CITY OF LAWRENCE 
City Bid No. B07037
Project 10-SR5-307(C)
2007 Overlay & Curb Repair Program, Phase 2
BID TAB
June 19, 2007
Engineer's Estimate $1,233,297.25
        LRM Industries R. D. Johnson
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
1 Milling (2") SY 55,372  $            1.25  $                69,215.00  $            1.70  $        94,132.40
2 Asphaltic Concrete Overlay Surface Course (2") TONS 6,609  $          42.95  $             283,856.55  $          43.75  $     289,143.75
3 Asphaltic Concrete Overlay Leveling Course TONS 383  $          51.60  $                19,762.80  $          43.75  $        16,756.25
4 Asphaltic Concrete Pavement Patch (full depth) * TONS 150  $          99.50  $                14,925.00  $          98.00  $        14,700.00
5 Concrete Pavement Patch (full depth) * SY 445  $          74.35  $                33,085.75  $          61.50  $        27,367.50
6 6" Concrete Pavement (Reinforced) SY 1,314  $          43.95  $                57,750.30  $          48.80  $        64,123.20
7 8" Concrete Pavement (Reinforced) SY 226  $          54.90  $                12,407.40  $          59.80  $        13,514.80
8 10" Concrete Pavement (Unreinforced) w/ Integral Curb & Ramps SY 539  $          83.80  $                45,168.20  $          75.20  $        40,532.80
9 24" Concrete Curb & Gutter (8" toe) LF 11,600  $          18.75  $             217,500.00  $          17.20  $     199,520.00
10 30" Concrete Curb & Gutter (8" toe) LF 10,390  $          20.80  $             216,112.00  $          19.40  $     201,566.00
11 4" Concrete Sidewalk SY 19  $          37.85  $                     719.15  $          44.70  $             849.30
12 Concrete Access Ramp EACH 4  $        575.00  $                  2,300.00  $       690.00  $          2,760.00
13 Existing Curb Inlet Removal EACH 4  $        475.00  $                  1,900.00  $       790.00  $          3,160.00
14 Install 6'x4' Curb Inlet EACH 4  $     3,000.00  $                12,000.00  $    3,260.00  $        13,040.00
15 24" Reinforced Concrete Pipe LF 40  $          52.70  $                  2,108.00  $       126.00  $          5,040.00
16 Driveway Wedge * SY 487  $          10.50  $                  5,113.50  $          10.00  $          4,870.00
17 Crackfilling *            
  a)  up to 1" width LF 15,875  $            0.50  $                  7,937.50  $            0.65  $        10,318.75
  b)  greater than 1" width LF 2,800  $            0.50  $                  1,400.00  $            1.00  $          2,800.00
18 Manhole Adjustment EACH 5  $        450.00  $                  2,250.00  $       405.00  $          2,025.00
19 Valve Adjustment EACH 3  $        205.00  $                     615.00  $       260.00  $             780.00
20 Cold Plastic Reflectorized Pavement Marking            
  a)  6" Dotted White Lane Line  LF  98  $            3.15  $                     308.70  $            3.20  $             313.60
  b)  6" Solid White Channelization Line  LF  33  $            3.15  $                     103.95  $            3.20  $             105.60
  c)  24" Solid White Stop Line  LF  45  $            8.40  $                     378.00  $          10.00  $             450.00
  d)  36" Solid White Crosswalk Line  LF  174  $          11.50  $                  2,001.00  $          12.00  $          2,088.00
  e)  Left Turn Lane - Use Arrow  EACH  27  $        240.00  $                  6,480.00  $       225.00  $          6,075.00
  f)  Right Turn Lane - Use Arrow EACH 1  $        240.00  $                     240.00  $       250.00  $             250.00
  g)  4" Broken Yellow Lane Line LF 2,160  $            2.10  $                  4,536.00  $            1.95  $          4,212.00
  h)  4" Solid Yellow Lane Line LF 8,710  $            2.10  $                18,291.00  $            1.95  $        16,984.50
  i)  4" Solid Double Yellow Lane Line ** LF 305  $            4.20  $                  1,281.00  $            4.10  $          1,250.50
  j)  6" Broken Yellow Lane Line LF 530  $            3.15  $                  1,669.50  $            4.00  $          2,120.00
  k)  12" Solid Yellow Diagonal Line LF 50  $            6.30  $                     315.00  $          12.00  $             600.00
21 Heat Fused Preformed Thermoplastic Pavement Marking            
  a)  6" Solid White Channelization Line LF 206  $            2.10  $                     432.60  $            1.00  $             206.00
  b)  12" Solid White Chevron Line LF 60  $            6.30  $                     378.00  $            5.00  $             300.00
  c)  24" Solid White Stop Line LF 74  $            8.40  $                     621.60  $          10.00  $             740.00
  d)  36" Solid White Crosswalk Line LF 186  $          12.60  $                  2,343.60  $          12.00  $          2,232.00
  e)  Left Turn Lane - Use Arrow EACH 1  $        210.00  $                     210.00  $       200.00  $             200.00
  f)  Right Turn Lane - Use Arrow EACH 1  $        210.00  $                     210.00  $       200.00  $             200.00
22 Traffic Signal Loop EACH 5  $     1,260.00  $                  6,300.00  $    1,200.00  $          6,000.00
23 Asphalt Test Core EACH 13  $          70.50  $                     916.50  $          60.00  $             780.00
24 Temporary Surfacing * TONS 400  $          19.15  $                  7,660.00  $          19.00  $          7,600.00
25 Seed, Fertilize, & Mulch LS 1  $     9,850.00  $                  9,850.00  $  14,760.00  $        14,760.00
26 Traffic Control N/A 1  force account   $                40,000.00  force account   $        40,000.00
      TOTAL    $          1,110,652.60    $  1,114,466.95