Date

Project Name

Type of Project

Contractor

Engineer’s Estimate

Contract Price

2006

07/11/06

New Hampshire and Riverfront Plaza Parking Garages

Building Maintenance

Western Waterproofing

497,250.00

316,701.00

06/06/06

2006 Overlay Program, Phase III

Various Locations

Kansas Heavy

1,164,293.50

1,127,500.00

05/23/06

Airport Improvement Project

 

Hamm, Inc.

1,446,253.50

1,645,274.40

05/23/06

Iowa, Irving Hill Rd Overpass to Harvard; 23rd St., Harper to ECL

Milling, Overlay, Pavement Marking

LRM Industries

655,701.60

534,942.25

04/04/06

05/02/06

Kasold Drive, West 22nd St. to Bob Billings Pkwy.

Street, Storm Sewer, Waterline Improvements

Reject All Bids

RD Johnson

5,221,521.91

6,497,319.08

6,399,203.20

5,483,332.90

04/18/06

2006 Overlay Program, Phase II

Various Locations

RD Johnson

1,490,820.75

1,306,130.25

03/28/06

2006 Overlay Program, Phase I

Various Locations

LRM Industries

947630.60

1,100,431.15

 

2006 Crack Seal Program

Various Locations

Vance Bros.

500,000.00

452500.00

08/02/05

02/17/06

6th & Indiana

6th & Indiana, and 17th & Mass/New Hampshire

Sanitary Sewer

Reject All Bids

Nowak Construction

297,132.00

1,505,424.70

378,000.63

1,362,011.39

02/14/06

Wastewater Treatment Plant Manhole Replacement Project

Manhole Replacement

Midwest Environmental

60,000.00

49,642.42

01/17/06

PS-16

Design/Build, Pump Station Modifications

Burns & McDonnell/Garney

Waived Bidding

Waived Estimate

93,085

2005

12/27/05

Yale Rd., West of Iowa

Sidewalk Improvements

Morgan Concrete

29,245.00

28,624.00

10/25/05

Hanscom-Tappan Addition, 2nd Plat Street

Storm Sewer Improvements

RD Johnson

187,358.00

130,099.25

10/11/05

3rd Street, Alabama to Illinois

Street and Storm Sewer Improvements

LRM Industries

70,612.75

72,153.72

08/16/05

Fire Station #4

Fire Station

Champion Builders

2,111,240.00

2,281,240.00

08/09/05

Monterey Way, Stetson to Peterson, Peterson to Grand Vista Drive, Peterson Road, Kasold Drive to Monterey Way

 

King Construction Co.

5,474,442.00

4,178,265.04

06/07/05

2005 Overlay Program, Phase III

Various Locations

Kansas Heavy

814,428.75

708,355.33

05/31/05

2005 Overlay Program, Phase II

Various Locations

LRM Industries

827,537.20

767,065.55

05/31/05

2005 Chip and Seal Program

Various Locations

Vance Brothers

166,943.75

157,372.70

05/17/05

2005 Overlay Program, Phase I

Various Locations

LRM Industries

865,156.50

739,903.58

05/03/05

6th Street, Arkansas to Massachusetts

Milling, Overlay, Pavement Marking

LRM Industries

482,926.30

433,478.35

03/29/05

Downtown Waterline Improvements

Waterline Improvements

Nowak Construction

861,524.30

780,783.95

03/29/05

Folks Rd to Harvard Rd

Street, Storm sewer, and waterline

RD Johnson

925,366.00

599,218.40

03/29/05

Lake Pointe Drive, 22nd Terrace to Clinton Pkwy

Street, Storm sewer, and roundabout improve.

LRM Industries

859,071.05

817,740.00

2004

12/21/04

15th  & Lawrence

Stormwater Improvements

RD Johnson

98,538.00

71,915.00

12/21/04

8th to 9th , and Vermont to Kentucky

Alley Pavement Reconstruction

LRM Industries

167,600.00

77,224.00

12/14/04

Clinton Parkway and Wakarusa Relief Project

 

Nowak Construction

97,640.00

79,185.00

11/23/04

2236 East Drive

811 East 11th St.

Comprehensive Housing Rehabilitation

Reject Bids

19,840.00

22,500.00

32,777.00

32,444.00

10/26/04

19th & Learnard

Sanitary Sewer Improvement Project

RD Excavating

202,873.00

188,865.00

10/26/04

1525 E. 28th St.

Comprehensive Rehabilitation Program

Penny Construction

20,290.00

20,482.46

10/26/04

2708 Rawhide Lane

Comprehensive Rehabilitation Program

Old Home Depot, Inc.

