City of Lawrence
Project 01-SR1-107(S) - City Bid No. B07039
Iowa Street, 23rd Street to Irving Hill Road Overpass;
Iowa Street, Yale Road to 6th Street
Milling, Overlay, Pavement Marking, Minor Geometric Improvements (KLINK)
BID TAB
Engineer's Estimate:  $650,522.60
Bid Date:  May 22, 2007
IOWA STREET (U.S. 59 HIGHWAY), 23RD STREET TO IRVING HILL ROAD OVERPASS - SECTION 1
        LRM INDUSTRIES, INC ASPHALT IMPROVEMENT CO
Item Description Quantity Unit Unit Price Amount Unit Price Amount
1 Mobilization 1 L.S. 755.00  $              755.00 4000.00  $          4,000.00
2 Milling 2" Depth (P) 28,780 S.Y. 1.02  $        29,355.60 1.26  $        36,262.80
3 Asphaltic Concrete (BM-2) 2" Overlay (P)* 3,325 TON 43.60  $      144,970.00 46.75  $      155,443.75
4 Concrete Pavement Patch (Full Depth) (P)** 300 S.Y. 71.00  $        21,300.00 80.00  $        24,000.00
5 Asphalt Pavement Patch (Full Depth) (P)** 100 TON 99.50  $          9,950.00 98.00  $          9,800.00
6 2'-6" Concrete Curb and Gutter (NP)** 119 L.F. 28.50  $          3,391.50 25.00  $          2,975.00
7 Traffic Control (P) N/A L.S. Force Account  $        15,000.00 Force Account  $        15,000.00
8 Temporary Pavement Marking        $                       -      $                      -  
  a)  4" Broken White (Tape) (P) 1,049 L.F. 0.45  $              472.05 0.50  $             524.50
  b)  4" Broken Yellow (Tape) (P) 566 L.F. 0.45  $              254.70 0.50  $             283.00
9 Permanent Pavement Marking        $                       -      $                      -  
  a)  6" Broken White Lane Line (Class A) (Cold Plastic) (P)  1,900 L.F. 3.10  $          5,890.00 4.20  $          7,980.00
  b)  6" Dotted White Lane Line (Class A) (Cold Plastic) (P) 652 L.F. 3.10  $          2,021.20 4.20  $          2,738.40
  c)  6" Dotted White Lane Line (Class A) (Applied to Existing Pavement) (P) (See General Notes for Information) 32 L.F. 3.10  $                99.20 4.20  $             134.40
  d)  6" Solid White Channelization Line (Class A) (Cold Plastic) (P) 2,818 L.F. 3.10  $          8,735.80 4.20  $        11,835.60
  e)  6" Solid White Edge Line (Class A) (Cold Plastic) (P)  130 L.F. 3.10  $              403.00 4.20  $             546.00
  f)  6" Solid White Edge Line (Class A) (Applied to Existing Pavement) (P)
(See General Notes for Information)
32 L.F. 3.10  $                99.20 4.20  $             134.40
  g)  12" Solid White Chevron Line (Class A) (Cold Plastic) (P) 308 L.F. 6.25  $          1,925.00 8.40  $          2,587.20
  h)  24" Solid White Stop Line (Class A) (Cold Plastic) (P) 157 L.F. 7.25  $          1,138.25 11.55  $          1,813.35
  i)  36" Solid White Crosswalk Line (Class A) (Cold Plastic) (P) 246 L.F. 10.35  $          2,546.10 12.60  $          3,099.60
  j)  4" Broken Yellow Lane Line (Class B) (Cold Plastic) (P) 300 L.F. 2.10  $              630.00 2.10  $             630.00
  k)  4" Solid Yellow Lane Line (Class B) (Cold Plastic) (P) 1,246 L.F. 2.10  $          2,616.60 2.10  $          2,616.60
  l)  4" Solid Double Yellow Lane Line (Class B) (Cold Plastic) (P)*** 3,176 L.F. 4.15  $        13,180.40 4.25  $        13,498.00
  m)  Left Turn Lane--Use Arrow (P)
(See General Notes For Information)
24 EACH 228.00  $          5,472.00 131.25  $          3,150.00
  n)  Right Turn Lane--Use Arrow (P)
(See General Notes For Information)
10 EACH 228.00  $          2,280.00 131.25  $          1,312.50
  o)  Right Turn Lane--Use Arrow (Applied to Existing Pavement) (P)
(See General Notes For Information)
2 EACH 210.00  $              420.00 131.25  $             262.50
10 Storm Sewer Manhole Adjustment (NP)** 8 EACH 500.00  $          4,000.00 650.00  $          5,200.00
11 Loop Detector Installation (P)** 10 EACH 1,200.00  $        12,000.00 1150.00  $        11,500.00
12 Remove and Reconstruct Median Nose at the East Leg of 23rd and Iowa Intersection  (See General Notes and Plan Sheet No. 13 for Information) 1 L.S. 4,160.00  $          4,160.00 2750.00  $          2,750.00
13 Asphalt Test Core (NP)** 8 EACH 70.00  $              560.00 75.00  $             600.00
  GRAND TOTAL - SECTION 1      $      293,625.60    $      320,677.60
 
IOWA STREET (U.S. 59 HIGHWAY), YALE ROAD TO 6TH STREET - SECTION 2
  LRM INDUSTRIES, INC ASPHALT IMPROVEMENT CO.
