CITY
OF LAWRENCE |
|
|
|
|
|
|
|
|
|
City Bid No. B07037 |
|
|
|
Project 10-SR5-307(C) |
|
|
|
2007 Overlay &
Curb Repair Program, Phase 2 |
|
|
BID TAB |
|
|
|
June 19, 2007 |
|
|
|
Engineer's Estimate
$1,233,297.25 |
|
|
|
|
|
|
LRM Industries |
R. D. Johnson |
|
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
1 |
Milling
(2") |
SY |
55,372 |
$
1.25 |
$ 69,215.00 |
$
1.70 |
$ 94,132.40 |
|
|
2 |
Asphaltic
Concrete Overlay Surface Course (2") |
TONS |
6,609 |
$
42.95 |
$ 283,856.55 |
$
43.75 |
$ 289,143.75 |
|
|
3 |
Asphaltic
Concrete Overlay Leveling Course |
TONS |
383 |
$
51.60 |
$ 19,762.80 |
$
43.75 |
$ 16,756.25 |
|
|
4 |
Asphaltic
Concrete Pavement Patch (full depth) * |
TONS |
150 |
$
99.50 |
$ 14,925.00 |
$
98.00 |
$ 14,700.00 |
|
|
5 |
Concrete
Pavement Patch (full depth) * |
SY |
445 |
$
74.35 |
$ 33,085.75 |
$
61.50 |
$ 27,367.50 |
|
|
6 |
6"
Concrete Pavement (Reinforced) |
SY |
1,314 |
$
43.95 |
$ 57,750.30 |
$
48.80 |
$
64,123.20 |
|
|
7 |
8"
Concrete Pavement (Reinforced) |
SY |
226 |
$
54.90 |
$ 12,407.40 |
$
59.80 |
$ 13,514.80 |
|
|
8 |
10"
Concrete Pavement (Unreinforced) w/ Integral Curb & Ramps |
SY |
539 |
$
83.80 |
$ 45,168.20 |
$
75.20 |
$
40,532.80 |
|
|
9 |
24"
Concrete Curb & Gutter (8" toe) |
LF |
11,600 |
$
18.75 |
$ 217,500.00 |
$
17.20 |
$ 199,520.00 |
|
|
10 |
30"
Concrete Curb & Gutter (8" toe) |
LF |
10,390 |
$
20.80 |
$ 216,112.00 |
$
19.40 |
$ 201,566.00 |
|
|
11 |
4"
Concrete Sidewalk |
SY |
19 |
$
37.85 |
$ 719.15 |
$
44.70 |
$ 849.30 |
|
|
12 |
Concrete
Access Ramp |
EACH |
4 |
$
575.00 |
$ 2,300.00 |
$
690.00 |
$ 2,760.00 |
|
|
13 |
Existing
Curb Inlet Removal |
EACH |
4 |
$
475.00 |
$ 1,900.00 |
$
790.00 |
$ 3,160.00 |
|
|
14 |
Install
6'x4' Curb Inlet |
EACH |
4 |
$
3,000.00 |
$ 12,000.00 |
$
3,260.00 |
$ 13,040.00 |
|
|
15 |
24"
Reinforced Concrete Pipe |
LF |
40 |
$
52.70 |
$ 2,108.00 |
$
126.00 |
$ 5,040.00 |
|
|
16 |
Driveway
Wedge * |
SY |
487 |
$
10.50 |
$ 5,113.50 |
$
10.00 |
$ 4,870.00 |
|
|
17 |
Crackfilling
* |
|
|
|
|
|
|
|
|
|
a) up to 1" width |
LF |
15,875 |
$
0.50 |
$ 7,937.50 |
$
0.65 |
$ 10,318.75 |
|
|
|
b) greater than 1" width |
LF |
2,800 |
$
0.50 |
$ 1,400.00 |
$
1.00 |
$ 2,800.00 |
|
|
18 |
Manhole
Adjustment |
EACH |
5 |
$
450.00 |
$ 2,250.00 |
$
405.00 |
$ 2,025.00 |
|
|
19 |
Valve
Adjustment |
EACH |
3 |
$
205.00 |
$ 615.00 |