24,031.50

24,069.42

10/26/04

2002 W. 27th St. Terrace

Comprehensive Rehabilitation Program

General Construction

17,690.00

25,377.00

10/26/04

3107 Longhorn Dr.

Comprehensive Rehabilitation Program

Old Home Depot, Inc.

15,432.10

9,987.50

09/14/04

Trail Road Relief Sewer

Relief Sewer

Meadows Const. Co.

303,544.00

395,088.05

08/31/04

2004 Overlay Program, Phase III

Various Locations

LRM Industries

704,915.50

575,753.80

07/06/04

2104 Tennessee

Comprehensive Rehabilitation Program

General Const., Inc.

29,500.00

30,963.00

07/06/04

1628 E. 18th Terrace

Comprehensive Rehabilitation Program

Old Home Depot, Inc.

25,000.00

17,173.00

06/29/04

2004 Chip & Seal Program

 

Vance Brothers

76,098.75

62,146.58

06/08/04

2004 Overlay Program, Phase II

Various Locations

Kansas Heavy Const.

808,716.20

730,118.05

05/25/04

Kaw Water Plant Control Room & Restroom

Building Improvements

B.A. Green Const. Inc.

150,000.00

145,190.00

05/25/04

2004 Waterline Improvements

Waterline improvements

Nowak

628,482.00

521,738.10

05/25/04

2004 Concrete Repair Program

 

Larking Excavating

556,100.00

280,650.04

05/25/04

204 North Minnesota

Comprehensive Rehabilitation Program

General Construction

13,500

15,290

05/25/04

1206 West 9th

Comprehensive Rehabilitation Program

General Construction

26,162.00

27,213.00

05/25/04

1206 West 9th Alternate

Comprehensive Rehabilitation Program

General Construction

Not estimated

7,160.00

05/25/04

1033 Rhode Island

Comprehensive Rehabilitation Program

Reject Bids

42,000.00

57,777.00

05/11/04

2004 Overlay Program

Various Locations

Asphalt Improve. Co.

666,611.70

496,403.05

04/27/04

6th St., Frontier Rd to Arkansas Street

Mill, overlay, pavement marking

LRM Industries

550,535.95

462,297.90

03/16/04

407 Elm Street

Comprehensive Rehabilitation Program

Old Home Depot, Inc.

9,500.00

11,535.00

03/09/04

New Jersey, 11th to 14th & East 12th, New Jersey to Delaware

Waterline Improvements

LaForge

311,045.20

206,097.20

03/09/04

W. 11th, Tennessee to Mass. & Vermont

Waterline Improvements

Emcon, Inc.

623,442.50

563,939.10

01/06/04

Habitat Neighborhood Addition No. 4

 

Fence & Property Gates

McElhaney Fence

22,895.00

17,550.00

2003

12/30/03

Fire Station No. 3

Renovation/Remodel

B.A. Green Const.

N/A

440,426.00

12/30/03

13th St. and Oregon St.

Stormwater improvements

Linaweaver Const.

2,999,350.00

2,255,079.48

12/30/03

Baker Ave, 16th to 22nd and 17th St. and New Hamp.

Street, Roundabout

R.D. Johnson

470,546.30

477,693.10

12/30/03

2003 Concrete Repair Program

Various locations

Kansas Heavy Const.

146,782.00

119,187.15

12/16/03

21st.St., Kentucky to Barker Court

Storm sewer improvements

R.D. Johnson

524,564.50

421,800.00

12/16/03

1649 Edgehill

Comprehensive Rehabilitation Program

General Construction

35,000.00

33,888.00

12/16/03

1345 New Jersey

Comprehensive Rehabilitation Program

L&S Sales & Service

9,000.00

12,994.00

12/16/03

1235 Kentucky

Comprehensive Rehabilitation Program

General Construction

30,000.00

33,777.00

11/04/03

Bus Shelters

Bus shelters

Penny Construction

N/A

65,269.20

10/28/03

31st St. & Nieder Road

Traffic Signal improvements

Larkin Excavating, Inc.

