City of Lawrence
Project 01-SR1-106(S)
Iowa Street, Irving Hill Road Overpass to Harvard Road;
23rd Street, Harper Street to East City Limits
Milling, Overlay, Pavement Marking (KLINK)
BID TAB
Engineer's Estimate:  $655,701.60
Bid Date:  May 16, 2006
IOWA STREET (U.S. 59 HIGHWAY) - SECTION 1
        LRM Industries, Inc. Asphalt Improvement Co.
Item Description Quantity Unit Unit Price Amount Unit Price Amount
1 Mobilization 1 L.S.  $   5,300.00  $      5,300.00  $   2,000.00  $      2,000.00
2 Milling 2" Depth (P) 27,350 S.Y.  $           1.40  $    38,290.00  $           1.75  $    47,862.50
3 Asphaltic Concrete (BM-2, Special) 2" Overlay (P)* 3,159 TON  $         51.70  $  163,320.30  $         49.50  $  156,370.50
4 Concrete Pavement Patch (Full Depth) (P)** 281 S.Y.  $         90.00  $    25,290.00  $       120.00  $    33,720.00
5 Asphalt Pavement Patch (Full Depth) (P)** 100 TON  $       100.00  $    10,000.00  $       100.00  $    10,000.00
6 Crackfilling (P)** 100 L.F.  $           0.60  $            60.00  $           2.00  $         200.00
7 Traffic Control (P) 1 L.S.  $ 11,640.00  $    11,640.00  $ 12,500.00  $    12,500.00
8 6" Broken White Lane Line (Class A) (P)  2,060 L.F.  $           3.60  $      7,416.00  $           3.68  $      7,580.80
9 6" Dotted White Lane Line (Class A) (P) 212 L.F.  $           3.60  $         763.20  $           3.68  $         780.16
10 6" Solid White Channelization Line (Class A) (P) 1,349 L.F.  $           3.60  $      4,856.40  $           3.68  $      4,964.32
11 12" Solid White Chevron Line (Class A) (P) 183 L.F.  $           8.25  $      1,509.75  $           8.40  $      1,537.20
12 24" Solid White Stop Line (Class A) (P)  182 L.F.  $           9.25  $      1,683.50  $           9.45  $      1,719.90
13 36" Solid White Crosswalk Line (Class A) (P) 378 L.F.  $         13.50  $      5,103.00  $         13.65  $      5,159.70
14 4" Broken Yellow Lane Line (Class B) (P) 140 L.F.  $           2.15  $         301.00  $           2.20  $         308.00
15 4" Solid Yellow Lane Line (Class B) (P)  500 L.F.  $           2.15  $      1,075.00  $           2.20  $      1,100.00
16 4" Solid Double Yellow Lane Line (Class B) (P)*** 3,542 L.F.  $           4.65  $    16,470.30  $           4.20  $    14,876.40
17 Left Turn Lane -- Use Arrow (P) 18 EACH  $       310.00  $      5,580.00  $       315.00  $      5,670.00
18 Right Turn Lane -- Use Arrow (P) 2 EACH  $       310.00  $         620.00  $       315.00  $         630.00
19 Traffic Manhole Adjustment (NP)** 1 EACH  $       745.00  $         745.00  $       800.00  $         800.00
20 Water Valve Box Adjustment (NP)** 3 EACH  $       185.00  $         555.00  $       250.00  $         750.00
21 Loop Detector Installation (P)** 1,352 L.F.  $         10.10  $    13,655.20  $         10.00  $    13,520.00
  GRAND TOTAL - SECTION 1        $  314,233.65    $  322,049.48
 
23RD STREET (K-10 HIGHWAY) - SECTION 2  
        LRM Industries, Inc. Asphalt Improvement Co.
Item Description Quantity Unit  Unit Price   Amount  Unit Price Amount
1 Mobilization 1 L.S.  $   5,300.00  $      5,300.00  $   2,000.00  $      2,000.00
2 Milling 2" Depth (P) 15,147 S.Y.  $           1.70  $    25,749.90  $           1.75  $    26,507.25
3 Asphaltic Concrete (BM-2, Special) 2" Overlay (P)* 1,750 TON  $         50.45  $    88,287.50  $         49.50  $    86,625.00
4 Concrete Pavement Patch (Full Depth) (P)** 564 S.Y.  $         90.00  $    50,760.00  $       120.00  $    67,680.00
5 Asphalt Pavement Patch (Full Depth) (P)** 100 TON  $       100.00  $    10,000.00  $       100.00  $    10,000.00
6 Crackfilling (P)** 100 L.F.  $           0.60  $            60.00  $           2.00  $         200.00
7 Traffic Control (P) 1 L.S.  $   6,860.00  $      6,860.00  $   7,500.00  $      7,500.00
8 6" Broken White Lane Line (Class A) (P)  930 L.F.  $           3.35  $      3,115.50  $           3.42  $      3,180.60
9 6" Dotted White Lane Line (Class A) (P) 114 L.F.  $           3.35  $         381.90  $           3.42  $         389.88
10 6" Solid White Channelization Line (Class A) (P) 664 L.F.  $           3.35  $      2,224.40  $           3.42  $      2,270.88
11 24" Solid White Stop Line (Class A) (P)  80 L.F.  $           9.25  $         740.00  $           9.45  $         756.00
12 36" Solid White Crosswalk Line (Class A) (P) 132 L.F.  $         13.50  $      1,782.00  $         13.65  $      1,801.80
13 4" Broken Yellow Lane Line (Class B) (P) 640 L.F.  $           2.15  $      1,376.00  $           2.16  $      1,382.40
14 4" Solid Yellow Lane Line (Class B) (P)  2,755 L.F.  $           2.15  $      5,923.25  $           2.16  $      5,950.80
15 4" Solid Double Yellow Lane Line (Class B) (P)*** 359 L.F.  $           4.25  $      1,525.75  $           4.31  $      1,547.29
16 Left Turn Lane -- Use Arrow (P) 18 EACH  $       260.00  $      4,680.00  $       262.50  $      4,725.00
17 Right Turn Lane -- Use Arrow (P) 11 EACH  $       260.00  $      2,860.00  $       262.50  $      2,887.50
18 Storm Sewer Manhole Adjustment (NP) ** 4 EACH  $       695.00  $      2,780.00  $       800.00  $      3,200.00
19 Loop Detector Installation (P)** 624 L.F.  $         10.10  $      6,302.40  $         10.00  $      6,240.00
  GRAND TOTAL - SECTION 2        $  220,708.60    $  234,844.40
   
  GRAND TOTAL - SECTION 1 AND SECTION 2        $  534,942.25    $  556,893.88