MEMORANDUM
City of
Utilities Department
To: |
Dave Corliss Interim City Manager |
From: |
Chris Stewart Acting Director of Utilities |
Re: |
Variance for Connection Size
|
Date: |
August 14, 2006 |
I received a copy of the attached
letter from CL Mauer with Landplan Engineering, acting on behalf of the
We have reviewed the request with the Fire Marshall and also confirmed the maximum flow requirement of 300 gpm for the sprinkler system with the design engineer. The existing piping network in this area has an 8 inch water main on each end that supply water to the 6 inch line and are approximately 250 ft from the connection point on the 6 inch line. Consequently, the maximum flow of 300 gpm will have minimal impact to the system pressure in this area of the water distribution system. We have no objections to the granting of this variance, provided the design engineer is satisfied that the proposed design ensures adequate water supply to meet the fire flow requirements.
Please place on the
Please let me know if you have any questions.
c:
att.