397,556.50

329,007.16

10/21/03

2001 Massachusetts St.

Comprehensive Rehabilitation Program

Clovis Construction

17,670.00

14,137.00

10/21/03

1810 Haskell

Comprehensive Rehabilitation Program

L&S Sales & Service

23,180.00

18,795.00

10/21/03

347 Elm

Comprehensive Rehabilitation Program

General Construction

33,826.00

26,371.00

10/21/03

Holcom Park

New Restroom

B.A. Green Const.

N/A

81,800.00

10/21/03

4th & Louisiana

Sanitary sewer project

Garney Companies

110,800.00

178,871.001

10/07/03

Crossgate Drive, North of Clinton Parkway

Street & retaining wall improvements

R.D. Johnson

89,822.00

69,656.80

09/23/03

Riverside sanitary sewer improvements

Pump station and sanitary sewer

Meadows Const.

812,947.00

1,016,609.80

08/26/03

Brook Creek Park

Gazebo

Morgan Conc. Services

N/A

36,500.00

08/26/03

Brook Creek Park

Rip Rap

R.D. Johnson

N/A

28,600.00

08/26/03

2003 Sidewalk Gap & Repair Program

Sidewalk

Penny Construction

191,392.50

157,661.10

08/08/03

Lawrence Carnegie Library

Building stabilization project

Penny Construction

N/A

341,490.72

08/08/03

6th St. & Lawrence Ave.

Traffic signal improvements

LRM Industries

273,831.30

252,875.47

08/08/03

2003 Overlay and Curb Repair Program

Various locations

R.D. Johnson

459,242.75

396,997.06

07/01/03

6th & Comet Lane

Geometric Improvements

LRM Industries

296,409.30

247,880.19

06/24/03

16th Street and Research Park Drive

Street, storm sewer & Waterline Improvement

King Construction

915,385.00

539,156.50

06/10/03

2003 Chip & Seal Project

Various Locations

Vance Brothers, Inc.

71,200.00

54,520.00

06/03/03

23rd St., Learnard Ave to Harper St. and North 3rd and Industrial Lane to North City Limits

Mill, Overlay and Pavement Marking

LRM Industries, Inc.

555,033.84

562,524.03

05/27/03

Oread Center

 

Clisso Company

129,025

96,251.00

05/06/03

2002 Phase II Waterline Improvements, Jayhawk Blvd/Oread Avenue

 

Rose-Lan Contractors

523,566.51

498,209.10

05/06/03

Yankee Tank Interceptor

 

McLouth Excavating

1,284,233.00

783,696.50

05/06/03

2003 Overlay and Curb Repair, Phase II

 

LRM Industries

1,079,018.90

889,983.95

04/22/03

1742 Learnard

 

Schmidt Construction

32,900.00

32,410.00

04/22/03

1201 W. 22nd Terrace

 

L & S Sales

16,700.00

12,988.00

04/22/03

2425 Overlook Circle

 

General Construction

29,750.00

31,509.002

04/15/03

2003 Overlay Program, Phase I

 

Asphalt Improve. Co.

779,190.00

708,544.20

04/08/03

Utah Ct. relief sewer and Pump Station decommissioning, 27th Street storm sewer

 

Rose-Lan Contractors

455,080.00

282,300.20

03/04/03

23rd & Louisiana

 

R.D. Johnson

33,425.00

22,130.00

03/04/03

Compost site, 11th & Haskell

 

LRM Industries

N/A

130,200.00

02/04/03

303 Eldridge Street

 

Master Plan Management

20,000.00

18,312.00

02/04/03

3201 W. 24th Street

 

Master Plan Management

24,900.00

20,688.00

02/04/03

1624 East 18th Terrace

 

Rejected

34,000.00

46,755.00

01/28/03

21st Street, Kentucky Street to Barker Ct.

 

Garney Company, Inc.

2,457,753.20

1,797,070.74

01/28/03

Portable generator

Portable Generator

Martin Tractor

90,000.00

69,972.00

01/21/03

Overland Drive, Wakarusa Dr. to Queen’s Rd.

 

King Construction

1,405,311.00

1,026,456.90

01/21/03

Congressional Drive, 6th St. to Overland Drive

 

King Construction

568,860.00

378,717.65

1  Engineer’s Estimate was prepared prior to Addendum.  Adding estimated cost of addendum to original estimate would raise Engineer’s estimate to $170,800.00 Contract amount awarded was still higher than estimate.

