Project: 19th and Louisiana Intersection Improvements
· Widen 19th Street from Louisiana west to Illinois to provide center turn lane.
· Widen 19th Street east of Louisiana to Ohio Street to provide for a left (southbound) turn lane onto Louisiana.
· Install/construct bus turnout on Louisiana Street (this is a non-participating item estimated at $40,000).
|
Description |
Quantity |
Units |
Unit Price |
Total Price |
1 |
Clearing & Grubbing |
1 |
L.S. |
$ 5,000.00 |
$ 5,000.00 |
2 |
Removal of Existing Structures |
1 |
L.S. |
25,000.00
|
25,000.00
|
3 |
Unclassified Excavation |
900 |
C.Y. |
15.00 |
13,500.00 |
4 |
Type B Compaction (MR-90) |
350 |
C.Y. |
9.00 |
3,150.00 |
5 |
Milling |
6,500 |
S.Y. |
40.00 |
26,000.00 |
6 |
6” AB-3 Base |
1,100 |
S.Y. |
16.00 |
17,600.00 |
7 |
8” Concrete Pavement for Widening (A.E.) |
700 |
S.Y. |
65.00 |
45,500.00 |
8 |
2” Asphalt Overlay (BM-2) |
800 |
Tons |
60.00 |
48,000.00 |
9 |
4” Concrete Pavement (Reinforced)(A.E.) |
500 |
S.Y. |
50.00 |
25,000.00 |
10 |
6” Concrete Pavement (Reinforced)(A.E.) |
500 |
S.Y. |
45.00 |
22,500.00 |
11 |
Concrete Curb and Gutter (A.E.) |
3,000 |
L.F. |
20.00 |
60,000.00 |
12 |
Concrete Sidewalk (4”)(A.E.) |
550 |
S.Y. |
29.00 |
15,950.00 |
13 |
Access Ramp |
12 |
Each |
2,000.00 |
24,000.00 |
14 |
Std. Curb Inlet (Precast) |
2 |
Each |
3,500.00 |
7,000.00 |
15 |
15” Storm Sewer (RCP) |
20 |
L.F. |
200.00 |
4,000.00 |
16 |
Relocate Fire Hydrant |
2 |
Each |
2,000.00 |
4,000.00 |
17 |
Signal |
1 |
L.S. |
200,000.00 |
200,000.00 |
18 |
Pavement Markings |
1 |
L.S. |
10,000.00 |
10,000.00 |
19 |
Traffic Control |
1 |
L.S. |
12,000.00 |
12,000.00 |
20 |
Construction Staking |
1 |
L.S. |
9,000.00 |
9,000.00 |
21 |
Seeding, Fertilizing and Mulching |
1 |
L.S. |
5,000.00 |
5,000.00 |
22 |
Mobilization |
1 |
L.S. |
12,000.00 |
12,000.00 |
Subtotal |
|
$ 594,200.00 |
|||
20% Contingency |
|
120,000.00 |
|||
|
|
$ 715,000.00 |
|||
Preliminary Engineering/Construction Engineering |
|
75,000.00 |
|||
|
|
$ 800,000.00 |