Time requirements of MACPP Bid Process. |
Bid # |
CMG |
Purchasing |
|
|
Spec Meeting
includes travel |
|
4 |
4 |
|
Bid Evalu.Meeting
includes travel |
|
4 |
4 |
|
Util. Eng.
Trucks |
B06052 |
2 |
|
Parks Van |
|
B06061 |
2 |
|
Street- 1 Ton Plow Trucks |
B07009 |
2 |
|
Street- 3/4 Ton Crew Truck |
B07010 |
0.5 |
|
Fire/Med
3/4 Ton Crew Trucks |
B07014 |
1 |
|
Police
Patrol |
|
B07018 |
1 |
|
Finance 1/2
Ton PU |
B070 27 |
0.5 |
|
Water 1/2
Ton PU |
B07028 |
0.5 |
|
Water Eng
Compact PU |
B07029 |
0.5 |
|
Waste Water
Compact Utility |
B07030 |
0.5 |
|
Solid Waste
3/4 Ton Cab & Chassis |
B07031 |
0.5 |
|
|
Total Hours: |
|
19 |
8 |
27 |
|
|
Note:
Times on all of these spreadsheets do not reflect memos for agendas as these
have to be |
done with
either type of bid. |
|
|
|
|
|
|
|
|
|