2  Bid from Schmidt Construction for $26,168.25 was rejected due to departmental project completion policy.

 

 

2002

12/30/02

North Michigan

Sanitary Sewer Improvements

Kahle Construction

Waived Bidding

45,000.00

12/30/02

2002 Waterline Improvements Phase IB

Waterline Improvements

Kahle Construction

201,649.50

168,462.40

12/30/02

2002 Waterline Improvements Phase IA

Waterline Improvements

Nowak Construction

300,049.00

258,309.90

11/12/02

East 11th St. Compost Site

Paving

LRM Industries

N/A

104,975.00

11/12/02

Force Main

Force Main/Fiber Optic Line

Razorback Const.

1,230,000.00

699,572.00

11/05/02

Lawrence Public Library

Building Improvements

Quality Electric

N/A

25,525.00

11/05/02

745 Ohio, Hearthstone House

Bathroom & Kitchen Renovation

Penny Construction

55,000.00

63,000.00

11/05/02

Weatherization Program

Weatherstripping of doors

Master Plan Management

5,500.00

2,897.00

11/05/02

Weatherization Program

Insulation

Midwest Insulation

10,500.00

10,575.00

11/05/02

Weatherization Program

Storm Windows

Advance Glass & Mirror

31,920.00

24,155.37

10/22/02

1000 Block Ohio, Section 4

Brick Street Repair

Kansas Heavy Const.

75,748.00

38,663.50

10/22/02

1200 Block New York, Section 3

Brick Street Repair

Penny Construction

12,567.60

9,261.22

10/22/02

900 Block Louisiana, Section 2

Brick Street Repair

Penny Construction

13,966.00

9,594.12

10/22/02

900 & 1200 Block Rhode Island, Section 1

Brick Street Repair

Penny Construction

22,292.00

17,489.50

10/22/02

Lime Residuals Processing Facility

 

CAS Construction

3,700,000.00

3,229,000

09/17/02

Lawrence Municipal Airport

Wetlands Mitigation

RD Johnson

40,000.00

130,885.00

09/17/02

Lawrence Municipal Airport

Relocation of Navigational Aids

Capital Electric

225,000.00

206,000.00

09/17/02

Lawrence Municipal Airport

Extension of Runway & Taxiway, Sch I & II

Hamm Asphalt Const.

2,131,734.40

1,789,018.58

09/17/02

1621 St. Andrews Dr.

Comprehensive Rehabilitation Program

Rejected

34,000.00

44,750.00

09/17/02

325 Clayton Court

Comprehensive Rehabilitation Program

General Construction

15,000.00

16,888.00

09/17/02

340 Pleasant Street

Comprehensive Rehabilitation Program

Master Plan Management

20,000.00

19,232.00

09/03/02

9th & Iowa

Waterline Improvements

Meadows Construction

209,578.50

183,750.25

09/03/02

2015 Stratford Road

Comprehensive Rehabilitation Program

Master Plan Management

34,000.00

44,795.003

08/27/02

2002 Sidewalk Repair

Sidewalk repair

Meadows Construction Co., Inc.

250,786.00

159,495.85

08/06/02

2002 Overlay & Curb Program

Various locations

RD Johnson

443,881.70

338,213.40

07/16/02

21st St., Stewart Ave. to Naismith Dr.

Storm sewer improvements

Rose-Lan Contractors

1,710,690.00

1,564,560.41

06/25/02

Clinton Parkway & Lawrence Avenue

Traffic signal, improvements

J. Warren Co., Inc.

137,500.00

106,135.00

06/18/02

The Maters at Alvamar & Sigma Nu Place

Concrete street repair & Storm sewer Improv.

Graybeal Constr. Co.

191,690.00

124,065.50

06/04/02

Bus shelter

Concrete & Installation

Musselman & Hall

N/A

38,372.00

05/28/02

Wakarusa Drive, Overland to Queen’s Rd

Street, storm sewer & Waterline Improvement

King Construction

1,668,571.50

1,506,156.95

05/28/02

2002 Overlay & Curb Repair

Lawrence Ave, 6th to Princeton Blvd. & Alvamar

LRM Industries

627,382.00

558,652.10

05/28/02

745 Ohio

Hearthstone Bathroom Remodel

Groen Bros. Const.

54,800.00

41,500.00

05/21/02

Ballard Community Center

Electrical Upgrade

Huxtable & Assoc.

24,200.00

20,400

05/14/02

Quail Creek Ct.

