of GWW, Overland Drive to the N. City Limit, and Resolution 6661 ordering the improvement of GWW, 6th Street to Overland Drive, to be completed. 

 

The benefit district, south of 6th street, extending from 6th street to Ken Ridge Drive, has been dissolved due to property owner’s protest. Therefore, the geometric improvements of GWW between 6th and Ken Ridge Drive will not go forward at this time. However, the intersection improvements at 6th and GWW will be carried out by forming another benefit district.

 

 

 

Project Funding

Total Project Cost (GWW north of 6th Street to Overland Drive):            $2,988,500.00

Total Project Cost (GWW north of Overland Drive to north city limit):      $1,765,000.00

Total project cost for both benefit districts:                                        $4,753,500.00

 

Both projects are being funded by benefit districts, with city’s total share in the amount of $200,000.00 

 

Action RequestedStaff requests approval from the City Commission to authorize the City Manager to enter into an Engineering Contract with BG Consultants, Inc. for a total fee of $187,903.50 for completion of construction plans and specifications for the proposed improvements of George Williams Way (from 6th Street to north City Limit).

 

Respectfully submitted,

 

Shoeb Uddin, P.E.