Walnut Street repaved from 4th Street to 7th Street

 

 

 

Replaced Curb and gutter at 3014 Nathan Drive to eliminate drainage problem.  Replacement of settled sidewalk in progress.

 

 

 

Installed ramp at W. 2nd and McDonald Drive

 

 

 

Concrete repair on Natalie Drive

 

 

 

Installed new ramp and remedied tripping hazard at 1020 Massachusetts Street

 

 

 

Base and curb repaired at 1805 Hampton

 

 

 

Installed valley gutter at Murrow Ct and Yale

 

 

 

Haskell Avenue milled and overlaid from 15th St to 23rd St