Channel crossing repair

Siterite Construction

38,750.00

28,910.00

05/14/02

6th St., Monterey Way to Wakarusa

Mill Overlay, pavement marking

RD Johnson

248,456.13

182,527.05

05/07/02

2002 Overlay & Curb Repair Program

Various Locations

DF Freeman

315,102.00

209,451.04

05/07/02

Atchison Street Pump Station

Decommissioning Project

Razorback Const.

20,950.00

19,601.00

04/23/02

2002 Overlay & Curb Repair Program

Various Locations

LRM Industries

392,255.00

316,410.90

04/16/02

McGrew Nature Trail

Nature Trail

BA Green Construction

190,000.00

162,500.00

04/16/02

2002 Overlay & Curb Repair Program

Downtown Streets

LRM Industries

237,823.00

190,654.85

04/09/02

1514 Craig Street

Comprehensive Rehabilitation Project

Master Plan Management

22,500.00

30,105.00

03/05/02

Westwood Hills – Baldwin Creek #2

Sanitary Sewer Improvements

McLouth Excavating

1,879,590.04

1,196,437.80

02/19/02

2001 Waterline Improvement Projects – Phase III

Waterline Improvements

Rose-Lan Contractors

455,626.04

543,720.50

02/05/02

East Hills Business Park

Sanitary Sewer Improvement

McLouth Excavating

96,349.00

59,286.00

01/22/02

812 Indiana St.

Comprehensive Rehabilitation Project

Rejected

N/A

39,807.00

01/22/02

817 Alabama (add alternate)

 

Rejected

N/A

34,109.00

01/22/02

817 Alabama

 

Rejected

N/A

32,001.00

01/22/02

1402 E. 18th St. Terr.

Comprehensive Rehabilitation Project

Master Plan Management

14,000.00

15,910.00

01/22/02

1826 New Hampshire

Comprehensive Rehabilitation Project

Master Plan Management

20,00.00

22,360.00

3  General Construction had a lower bid of 32,111.00; however bid was awarded to Master Plan Management, second lowest bidder, in the amount of 44,795.00

 

2001

12/18/01

Household Hazardous Waste Facility

Waterline Improvements

McLouth Excavating

44,842.00

29,811.00

12/11/01

Orchards Sanitary Sewer Creek Crossing

Repairs

Site Rite Construction

N/A

22,578.80

11/06/01

George Williams Way

Improvements

LRM Industries

Waved bidding

150,952.70

11/06/01

2001 Sidewalk Repairs

Sidewalk repairs

Penny Construction

56,743.00

50,396.21

11/06/01

Montana Street

Storm Sewer Repairs

Modern Engineering

36,242.00

30,400.00

11/06/01

Neighborhood Resources

Weather-stripping of doors

Master Plan Management

5,290.00

4,490.00

11/06/01

Neighborhood Resources

Insulation of Attics

Midwest Insulation, Inc.

15,651.00

9258.00

11/06/01

Neighborhood Resources

Storm Windows

Advanced Glass & Mirror

27,020.00

27,574.87

10/16/01

Crossgate Dr., 24th Place; 27th St., Crossgate Box Culvert

Street, Storm Sewer & Waterline Improvements

LRM Industries

1,492,583.50

1,341,251.15

09/25/01

Louisiana, 18th to Broken Arrow

Sidewalk Improvements

Paver’s, Inc.

288,107.50

177,637.00

09/25/01

Westwood (15th & Engel)

Sanitary Sewer Improvements

Meadows Construction

117,697.00

87,978.90

09/18/01

Lawrence Avenue, 6th to Homestead & Alvamar

Mill, overlay & curb repairs

LRM Industries

284,878.50

218,687.45

07/24/01

09/04/01

110 N. Michigan

Sanitary sewer improvements

Reject/Rebid on 09/04/01

Meadows Construction

16,070.00

43,781.404

26,510.00

08/28/01

Public Works Facility

Sanitary Sewer & Waterline Improvements

McLouth Excavating

84,357.00

63,783.00

08/28/01

22nd & Kasold

Geometric improvements

Meadows Construction

185,905.00

115,490.50

07/31/01

Clinton Parkway & Hawthorne Drive

Traffic signal improvements

Paver’s Inc.

254,834.00

258,702.00

07/31/01

Holcolm Sports Complex

Backstop replacement

Rejected/Reduced Scope

Penwell Equipment Co.

 

27,300.00

$74,741.00

20,885.005

07/17/01

2001 Concrete, Sidewalk & Pavement Repair

Concrete, Sidewalk & Pavement Repair

Paver’s, Inc.

