Walnut
Street repaved from 4th Street to 7th Street
Replaced Curb
and gutter at
Installed
ramp at W. 2nd and
Concrete
repair on Natalie Drive
Installed new
ramp and remedied tripping hazard at 1020 Massachusetts Street
Base and curb
repaired at 1805
Installed
valley gutter at
Haskell Avenue milled
and overlaid from 15th St to 23rd St