Item Description Quantity Unit Unit Price Amount Unit Price Amount
1 Mobilization 1 L.S. 755.00  $              755.00 4000.00  $          4,000.00
2 Milling 2" Depth (P) 16,422 S.Y. 1.02  $        16,750.44 1.26  $        20,691.72
3 Asphaltic Concrete (BM-2) 2" Overlay (P)* 1,897 TON 44.25  $        83,942.25 46.75  $        88,684.75
4 Concrete Pavement Patch (Full Depth) (P)** 300 S.Y. 71.00  $        21,300.00 80.00  $        24,000.00
5 Asphalt Pavement Patch (Full Depth) (P)** 100 TON 99.50  $          9,950.00 98.00  $          9,800.00
6 2' Concrete Curb and Gutter (NP)** 12 L.F. 35.50  $              426.00 30.00  $             360.00
7 2'-6" Concrete Curb and Gutter (NP)** 12 L.F. 35.50  $              426.00 32.00  $             384.00
8 Traffic Control (P) N/A L.S. Force Account  $        10,000.00 Force Account  $        10,000.00
9 Temporary Pavement Marking        $                       -      $                      -  
  a)  4" Broken White (Tape) (P) 507 L.F. 0.45  $              228.15 0.50  $             253.50
  b)  4" Broken Yellow (Tape) (P) 514 L.F. 0.45  $              231.30 0.50  $             257.00
10 Permanent Pavement Marking        $                       -      $                      -  
  a)  6" Broken White Lane Line (Class A) (Cold Plastic) (P)  1,130 L.F. 3.10  $          3,503.00 4.20  $          4,746.00
  b)  6" Dotted White Lane Line (Class A) (Cold Plastic) (P) 288 L.F. 3.10  $              892.80 4.20  $          1,209.60
  c)  6" Solid White Channelization Line (Class A) (Cold Plastic) (P) 509 L.F. 3.10  $          1,577.90 4.20  $          2,137.80
  d)  6" Solid White Edge Line (Class A) (Cold Plastic) (P)  733 L.F. 3.10  $          2,272.30 4.20  $          3,078.60
  e)  12" Solid White Diagonal Line (Class A) (Cold Plastic) (P) 50 L.F. 6.25  $              312.50 8.40  $             420.00
  f)  12" Solid White Chevron Line (Class A) (Cold Plastic) (P) 150 L.F. 6.25  $              937.50 8.40  $          1,260.00
  g)  24" Solid White Stop Line (Class A) (Cold Plastic) (P) 118 L.F. 7.25  $              855.50 11.55  $          1,362.90
  h)  36" Solid White Crosswalk Line (Class A) (Cold Plastic) (P) 132 L.F. 10.35  $          1,366.20 12.60  $          1,663.20
  i)  4" Broken Yellow Lane Line (Class B) (Cold Plastic) (P) 440 L.F. 2.10  $              924.00 2.10  $             924.00
  j)  4" Broken Yellow Lane Line (Class B) (Applied to Existing Pavement) (P)
(See General Notes for Information)
20 L.F. 2.10  $                42.00 2.10  $                42.00
  k)  4" Solid Yellow Lane Line (Class B) (Cold Plastic) (P) 1,882 L.F. 2.10  $          3,952.20 2.10  $          3,952.20
  l)  4" Solid Yellow Lane Line (Class B) (Applied to Existing Pavement) (P)  (See General Notes for Information) 20 L.F. 2.10  $                42.00 2.10  $                42.00
  m)  4" Solid Double Yellow Lane Line (Class B) (Cold Plastic) (P)*** 1,354 L.F. 4.15  $          5,619.10 2.10  $          2,843.40
  n)  Left Turn Lane--Use Arrow (P)
(See General Notes for Information)
16 EACH 228.00  $          3,648.00 131.25  $          2,100.00
  o)  Right Turn Lane--Use Arrow (P)
(See General Notes for Information)
3 EACH 228.00  $              684.00 131.25  $             393.75
  p)  Through Lane--Use Arrow (P)
(See General Notes for Information)
2 EACH 200.00  $              400.00 105.00  $             210.00
  q)  "TO" Word Marking (P) 2 EACH 465.00  $              930.00 447.30  $             894.60
  r)  "6TH" Word Marking (P) 1 EACH 465.00  $              465.00 603.90  $             603.90
  s)  "KTA" Word Marking (P) 1 EACH 465.00  $              465.00 603.90  $             603.90
  t)  "I-70" Word Marking (P) 1 EACH 465.00  $              465.00 603.90  $             603.90
  u)  "ST" Word Marking (P) 1 EACH 465.00  $              465.00 447.30  $             447.30
11 Sanitary Sewer Manhole Adjustment (NP)** 2 EACH 500.00  $          1,000.00 650.00  $          1,300.00
12 Water Valve Box Adjustment (NP)** 3 EACH 210.00  $              630.00 260.00  $             780.00
13 Loop Detector Installation (P)** 8 EACH 1,200.00  $          9,600.00 1150.00  $          9,200.00
14 Asphalt Test Core (NP)** 4 EACH 70.00  $              280.00 75.00  $             300.00
  GRAND TOTAL - SECTION 2    $      185,338.14    $      199,550.02
   
GRAND TOTAL - SECTION 1 AND SECTION 2      $478,963.74    $520,227.62