$
260.00 |
$ 780.00 |
|
|
20 |
Cold
Plastic Reflectorized Pavement Marking |
|
|
|
|
|
|
|
|
|
a) 6" Dotted White Lane Line |
LF |
98 |
$
3.15 |
$ 308.70 |
$
3.20 |
$ 313.60 |
|
|
|
b) 6" Solid White Channelization Line |
LF |
33 |
$
3.15 |
$ 103.95 |
$
3.20 |
$ 105.60 |
|
|
|
c) 24" Solid White Stop Line |
LF |
45 |
$
8.40 |
$ 378.00 |
$
10.00 |
$ 450.00 |
|
|
|
d) 36" Solid White Crosswalk Line |
LF |
174 |
$
11.50 |
$ 2,001.00 |
$
12.00 |
$ 2,088.00 |
|
|
|
e) Left Turn Lane - Use Arrow |
EACH |
27 |
$
240.00 |
$ 6,480.00 |
$
225.00 |
$ 6,075.00 |
|
|
|
f) Right Turn Lane - Use Arrow |
EACH |
1 |
$
240.00 |
$ 240.00 |
$
250.00 |
$ 250.00 |
|
|
|
g) 4" Broken Yellow Lane Line |
LF |
2,160 |
$
2.10 |
$ 4,536.00 |
$
1.95 |
$ 4,212.00 |
|
|
|
h) 4" Solid Yellow Lane Line |
LF |
8,710 |
$
2.10 |
$ 18,291.00 |
$
1.95 |
$ 16,984.50 |
|
|
|
i) 4" Solid Double Yellow Lane Line ** |
LF |
305 |
$
4.20 |
$ 1,281.00 |
$
4.10 |
$ 1,250.50 |
|
|
|
j) 6" Broken Yellow Lane Line |
LF |
530 |
$
3.15 |
$ 1,669.50 |
$
4.00 |
$ 2,120.00 |
|
|
|
k) 12" Solid Yellow Diagonal Line |
LF |
50 |
$
6.30 |
$ 315.00 |
$
12.00 |
$ 600.00 |
|
|
21 |
Heat Fused Preformed
Thermoplastic Pavement Marking |
|
|
|
|
|
|
|
|
|
a) 6" Solid White Channelization Line |
LF |
206 |
$
2.10 |
$ 432.60 |
$
1.00 |
$ 206.00 |
|
|
|
b) 12" Solid White Chevron Line |
LF |
60 |
$
6.30 |
$ 378.00 |
$
5.00 |
$ 300.00 |
|
|
|
c) 24" Solid White Stop Line |
LF |
74 |
$
8.40 |
$ 621.60 |
$
10.00 |
$ 740.00 |
|
|
|
d) 36" Solid White Crosswalk Line |
LF |
186 |
$
12.60 |
$ 2,343.60 |
$
12.00 |
$ 2,232.00 |
|
|
|
e) Left Turn Lane - Use Arrow |
EACH |
1 |
$
210.00 |
$ 210.00 |
$
200.00 |
$ 200.00 |
|
|
|
f) Right Turn Lane - Use Arrow |
EACH |
1 |
$
210.00 |
$ 210.00 |
$
200.00 |
$ 200.00 |
|
|
22 |
Traffic Signal Loop |
EACH |
5 |
$
1,260.00 |
$ 6,300.00 |
$
1,200.00 |
$ 6,000.00 |
|
|
23 |
Asphalt Test Core |
EACH |
13 |
$
70.50 |
$ 916.50 |
$
60.00 |
$ 780.00 |
|
|
24 |
Temporary Surfacing * |
TONS |
400 |
$
19.15 |
$ 7,660.00 |
$
19.00 |
$ 7,600.00 |
|
|
25 |
Seed, Fertilize,
& Mulch |
LS |
1 |
$
9,850.00 |
$ 9,850.00 |
$
14,760.00 |
$ 14,760.00 |
|
|
26 |
Traffic Control |
N/A |
1 |
force account |
$ 40,000.00 |
force account |
$
40,000.00 |
|
|
|
|
|
TOTAL |
|
$ 1,110,652.60 |
|
$ 1,114,466.95 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|