SUCCESSFUL GRANT APPLICATIONS |
|
|
|
|
||
Source |
Project |
Description |
Amount (non-local share) |
Match requirement (federal or state/local) |
Formula or project basis |
Status |
KDOT Surface Transportation Program (STP) |
Kasold Drive from Peterson Road to the KTA Bridge |
Reconstruction of Kasold to city standard street |
$3,482,085 |
80/20 for construction costs; 100% local for design and property acquisition |
Project |
Bid by State in October 2006 |
Kansas Bridge over the Kansas Turnpike |
Reconstruction of the Kasold Bridge over the Kansas Turnpike. Local portion paid by Douglas County and KTA. |
$2,568,308 |
80/20 for construction costs; 100% local for design and property acquisition |
Project |
Under construction |
|
N 2nd Street and Locust Street |
Geometric improvements to intersection of N 2nd and Locust |
$1,189,020 |
80/20 for construction costs; 100% local for design and property acquisition |
Project |
Bid by the State in October 2007 |
|
West 6th Street from Folks Rd to the SLT |
Reconstruction from two lane street to a four-lane divided road |
$7,100,000 |
80/20 for construction costs, design, property acquisition, and utility relocation |
Project |
Completed May 2006 |
|
KDOT Connecting Link Funding (KLINK) |
Iowa from Irving Hill overpass to Harvard, and 23rd from Harper to east city limits |
Milling, overlay and pavement marking |
$200,000 |
50/50 |
Project |
Completed August 2006 |
Iowa from 6th to Harvard and from Irving Hill Overpass to 23rd |
Milling, overlay and pavement marking |
$200,000 |
50/50 |
Project |
Bid by the City in May 2007 |
|
23rd Street from Iowa to Louisiana |
Milling, overlay and pavement marking |
$200,000 |
50/50 |
Project |
Bid by the City in May 2008 |
|
KDOT Economic Development Funding |
23rd Street, Iowa to Louisiana |
Combining curb cuts at select locations on 23rd Street |
$537,116 |
75/25 for construction costs |
Project |
By by the State in January 2007 |
KDOT Geometric Improvement Funding |
23rd Street and Harper Street |
Add left turn lane on the south leg of the intersection; modify traffic signal |
$173,200 |
80/20 for construction costs; 100% local for design and property acquisition |
Project |
Bid by the State in January 2008 |
KDOT Transportation Enhancement Program (Historic Preservation Category) |
Ohio Street Brick Restoration from 6th to 8th |
Reconstruction of two block section of Ohio as brick street; reset original limestone curbing |
$700,000 |
80/20 for construction costs; 100% local for design and property acquisition |
Project |
Bid by the State in 2008; design firm not selected to date |
KDOT administered Federal Consolidated Planning Grant |
2006 Unified Planning Work Program (awarded 12/2005, amended 9/2006 |
Funding for federally mandated transportation planning process |
$233,967 |
80/20 |
Formula |
Current for CY2006 |
KDHE Solid Waste Implementation Grants |
Compost Screener Equipment |
Purchase of a compost screen to be used on the compost processing site |
$85,000 |
60/40 |
Project |
Bid completed; delivery expected in October 2006 |
Household Hazardous Waste Storage Building |
Household hazardous waste storage building as an addition to the site located at Douglas County Public Works yard |
$33,689 |
60/40 |
Project |
Completed |
|
KSHS Historic Preservation Fund |
Intern 2005 |
Historic preservation planning intern |
$11,850 |
60/40 |
Project |
Closeout 10/26/06; reimbursement in Nov. |
Intern 2006 |
Historic preservation planning intern |
$12,728 |
60/40 |
Project |
Open |
|
Oread National Register Historic District |
National Register Historic of Historic Places Distirct Nomination for a portion of the Oread Neighborhood |
$8,213 |
60/40 |
Project |
Closeout 10/26/06; reimbursement in Nov. |
|
State Historic Preservation Conference |
Kansas State Historic Preservation Conference |
$21,073 |
50/50 |
Project |
Closeout 10/26/06; reimbursement in Nov. |
|
Downtown Design Guidelines |
Revision of the Downtown Design Guidelines to include the review of projects located in the UCO as well as the National Register Historic District |
$10,200 |
60/40 |
Project |
Development of RFP to be reviewed November, released mid November, Out 30 days, Consultant selected by end of December. Jan-July Public Meetings and draft document. Grant complete by September/October |
|
Save America's Treasures Project |
Carnegie Rehabilitation |
Rehabilitation of the existing building |
$98,768 |
50/50 |
Project |
Consultant is working on construction documents and applications for the State Tax Credit and the NPS review. Documents to be submitted in November. |
US Department of Justice |
Bulletproof Vest Partnership |
Funds for the replacement of bulletproof vests |
$48,090 |
50/50 |
Formula |
$510.67 remains open |
US Department of Justice |
Edward Byrne Memorial Justice Assistance |
Establish and maintain investigations forensic video analysis lab |
$2,625 |
25/75 |
Formula |
2006 funding remains open |
National Highway Safety Administration |
Lawrence Police Department STEP Grant (Traffic Enforcement) |
Reimbursement for special traffic enforcement checklanes, saturation patrol, seatbelt enforcement, etc. |
$24,000 |
None |
Formula |
2006 Open; 2007 Pending |
Federal Aviation Administration |
Lawrence Municipal Airport Taxiway Construction |
Construction of new taxiway "D" adjacent to runway 1-19. Existing taxiway "D" will be removed. Also directional lighting enhancements. |
$1,480,747 |
90/10 |
Project |
Under construction |
US Fire Administration and FEMA |
Purchase of Emergency Generators |
Purchase of 4 emergency generators (one for each station except #5, which is already equipped with one) |
$73,696 |
70/30 |
Project |
In progress |