Project:      19th and Louisiana Intersection Improvements

 

·        Widen 19th Street from Louisiana west to Illinois to provide center turn lane.

·        Widen 19th Street east of Louisiana to Ohio Street to provide for a left (southbound) turn lane onto Louisiana.

·        Install/construct bus turnout on Louisiana Street (this is a non-participating item estimated at $40,000).

 

 

Description

Quantity

Units

Unit Price

Total Price

1

Clearing & Grubbing

1

L.S.

$      5,000.00

$      5,000.00

2

Removal of Existing Structures

1

L.S.

25,000.00

 

25,000.00

 

3

Unclassified Excavation

900

C.Y.

15.00

13,500.00

4

Type B Compaction (MR-90)

350

C.Y.

9.00

3,150.00

5

Milling

6,500

S.Y.

40.00

26,000.00

6

6” AB-3 Base

1,100

S.Y.

16.00

17,600.00

7

8” Concrete Pavement for Widening (A.E.)

700

S.Y.

65.00

45,500.00

8

2” Asphalt Overlay (BM-2)

800

Tons

60.00

48,000.00

9

4” Concrete Pavement (Reinforced)(A.E.)

500

S.Y.

50.00

25,000.00

10

6” Concrete Pavement (Reinforced)(A.E.)

500

S.Y.

45.00

22,500.00

11

Concrete Curb and Gutter (A.E.)

3,000

L.F.

20.00

60,000.00

12

Concrete Sidewalk (4”)(A.E.)

550

S.Y.

29.00

15,950.00

13

Access Ramp

12

Each

2,000.00

24,000.00

14

Std. Curb Inlet (Precast)

2

Each

3,500.00

7,000.00

15

15” Storm Sewer (RCP)

20

L.F.

200.00

4,000.00

16

Relocate Fire Hydrant

2

Each

2,000.00

4,000.00

17

Signal

1

L.S.

200,000.00

200,000.00

18

Pavement Markings

1

L.S.

10,000.00

10,000.00

19

Traffic Control

1

L.S.

12,000.00

12,000.00

20

Construction Staking

1

L.S.

9,000.00

9,000.00

21

Seeding, Fertilizing and Mulching

1

L.S.

5,000.00

5,000.00

22

Mobilization

1

L.S.

12,000.00

12,000.00

Subtotal

 

$   594,200.00

20% Contingency

 

120,000.00

 

 

$   715,000.00

Preliminary Engineering/Construction Engineering

 

75,000.00

 

 

$   800,000.00