397,272.00

272,367.00

07/10/01

2001 Overlay & Curb Repairs, Phase III

Mill, overlay & curb repairs

LRM Industries

358,063.50

345,593.65

06/26/01

23rd St., Iowa to Kentucky & Iowa, 31st to 33rd

Mill, overlay & pavement marking

LRM Industries

494,590.60

485,135.51

06/05/01

8th St., New York to New Jersey

Storm Water Improvement

McLouth Excavating

84,260.00

76,564.00

06/05/01

22nd & Alabama

Sanitary Sewer Rehabilitation

Modern Engineering

100,000.00

112,402.00

05/08/01

Inverness, Clinton Parkway to 24th  Place

Storm water & Waterline improvements

LRM Industries

1,398,671.20

1,099,191.70

04/24/01

2001 Overlay & Curb Repair, Phase II

Mill, Overlay & Curb Repair

LRM Industries

866,213.25

732,388.25

04/10/01

Downtown waterline project

Waterline Project

R.D. Kahlo

437,174.00

338,376.40

04/03/01

2001 Overlay & Curb Repair, Phase I

Mill, Overlay & Curb Repair

LRM Industries

704,307.00

572,452.60

03/27/01

Crossgate Dr., Clinton Parkway to 24th St.

Street, storm sewer & traffic signal improve.

RD Johnson

701,968.00

395,971.64

01/02/01

6th St., Kasold, Atchison Ave., Harper, 19th & Haskell

Neighborhood Sidewalk Improvements

Penny Construction

242,900.00

187,529.09

4  For  the initial bid on 7/25/01, Contractors misunderstood scope and overestimated amount of work to be done on the project, resulting in significantly high bids.  Reduction in scope still resulted in a bid higher than the Engineer’s estimate.

5 The bid for this project was broken out into eight parts and only the backstop and Ice Field wing fences were accepted.  Apex Fence was the low bid, but did not attend the required pre-bid meeting; therefore, the recommendation was to accept the 2nd lowest bid from Penwell Equipment Co.  Apex Fence bid $63,234.00.

 

2000

11/28/00

Southeast Pump Station Force Main

Sanitary Sewer

Garney Company

N/A

1,316,291.00

11/28/00

PD Substation

New Roof

Diamond Everly

N/A

100,820.00

11/21/00

Peterson Rd & Monterey Way

Sanitary Sewer Improvements

Razorback Contractors

1,062,250.00

782,619.20

11/21/00

Fire Medical Station No 3

Parking lot addition, Building pad, Storm water

May Contractors

N/A

77,900.00

11/07/00

O’Connell Road

Waterline improvements

Havens Construction

341,046.40

255,677.00

11/07/00

Kasold, Clinton Pkwy, to SLT

Rec Path Improvement

Razorback Contractors

1,086,579.50

958,112.50

11/07/00

Plaza West Building for PD

General Construction

Penny Construction

N/A

138,844.37

11/07/00

1632 Ohio

Comprehensive Rehabilitation Project

Armstrong Construction

11,500.00

12,270.00

11/07/00

909 New York

Comprehensive Rehabilitation Project

Armstrong Construction

24,000.00

21,325.00

11/07/00

Weatherization Program

Weatherstripping of doors

Master Plan Management

6,210.00

3,294.60

11/07/00

Weatherization Program

Storm Windows

Advanced Glass & Mirror

15,025.00

12,189.81

11/07/00

Weatherization Program

Insulation

Midwest Insulation

10,086.75

6,260.07

10/24/00

North 3rd & 7th Streets

2000 sidewalk construction

Penny Construction

15,575.00

16,607.10

10/24/00

Barker, Connecticut, Delaware, etc.

Sidewalk repairs

Penny Construction

97,638.00

71,604.20

10/17/00

8th & Pennsylvania

Storm sewer improvements

McLouth Excavating

65,597.00

56,286.10

10/10/00

900 & 1000 Block Ohio St.

