HARVARD ROAD, George Williams Way east approximately 500 feet |
|
|
|
STREET,
STORM SEWER, WATERLINE IMPROVEMENTS |
|
|
PROJECT NO.
45-CP10-903(BD) |
|
|
|
RESOLUTION
NO. 6503 = $550,000 |
|
|
|
July 19, 2004 |
|
|
|
MAXIMUM
ASSESSMENTS |
|
|
|
|
|
|
|
|
|
|
Engineering-street,
storm sewer |
$32,786.25 |
Stultz provides 8.6% up
front ($971.36 paid) |
|
Engineering-waterline |
$4,071.00 |
Stultz provides 17.2% up
front ($241.22 paid) |
Engineering
- reinforced concrete box (city) |
$10,576.50 |
|
|
Construction-street,
storm sewer (estimate) |
$446,536.00 |
Stultz provides 8.6% up
front |
|
Construction-waterline
(estimate) |
$47,420.00 |
Stultz provides 17.2% up
front |
|
Construction
- reinforced concrete box (estimate) (city) |
$160,000.00 |
|
|
Inspection/Administration |
$14,818.68 |
|
|
Legal &
Issuance Costs |
$16,348.90 |
|
|
Interest on
Temporary Notes |
$32,697.80 |
|
|
Subtotal |
|
$765,255.13 |
|
|
Less: City Share - reinforced concrete box
culvert |
$170,576.50 |
|
|
TOTAL |
|
$594,678.63 |
|
|
|
|
|
|
|
|
|
|
|
|
Plate No. |
Property Owner |
Lot Number |
Square Footage |
Assessment. Per Tract ($) |
|
|
|
|
|
Parcel 1 (34.45%): |
|
|
$ 204,866.79 |
|
U15802 |
Harvard LC |
|
976,315 |
$ 149,816.20 |
|
U15802A |
Alvamar, Inc. |
|
20,089 |
$ 3,082.67 |
|
U15802B |
Alvamar, Inc. |
|
273,429 |
$ 41,957.87 |
|
U15802C |
Alvamar, Inc. |
|
65,233 |
$ 10,010.05 |
|
|
|
1,335,066 |
204,866.79 |
|
|
|
|
|
|
|
Parcel 2 (65.55%): |
|
|
$ 389,811.84 |
|
U15817-01 |
City of Lawrence - north side |
|
98,801 |
$ 58,293.03 |
|
U15817-01 |
City of Lawrence - south side |
|
561,892 |
$ 331,518.81 |
|
|
660,693 |
$ 389,811.84 |
|
|
|
|
|
|
|
$ 594,678.63 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|