PLANNING COMMISSION REPORT
CONSENT AGENDA – NON-PUBLIC
HEARING ITEM:
PC Staff Report
ITEM
NO. 5: FINAL PLAT FOR STEPHENS-NOLLER ADDITION; SW CORNER
OF
SUMMARY
PF-07-18-06: Final Plat for
Stephens-Noller Addition, a one lot industrial subdivision. The property is
located on the SW corner of Research Park Drive & Bob
STAFF RECOMMENDATION: Staff recommends approval of the Final Plat of Stephens-Noller
Addition and forwarding it to the City Commission with a recommendation for
acceptance of easements and rights-of-way subject to the following conditions: 1.
Provision of a revised Final Plat with the
following changes: a.
Cross access easement shown from the access point
on 2.
Execution of a Temporary Utility Agreement; 3.
Provision of the following fees and recording
documentation: a.
Copy of paid property tax receipt; b.
Recording
fees made payable to the Douglas County Register of Deeds; c.
Completed
|
Applicant’s Reason for Request: |
Subdivision requirement prior to submittal
of a site plan for office development. |
KEY
POINTS ·
Platting is preparatory to development on site. |
SUBDIVISION
CITATIONS TO CONSIDER ·
No unusual or special citations have been
identified with the review of this application. The application is generally
compliant with Section 21-601. |
ASSOCIATED
CASES/OTHER ACTION REQUIRED ·
Preliminary Plat of Oread West, approved by the
Planning Commission on ·
Revised Preliminary Plat of Oread West, approved
by the Planning Commission on ·
The Final Plat of BobWhite
Addition, was approved in September of 2000. In this plat, Lot 1 Block 7 of
the Preliminary Plat of Oread West was divided and the west 1.605 acre was
platted as the Bobwhite Addition directly west of this property. ·
Acceptance of the dedication of any easements
and right-of-way by the City Commission. ·
Recordation of final plat at the Douglas County
Register of Deeds Office. ·
A site plan, SP-06-57-06, has been submitted for
review and approval. |
PUBLIC COMMENT RECEIVED PRIOR TO PRINTING ·
Public comment was received
regarding the future development of this site. The neighbor to the southwest
was concerned with the impact development of this site would have on
stormwater in the area and with compliance with the greenspace requirement of
an ‘Alvamar Masterplan’
the previous developer of the property had drafted. The City Stormwater
Engineer approved the drainage study and will place conditions upon the
future development’s site plan to manage stormwater. The property owner was
referred to the Douglas County Register of Deeds, where the ‘Alvamar Masterplan’ may have
been recorded, being a private agreement. |
GENERAL INFORMATION |
||
Current Zoning and Land Use: |
IBP (Industrial/Business Park) District;
undeveloped, partially wooded land. |
|
Surrounding Zoning and Land Use: |
IBP
(Industrial/Business Park) District in all directions; undeveloped, partially
wooded land to the west and south, offices and research facilities to the
north and east. RS10
(Single-Dwelling Residential) District to the southwest; low density,
single-family homes. |
|
Site Summary
|
||
Number of Lots: |
1 |
|
Gross Area: |
2.678 Acres |
|
Net Area: |
2.678 Acres |
|
Rights-of-way: |
No new right-of-way to be dedicated with this plat. |
|
|
|
|
STAFF REVIEW
The request is for Final Plat approval of the Stephens-Noller Addition,
which is a one-lot industrially zoned subdivision containing approximately
2.678 acres. This property is a wooded lot located at the southwest corner of
Streets and Access
Access will be provided from
A note has been placed on the face of the plat regarding these access
restrictions and they have been shown graphically with hatch marks.
Utilities and Infrastructure
Utilities are present in the area and should be available for this
development. Water line plans must be provided. These plans must be submitted
for approval and signatures from the Fire and Utilities departments before
building permits are issued. The developer is verifying the location of
existing sanitary sewer along the north property line and has provided a 10’
utility easement along the front property line. AT&T lines are located
along
Easements
A site plan proposing construction of two buildings on the lot has been
submitted. To insure access to Research Park Drive for both buildings, a cross
access easement must be provided from the access point on Research Park Drive
and extend across the site where the proposed parking lot access drive is
located. A 10’ utility easement is being
provided with this plat along the southern property line, and a 7.5’ utility
easement is being provided along the west property line. The property to the
west was platted as part of the Bobwhite Addition, and a 7.5’ utility easement
was dedicated on its east property line. There will be a 15’ utility easement
in this area. The developer has placed a
10’ utility easement for sanitary sewer lines along the front property line.
Floodplain
None of the subject property is encumbered with floodplain.
Conformance
The proposed lot meets the minimum lot area and dimension requirements
of the IBP Zoning District. The plat is generally in conformance with the Land
Development Code.
Summary
The final plat, as conditioned, is in concurrence with the requirements
for the IBP Zoning District and platting requirements in the Subdivision
Regulations.