Brick street repair

Price Asphalt Concrete

311,244.00

184,592.58

10/03/00

Kaw Plant

Roof replacement

Diamond Everly

N/A

98,800.00

09/26/00

Iowa south of 31st

Curb & Gutter Replacement

RD Johnson

211,301.00

157,509.80

09/26/00

Parkside Addition No. 2

Street, storm sewer & Waterline Improvements

LRM Industries

209,719.00

149,194.00

09/19/00

Inverness Park

Drainage channel improvements

Larkin Excavating

892,876.00

407,033,.39

09/19/00

Habitat Neighborhood Addition No. 4

Street, Storm Sewer & Waterline Improvements

LRM Industries

238,256.50

241,517.75

09/12/00

2000 Waterline Improvement Project

Waterline

Clisso Company

334,641.20

310,691.00

09/12/00

Centennial Park

Improvements

B.A. Green

N/A

207,439.93

09/05/00

Prairie Park Trail project

Trails

Penny Construction

N/A

302,577.00

08/22/00

24th Place, Crossgate Dr. to Inverness

Street, Storm sewer & Waterline Improvements

RD Johnson

1,213,867.00

910,017.35

08/08/00

Wastewater Plant Expansion Project

Sanitary Sewer

Danis Environmental

N/A

37,511,360.00

08/08/00

Scottsdale St., 26th to 27th St.

Storm sewer improvement

LRM Industries

65,177.00

73,583.75

08/08/00

27th St., Bluestem Dr. to Scottsdale

Storm Sewer & Waterline Improvements

LRM Industries

102,762.00

156,390.20

08/08/00

27th & Wakarusa Drive

Street & Storm Sewer Improvements

LRM Industries

100,789.00

125,875.10

07/25/00

Centennial Park

Parking Lot Improvements

Penny Construction

38,000.00

34,997.77

07/25/00

Lyons Park

Restrooms

Penny Construction

N/A

49,997.77

07/11/00

Habitat Neighborhood Addition No. 4

Sanitary Sewer Improvements

Razorback Contractors

91,478.00

99,116.40

06/27/00

23rd & Alabama

Traffic Signal Improvements

LRM Industries

340,114.60

317,046.39

06/06/00

Harvard & Iowa

Traffic Signal Improvements

LRM Industries

44,385.00

36,977.35

06/06/00

15th & Engel; 15th & Iowa

Median Improvements

J. Warren Co., Inc.

177,620.00

102,761.30

05/30/00

South Park

Wading Pool & Restroom

Penny Construction

212,104.00

207,473.75

05/30/00

Community Drop-In Center

Office Rehab

General Construction

N/A

35,932.00

05/23/00

6th Street along High Pointe Apartments

Storm Water Improvements

Bazin Excavating

69,325.00

36,197.00

05/16/00

Iowa, North of 31st to South of 19th

Resurfacing

LRM Industries

417,371.19

421,632.02

05/16/00

8th St., Connecticut to New York

Storm Sewer Improvements

Larkin Excavating

114,989.00

125,417.71

05/09/00

2701 Delaware

Wakarusa Pump Station Rehab Project

CAS Construction

Waived Bidding

134,700.00

05/09/00

Western Hills Sanitary Sewer District

Sanitary Sewer

Garney Companies

1,017,550.00

1,045,690.00

05/09/00

George Williams Way

 

RD Johnson

829,490.00

629,589.45

05/02/00

Michigan St., 7th to 9th St.

Storm Sewer & Waterline Improvements

Meadows Construction

590,671.00

567,442.85

04/25/00

2000 Curb & Inlet Repair

Curb & Inlet

D.F. Freeman

322,260.00

196,287.93

04/11/00

2000 Overlay & Curb Repair, Phase II

Various Locations

D.F. Freeman

475,458.00

398,585.40

04/11/00

2000 Overlay & Curb Repair, Phase I

Mill, Overlay & Curb Repair

D.F. Freeman

546,629.50

433,897.67

04/04/00

2000 Overlay & Curb Repair, Phase I

Mill, Overlay & Curb Repair

LRM Industries

571,573.65

505,703.81

03/28/00

Langston Hughes

Sanitary Sewer

McLouth Excavating

N/A

38,021.00

03/28/00

East Hills Business Park

Sanitary Sewer

McLouth Excavating

187,871.00

95,830.00

02/08/00

1999 Chip & Seal Program

Streets

LRM Industries

37,898.25

32,625.45

01/18/00

Downtown Parking Lot Improvements

 

RD Johnson

245,282.00

214,805.95

01/04/00

1713 Maple Lane

Comprehensive Rehabilitation Project

L&S Construction

16,000.00

10,999.00

01/04/00

2014 Hillview

Comprehensive Rehabilitation Project

General Construction

17,000.00

19,787.00

01/04/00

431 Elm

Comprehensive Rehabilitation Project

General Construction

18,000.00

15,456.00