HARVARD ROAD, George Williams Way east approximately 500 feet
STREET, STORM SEWER, WATERLINE IMPROVEMENTS
PROJECT NO. 45-CP10-903(BD)
RESOLUTION NO. 6503 = $550,000
July 19, 2004
MAXIMUM ASSESSMENTS
Engineering-street, storm sewer $32,786.25 Stultz provides 8.6% up front ($971.36 paid)
Engineering-waterline $4,071.00 Stultz provides 17.2% up front ($241.22 paid)
Engineering - reinforced concrete box (city) $10,576.50
Construction-street, storm sewer (estimate) $446,536.00 Stultz provides 8.6% up front
Construction-waterline (estimate) $47,420.00 Stultz provides 17.2% up front
Construction - reinforced concrete box (estimate) (city) $160,000.00
Inspection/Administration $14,818.68
Legal & Issuance Costs $16,348.90
Interest on Temporary Notes $32,697.80
Subtotal $765,255.13
Less:  City Share - reinforced concrete box culvert $170,576.50
TOTAL $594,678.63
Plate No. Property Owner Lot Number Square Footage Assessment. Per Tract ($)
Parcel 1 (34.45%):  $                   204,866.79
U15802 Harvard LC 976,315  $                   149,816.20
U15802A Alvamar, Inc. 20,089  $                       3,082.67
U15802B Alvamar, Inc. 273,429  $                     41,957.87
U15802C Alvamar, Inc. 65,233  $                     10,010.05
1,335,066 204,866.79
Parcel 2 (65.55%):  $                   389,811.84
U15817-01 City of Lawrence - north side 98,801  $                     58,293.03
U15817-01 City of Lawrence - south side 561,892  $                   331,518.81
660,693  $                   389,811.84
 $                   594,678.63